Skip to main content

Integrated Company-Wide Management System (ICWMS)

  • Chapter
  • First Online:
An Integrated Company-Wide Management System
  • 1518 Accesses

Abstract

Traditionally, various MSs are implemented without being properly integrated together leading to waste of resources. Recently, MSs have gained attention as they form a critical infrastructure for improving and controlling the operation systems . However, there is a gap in the form of a need, as indicated in the literature, for a comprehensive system that integrates them together. This integration constitutes the goal of the proposed system, which is ensuring the existence of an infrastructure for Continuous Improvement (CI) and the strategic alignment of all areas of a business and the people toward the objectives of Business Excellence . The proposed system is called the Integrated Company-Wide Management System (ICWMS) . ICWMS’s five main components are strategic, project, operation, process, and performance MSs.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 139.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Notes

  1. 1.

    This chapter is mainly prepared based on our published works:

    • Salah, S., Rahim, A., and Carretero, J. A. (2013) Total Company-Wide Management System (TCWMS): Its Components. Int. J. Business Excellence, Vol. 6, No. 2, pp.161–191.

    • Salah, S., Carretero, J. A., and Rahim, A. (2010) Total Company-Wide Management System (TCWMS): Case Studies. J. Industrial Technology, Vol. 26, No. 2, pp. 1–14.

    • Salah, S., Rahim, A., and Carretero, J. A. (2011) Total Company-Wide Management System (TCWMS): culture change management considerations. Int. J. Strategic Change Management, Vol. 3, No. 4, pp. 260–280.

    • Salah, S. (2015) A project selection, prioritisation and classification approach for organisations managing Continuous Improvement (CI). Int. J. Project Organization and Management, Vol. 7, No. 1, pp. 98–110.

References

  • American Productivity and Quality Center (APQC). (2008). Retrieved April 11, from http://www.apqc.org/portal/apqc/site.

  • Andersen, H. V., Lawrie, G., & Savic, N. (2004). Effective quality management through third-generation balanced scorecard. International Journal of Productivity and Performance Management, 53(7), 634–645.

    Article  Google Scholar 

  • Anderson, R., Eriksson, H., & Torstensson, H. (2006). Similarities and differences between TQM, six sigma and lean. The TQM Magazine, 18(3), 282–296.

    Article  Google Scholar 

  • Antony, J. (2004). Some pros and cons of six sigma: An academic perspective. The TQM Magazine, 16(4), 303–306.

    Article  Google Scholar 

  • Antony, J. (2006). Six sigma for service processes. Business Process Management Journal, 12(2), 234–248.

    Article  Google Scholar 

  • Antony, J. (2007). Is six sigma a management fad or fact? Assembly Automation, 27(1), 17–19.

    Article  MathSciNet  Google Scholar 

  • Antony, J. (2008). What is the role of academic institutions for the future development of six sigma? International Journal of Productivity and Performance Management, 57(1), 107–110.

    Article  MathSciNet  Google Scholar 

  • Antony, J., & Banuelas, R. (2002). Key ingredients for the effective implementation of six sigma program. Measuring Business Excellence, 6(4), 20–27.

    Article  Google Scholar 

  • Banuelas, R., Antony, J., & Brace, M. (2005). An application of six sigma to reduce waste. Quality and Reliability Engineering International, 21(6), 553–570.

    Article  Google Scholar 

  • Banuelas, R., & Antony, J. (2002). Critical success factors for the successful implementation of six sigma projects in organizations. The TQM Magazine, 14(2), 92–99.

    Article  Google Scholar 

  • Barber, K. D., Munive-Hernandez, J. E., & Keane, J. P. (2006). Process-based knowledge management system for continuous improvement. International Journal of Quality and Reliability Management, 23(8), 1002–1018.

    Article  Google Scholar 

  • Basu, R. (2004). Six-sigma to operational excellence: Role of tools and techniques. International Journal of Six Sigma and Competitive Advantage, 1(1), 44–64.

    Google Scholar 

  • Beer, M., & Nohria, N. (2000). Cracking the code of change. Harvard Business Review, 1–8.

    Google Scholar 

  • Beer, M., Eisenstat, R. A., & Spector, B. (1990) Why change programs don’t produce change. Harvard Business Review, 1–13.

    Google Scholar 

  • Bevan, H., Westwood, N., Crowe, R., & O’Connor, M. (2006). Lean six sigma: Some basic concepts. NHS Institute for Innovation and Improvement 1–14.

    Google Scholar 

  • Bhuiyan, N., & Baghel, A. (2005). An overview of continuous improvement: From the past to the present. Management Decision, 43(5), 761–771.

    Article  Google Scholar 

  • Bititci, U. S., Mendibil, K., Nudurupati, S., Garengo, P., & Turner, T. (2006). Dynamics of performance measurement and organizational culture. International Journal of Operations and Production Management, 26(12), 1325–1350.

    Article  Google Scholar 

  • Bourne, M., Franco, M., & Wilkes, J. (2003). Corporate performance management. Measuring Business Excellence, 7(3), 15–21.

    Article  Google Scholar 

  • Buch, K. K., & Tolentino, A. (2006). Employee expectancies for six sigma success. Leadership and Organization Development Journal, 27(1), 28–37.

    Article  Google Scholar 

  • Business Balls. (2006). Free personal and organizational development website. Retrieved March 17, from http://www.businessballs.com (SWOT and PEST).

  • Carnegie Mellon Software Engineering Institute. (2002). Capability maturity model integration, March Edition. Retrieved March 18, 2009, from http://www.sei.cmu.edu/pub/documents/02.reports/pdf/02tr012.pdf.

  • Castle, J. A. (1996). An integrated model in quality management, positioning TQM, BPR and ISO 9000. The TQM Magazine, 8(5), 7–13.

    Article  Google Scholar 

  • Cheng, J.-L. (2008). Implementing Six Sigma via TQM improvement: An empirical study in Taiwan. The TQM Journal, 20(3), 182–195.

    Article  Google Scholar 

  • Claver, E., Gasco, J. L., Llopis, J., & Gonzalez, R. (2001). The strategic process of a cultural change to implement total quality management: A case study. Total Quality Management, 12(4), 469–482.

    Article  Google Scholar 

  • Coronado, R. B., & Antony, J. (2002). Critical success factors for the successful implementation of six sigma program in organizations. The TQM Magazine, 14(2), 92–99.

    Article  Google Scholar 

  • Crawford, R. (2004). Ammunition enterprise excellence ready for tomorrow? USA Armor School Research Library. Retrieved March 7, 2008, from http://www.dtic.mil/ndia/2004munitions/Crawford.pdf.

  • Dahlgaard, J. J., & Dahlgaard-Park, S. M. (2006). Lean production, six sigma, TQM and company culture. The TQM Magazine, 18(3), 263–281.

    Article  Google Scholar 

  • De Feo, J. A., & Janssen, A. (2002). The values of strategic deployment. Measuring Business Excellence, 6(1), 32–34.

    Article  Google Scholar 

  • Evans, J. R., & Lindsay, W. M. (2002). The management and control of quality. Cincinnati, OH: South-Western, a division of Thomson Learning.

    Google Scholar 

  • Foster, S. T. (2007). Managing quality: Integrating the supply chain. Upper Saddle River, New Jersey: Pearson Education-Prentice Hall.

    Google Scholar 

  • Friday-Stroud, S. S., & Sutterfield, J. S. (2007). A conceptual framework for integrating six-sigma and strategic management methodologies to quantify decision making. The TQM Magazine, 19(6), 561–571.

    Article  Google Scholar 

  • GE Capital Solutions. (2008). Retrieved December 15, from http://www.gecapsol.com.

  • Gels, D. A. (2005). Hoshin planning for project selection. In ASQ World Conference on Quality and Improvement Proceedings (Vol. 59, pp. 273–278) May.

    Google Scholar 

  • George, M. L. (2002). Lean six sigma, combining six sigma quality with lean speed. New York, NY: The McGraw-Hill Companies Inc.

    Google Scholar 

  • Goh, T. N., & Xie, M. (2004). Improving on the six sigma paradigm. The TQM Magazine, 16(4), 235–240.

    Article  Google Scholar 

  • Gunasekaran, A. (2006). Editorial: Productivity and quality in the 21st century. International Journal of Productivity and Quality Management, 1(1/2), 1–7.

    Google Scholar 

  • Haikonen, A., Savolainen, T., & Jarvinen, P. (2004). Exploring six sigma and CI capability development: Preliminary case study findings on management role. Journal of Manufacturing Technology Management, 15(4), 369–378.

    Article  Google Scholar 

  • Harnesk, R., & Abrahamsson, L. (2007). TQM: An act of balance between contradictions’. The TQM Magazine, 19(6), 531–540.

    Article  Google Scholar 

  • Harrington, H. J. (1995). The new model for improvement—Total improvement management. Business Process Re-engineering and Management Journal, 1(1), 31–41.

    Article  Google Scholar 

  • Herron, C., & Braiden, P. M. (2006). A methodology for developing sustainable quantifiable productivity improvement in manufacturing companies. International Journal of Production Economics, 104(1), 134–153.

    Article  Google Scholar 

  • Herron, C., & Hicks, C. (2008). The transfer of selected lean manufacturing techniques from Japanese automotive manufacturing into general manufacturing (UK) through change agents. Robotics and Computer-Integrated Manufacturing, 24, 524–531.

    Article  Google Scholar 

  • Hilb, M. (2006). New corporate governance. Berlin, Germany: Springer.

    Google Scholar 

  • Hoerl, R. (2004). One perspective on the future of six-sigma. International Journal of Six Sigma and Competitive Advantage, 1(1), 112–119.

    Article  MathSciNet  Google Scholar 

  • Ishikawa, K. (1984). Guide to quality control. Japan: Asian Productivity Organization.

    Google Scholar 

  • Johnson, D. M. (2004). Adaptation of organizational change models to the implementation of quality standard requirements. International Journal of Quality and Reliability Management, 21(2), 154–174.

    Article  MathSciNet  Google Scholar 

  • Kaplan, R. S., & Norton, D. P. (2001). The strategy focused organization. Boston, MA: Harvard Business School Press.

    Google Scholar 

  • Kaplan, R. S., & Norton, D. P. (2004). Strategy maps: Converting intangible assets into tangible outcomes. Boston, MA: Harvard Business School Press.

    Google Scholar 

  • Kaplan, R. S., & Norton, D. P. (2006). Alignment: Using the balanced scorecard to create corporate synergies. Boston, MA: Harvard Business School Publication Corp.

    Google Scholar 

  • Karia, N., & Asaari, M. H. A. H. (2006). The effects of total quality management practices on employees’ work-related attitudes. The TQM Magazine, 18(1), 30–43.

    Article  Google Scholar 

  • Kaye, M., & Anderson, R. (1999) Continuous improvement: The ten essential criteria. International Journal of Quality and Reliability Management, 16(5), 485–506.

    Google Scholar 

  • Kiemele, M. J. (2005) Critical success factors for deploying and implementing lean six sigma. USA Armor School Research Library, March. Retrieved March 4, 2008, from http://www.amc.army.mil/amc/pe/documents/sestrng/Kiemele.ppt.

  • Killen, C. P., Walker, M., & Hunt, R. A. (2005). Strategic planning using QFD. International Journal of Quality and Reliability Management, 22(1), 17–29.

    Google Scholar 

  • Kwak, Y. H. & Anbari, F. T. (2004). Benefits, obstacles and future of Six Sigma approach. Technovation, 26(5), 708-715.

    Google Scholar 

  • Linderman, K., Schroeder, R. G., & Choo, A. S. (2006). Six sigma: The role of goals in improvement teams. Journal of Operations Management, 24, 779–790.

    Article  Google Scholar 

  • Lucas, J. M. (2002). The essential six-sigma. Quality Progress, 27–31.

    Google Scholar 

  • Mader, D. P. (2007). How to identify and select lean six sigma projects. Quality Progress, 58–60.

    Google Scholar 

  • Martin, J. W. (2007). Lean six sigma for supply chain management, the 10-step solution process. New York, NY: The McGraw-Hill Companies Inc.

    Google Scholar 

  • Mellat-Parasat, M., & Digman, L. (2007). A framework for quality management practices in strategic alliances. Management Decision, 45(4), 802–818.

    Article  Google Scholar 

  • Moreno-Luzon, M. D., & Peris, F. J. (1998). Strategic approaches, organizational design and quality management: Integration in a fit and contingency model. International Journal of Quality Science, 3(4), 328–347.

    Article  Google Scholar 

  • Morrison, C. M., & Rahim, M. A. (1993). Adopt a new philosophy: The TQM challenge. The TQM Magazine, 4(2), 143–149.

    Google Scholar 

  • Motwani, J., Kumar, A., & Antony, J. (2004). A business process change framework for examining the implementation of six sigma: A case study of Dow chemicals. The TQM Magazine, 16(4), 273–283.

    Article  Google Scholar 

  • Newstrom, J. W., & Davis, K. (2002). Organizational behavior: Human behavior at work. Boston, MA: McGraw-Hill.

    Google Scholar 

  • Oakland, J. S., & Tanner, S. J. (2006). Quality management in the 21st century—Implementing successful change. International Journal of Productivity and Quality Management, 1(1/2), 69–87.

    Article  Google Scholar 

  • Pande, P. S., Neuman, R. P., & Cavanagh, R. R. (2000). The six sigma way: How GE, Motorola, and other top companies are honing their performance. New York, NY: McGraw-Hill.

    Google Scholar 

  • Pfeifer, T., Reissiger, W., & Canales, C. (2004). Integrating six sigma with quality management systems. The TQM Magazine, 16(4), 241–249.

    Article  Google Scholar 

  • Pheng, L. S., & Alfelor, W. M. (2000). Cross-cultural influences on quality management systems: Two case studies. Work Study, 49(4), 134–144.

    Article  Google Scholar 

  • Porter, M. E. (1979). How competitive forces shape strategy. Harvard Business Review, 57(2), 137–145.

    Google Scholar 

  • Pyzdek, T. (2004). Strategy deployment using balanced scorecards. International Journal of Six Sigma and Competitive Advantage, 1(1), 21–28.

    Article  Google Scholar 

  • Ricondo, I., & Viles, E. (2005). Six sigma and its links to TQM, BPR, lean and the learning organization. International Journal of Six Sigma and Competitive Advantage, 1(3), 323–354.

    Article  Google Scholar 

  • Savolainen, T., & Haikonen, A. (2007). Dynamics of organizational learning and continuous improvement in six sigma implementation. The TQM Magazine, 19(1), 6–17.

    Article  Google Scholar 

  • Schroeder, R. G., Linderman, K., Liedtke, C., & Choo, A. S. (2008). Six sigma: Definition and underlying theory. Journal of Operations Management, 26, 536–554.

    Article  Google Scholar 

  • Search Engine Marketing Operational Excellence. (2007). Retrieved November 16, from http://www.semoe.com/quality-glossary/.

  • Seen, M., Beaumont, N., & Mingins, C. (2001). Benchmarking business processes in software production: A case study. Benchmarking. An International Journal, 8(4), 262–280.

    Article  Google Scholar 

  • Sirkin, H. L., Keenan, P., & Jackson, A. (2005). The hard side of management. Harvard Business Review 1–12.

    Google Scholar 

  • Smith, B. (2003). Lean and six sigma-a one-two punch. Quality Progress, 36(4), 37–41.

    Google Scholar 

  • Snee, R. D. (2004). Six-Sigma: the evolution of a 100 years of business improvement methodology. International Journal of Six Sigma and Competitive Advantage, 1(1), 4–20.

    Google Scholar 

  • Snee, R. D. (2005). When worlds collide: Lean and six sigma. Quality Progress 63–65.

    Google Scholar 

  • Snee, R. D., & Hoerl, R. W. (2007). Integrating lean and six sigma—A holistic approach. Six Sigma Forum Magazine, 15–21.

    Google Scholar 

  • Snee, R. D., & Rodebaugh, W. F. (2002). The project selection process. Quality Progress, 35(9), 78–80.

    Google Scholar 

  • Soltani, E., & Lai, P.-C. (2007). Approaches to QM in the UK: Survey evidence and implications. Benchmarking: An International Journal, 14(4), 429–454.

    Article  Google Scholar 

  • Stadnicka, D., & Antosz, K. (2015). Continuous improvement practice in large enterprises: Study results. International Journal for Quality Research, 9(1), 9–26.

    Google Scholar 

  • Stankard, M. F. (2002). Management system and organization performance: The search for excellence beyond ISO 9000. West Port, CT: Greenwood Publishing Group Inc.

    Google Scholar 

  • Su, C.-T., & Chou, C.-J. (2008). A systematic methodology for the creation of six sigma projects: A case study of semiconductor foundry. Experts Systems with Applications, 34(4), 2693–2703.

    Article  Google Scholar 

  • Sun, H. (2000). Total quality management, ISO 9000 certification and performance improvement. International Journal of Quality and Reliability Management, 17(2), 168–179.

    Article  Google Scholar 

  • Townsend, P., & Gebhardt, J. (2008). Employee engagement—Completely. Human Resources Management International digest, 16(3), 22–24.

    Article  Google Scholar 

  • Ungan, M. (2006). Towards a better understanding of process documentation. The TQM Magazine, 18(4), 400–409.

    Article  Google Scholar 

  • Wallace, T. F., & Bennett, S. J. (1994). The instant access guide to: World class manufacturing. Essex Junction, VT: Oliver Wight Publications Inc.

    Google Scholar 

  • Walton, M. (1990). Deming management at work. New York, NY: G. P. Putnam’s Sons.

    Google Scholar 

  • Wessel, G., & Burcher, P. (2004). Six sigma for small and medium-size enterprises. The TQM Magazine, 16(4), 264–272.

    Article  Google Scholar 

  • Wilkinson, G., & Dale, B. G. (2001). Integrated management systems: A model based on total quality approach. Managing Service Quality, 11(5), 318–330.

    Article  Google Scholar 

  • Yang, C.-C. (2004). An integrated model of TQM and GE-Six sigma. International Journal of Six Sigma and Competitive Advantage, 1(1), 97–111.

    Article  MathSciNet  Google Scholar 

  • Yang, C.-C. (2006). The impact of human resource management practices on the implementation of total quality management—An empirical study on high-tech firms. The TQM Magazine, 18(2), 162–173.

    Article  Google Scholar 

  • Zeng, A. X., Lou, G. X., & Tam, V. W. Y. (2007). Managing information flows for quality improvement of projects. Measuring Business Excellence, 11(3), 30–40.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Souraj Salah .

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Switzerland AG

About this chapter

Check for updates. Verify currency and authenticity via CrossMark

Cite this chapter

Salah, S., Rahim, A. (2019). Integrated Company-Wide Management System (ICWMS). In: An Integrated Company-Wide Management System. Springer, Cham. https://doi.org/10.1007/978-3-319-99034-7_8

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-99034-7_8

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-99033-0

  • Online ISBN: 978-3-319-99034-7

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics