Abstract
In chapter three the mechanism and the function of contractor-led procurement either in the form of Design and Build, Turn-key and BOT was explained. Now it is time to address contractor-led procurement in more depth, particularly from the point of view of its appropriateness for delivering clients’ construction needs and where it is less so. It will draw on the discussion of earlier chapters, especially those on market trends and individual participants’ objectives and behaviour, in order to establish what contractor-led models of construction procurement can offer to the client to satisfy his construction requirements.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Kubal, Miller, Worth, 2000, pp. 18; Rösel, 1994, pp. 12.
Ling, Khee and Lim, 2001.
Dielschneider, 2000, p. 29.
Ling, Khee and Li, 2001.
Watson and Speak, 2001, p. 24.
Walker, 1996, p. 211.
Seely, 1997, p. 100.
Walker, 1996, p. 146.
Hughes, Gray and Murdoch, 1997, p. 31; Levey, 1999, p. 240; Simm, 2000.
Walker, 1996, p. 146.
See also chapter 6.2 and 6.3 for appropriate application.
Ling, Khee and Lim, 2001.
Construction Industry Institute, 1997.
Ling, Khee and Lim, 2001.
Hughes, Gray and Murdoch, 1997, p. 31.
Smith, 1995, pp. 246.
Halpin and Woodhead, 1998, p. 72.
Kubal, Miller and Worth, 2000, p. 336.
CIOB, 1999, p. 100.
Smith, 1995, p. 192.
Kubal, Miller and Worth, 2000, pp. 336; Ling, Khee and Lim, 2001; Seely, 1997, p. 100.
Kubal, Miller and Worth, 2000, p. 336.
Smith, 1995, p. 264.
CIOB, 1999, p. 118; Smith, 1995, p. 192.
Hill, 2000, p. 7.
See section 3.3.2 for an explanation of Guaranteed Maximum Price.
Smith, 1995, p. 244.
See section 5.1.2 for additional information on “partnering”.
Simm, 2000.
Emzen and Schexnayder, 2000.
Ling, Knee and Lim., 2001.
Erzen and Schexnayder, 2000.
Levey; 1999, p. 239.
Now the Design Build Foundation (www.dbf-web.co.uk).
Ibid., 239; Ling, Knee and Lim, 2001.
e.g. Dielschneider, 2000; Halpin and Woodhead, 1998; Kubal, Miller and Worth, 2000; Levey, 1999; Ling, Khee and Lim, 2000; Wong, Holt and Cooper., 2000.
PSMJ Design-Build statistics survey, 1995.
Zweig, White and Associates (Natich, Mass.): Design-Build survey of architecture, engineering, environmental consulting, construction and design-build firms, 1997.
Ernzen and Schexnayder, 2000.
e.g. Jacob and Kochendörfer, 2000.
Arthur Andersen and Enterprise LSE, 2001.
Halpin and Woodhead, 1998, p. 72; Kubal, Miller and Worth, 2000, p. 335; Levey, 1999, p. 238; Simm, 2000.
Hill, 2000, p. 1.
Ibid. p. 3.
Halpin and Woodhead, 1998, p. 72; Kubal, Miller and Worth, 2000, p. 335; Levey, 1999, p. 238.
Smith, 1995, p. 192.
Simm, 2000.
Hughes, Gray and Murdoch, 1997, p. 31.
Levey, 1999. p. 238.
See section 5.2.3 for alternative approaches of design completion.
Kubal, Miller and Worth, 2000, p. 344.
Ling, Khee and Lim, 2001.
CAD = Computer Aided Design.
Kubal, Miller and Worth, 2000, p. 337.
Seely, 1997, p. 99.
Cox and Townsend, 1998, pp. 258.
David Langdon & Everest, 2002; Gibb and Isack, 2001; Hughes, Gray and Murdoch, 1997, p. 59.
Smith, 1995, pp. 243.
Ling, Knee and Lim, 2001.
Walker, 1996, p. 212.
Smith, 1995, p. 192.
Simm, 2000.
Walker, 1996, p. 211.
Ling, Khee and Lim, 2001.
Wlassak, 2001.
CIOB, 1999, p. 117.
Ling, Khee and Lim, 2001.
Smith, 1995, p. 192.
Ibid. p. 265.
Ling, Khee and Lim, 2001; Simm, 2000; Walker, 1996, p. 212.
Seely, 1997, pp. 97.
Ling, Khee and Lim, 2001.
Dielschneider, 2000, p. 29.
Dielschneider, 2000, p. 30.
Ibid. 29.
Smith, 1995, p. 192.
Seely, 1997, p. 98.
Smith, 1995, p. 243.
CIOB, 1999, p. 47.
Seely, 1997, p. 98.
CIOB, 1999, p. 117.
Ibid. p. 117, Seely, 1997, p. 98.
see chapter three.
Ling, Khee and Lim, 2001.
Hughes, Gray and Murdoch, 1997, p. 31.
CIOB, 1999, p. 117.
Levey, 1999, p. 239.
Ibid. p. 289.
Ling, Khee and Lim, 2001.
Smith, 1995, p. 249.
Hughes, Gray and Murdoch, 1997, p. 31.
Cox and Townsend, 1998, p. 37; Dielschneider, 2000, p. 30; Ling, Khee and Lim, 2001; Pilcher, 1997, p. 28; Seely, 1997, p. 99.
Walker, 1996, p. 214.
Seely, 1997, p. 99.
Kubal, Miller and Worth, 2000, p. 354.
Ibid. p. 355.
Kubal, Miller and Worth, 2000, p. 353.
Barnes, 2001; Sterling 2001.
Walker, 1996, p. 211.
Masters, 1998, pp. 10.
Howell, 1999, pp. 34.
Barnes, 2001.
Gralla, 2001, pp. 81; Kochendörfer and Liebchen, 2001, pp. 58; Sommer, 2000, pp. 9.
Rights and permissions
Copyright information
© 2003 Deutscher Universitäts-Verlag/GWV Fachverlage GmbH, Wiesbaden
About this chapter
Cite this chapter
Winter, C. (2003). Contractor-led Scenarios. In: Contractor-Led Procurement. Baubetriebswirtschaftslehre und Infrastrukturmanagement. Deutscher Universitätsverlag. https://doi.org/10.1007/978-3-322-81614-6_4
Download citation
DOI: https://doi.org/10.1007/978-3-322-81614-6_4
Publisher Name: Deutscher Universitätsverlag
Print ISBN: 978-3-8244-7947-4
Online ISBN: 978-3-322-81614-6
eBook Packages: Springer Book Archive