Advertisement

A Stakeholders Perspective on the Causes of Poor Service Delivery of Road Infrastructure

Conference paper
  • 1.5k Downloads
Part of the Advances in Intelligent Systems and Computing book series (AISC, volume 788)

Abstract

This study adopted a quantitative approach in order to investigate on a stakeholder’s perspective on the causes of poor service delivery of road infrastructure. Structured questionnaires were circulated to 75 stakeholders in construction industry in Gauteng Province, which were registered with various approved councils, construction professionals and contractors. 50 came back completed and eligible to use. Random sampling method was used to select the respondents in various organizations. Research findings revealed that community unrest and land proclamation were the highest ranked causes for poor service delivery. Followed by, time, financial constraints, cash flow, lack of proper planning, resources, delivery of material, plant and equipment, shortage of skilled labourers, lack of equipment, lack of materials, performance guarantees, project duration/period, cost overruns were the major causes of poor service delivery of roads infrastructure according to stakeholders perspective. Therefore, mitigating the causes would be by having proper management planning, skills transfer, education and training.

Keywords

Challenges Construction industry Road infrastructure Stakeholder 

References

  1. 1.
    Mahamid, I., Bruland, A., Dmaidi, N.: Causes of delay in road construction projects. J. Manag. Eng. ASCE 28, 300–310 (2012)CrossRefGoogle Scholar
  2. 2.
    Levinson, H.: Highways, people and places: past, present and future. ASCE Int. J. Civ. Environ. Eng. 130, 406–411 (2004)Google Scholar
  3. 3.
    Mofokeng, T.G.: Assessment of the causes of failure among small and medium sized construction companies in the Free State Province, pp. 1–268 (2012)Google Scholar
  4. 4.
    De Beer, M., Sallie, I.M., Van Rensburg, Y.: Revision of TRH 11 (1999–2000). Recovery of road damage – discussion document on a provisional basis for possible new estimation of mass fees – under review for TRH 11 (2000) – final summary report V1.0. Contract Report, p. 93 (2009)Google Scholar
  5. 5.
    Government Gazzete Regulation Gazette (2014). GDRT Road Network; 2015/2016 REF 111363, vol.584, no. 10113 (2014)Google Scholar
  6. 6.
    Bowen, P., Edwards, P., Cattell, K.: Corruption in the south african construction industry: a mixed methods study. In: 28th Annual ARCOM Conference, pp. 521–531 (2012)Google Scholar
  7. 7.
    Oyewobi, L., Windapo, A., Cattell, K.: Competitiveness of construction organizations in south africa. In: Construction Research Congress, pp. 2063–2073 (2014)Google Scholar
  8. 8.
    Assefa, F., Worke, Z.T., Mohammed, M.: Stakeholders impact analysis on road construction project management in Ethiopia: a case of western region. Int. J. Eng. Technical Research (2015)Google Scholar
  9. 9.
    Chinyio, E., Olomolaiye, P.: Construction Stakeholder Management. Wiley-Blackwell, Oxford (2010)Google Scholar
  10. 10.
    Gauteng Department of Roads and Transport, Road Asset Management System (RAMS), pp. 1–70 (2015)Google Scholar
  11. 11.
    TRH, 26: South African Road Classification and Access Management Manual (2012)Google Scholar
  12. 12.
    CIDB: Construction Industry Indicators Summary Results, pp. 1–13 (2008)Google Scholar
  13. 13.
    Edwards, P., Bowen, P., Hardcastle, C., Stwewart, P.: Identifying and communicating project stakeholders risks. Building a sustainable future. In: ASCE, pp. 776–785 (2009)Google Scholar
  14. 14.
    Inuwa, I., Wanyona, G., Diang, A.: Identifying building contractors’ project planning success indicators: The Case of Nigerian Indigenous Contractors. Applied Research Conference in Africa (ARCA), pp. 468–479 (2014)Google Scholar
  15. 15.
    Malongane, D.D.: Challenges facing emerging contractors in Gauteng, pp. 1–92 (2014)Google Scholar
  16. 16.
    Chan, W.M., Kumaraswamy, M.M.: Contributors to construction delays. J. Constr. Manag. Econo. 16, 17–29 (2007)Google Scholar
  17. 17.
    Assaf, S.A., Al-Heijjie, S.A.: Causes of Delays in large Construction Projects. UKUR BAHAM Quantity Surveying (2005)Google Scholar
  18. 18.
    Bob Muir, P.E.: Challenges facing today’s Construction Manager. Suppl. Reading for CIEG, pp. 486–010. Construction Methods & Management, pp. 1–9 (2005)Google Scholar
  19. 19.
    Kamanga, M.J, Jyd, W., Steyr, M.: Causes of delays in road construction projects. J. South African Inst. Civ. Eng. pp. 2309–8775 (2013)Google Scholar
  20. 20.
    Sunjka, B.P., Jacob, U.: Significant causes and effects of project delays in the Niger Delta Region, Nigeria, pp. 641-1–641-13 (2013)Google Scholar
  21. 21.
    Eke, C., Aigbavboa, C., Thwala, W.: An exploratory study of the causes of failure in construction industry, South Africa, pp. 1055–1062 (2015)Google Scholar
  22. 22.
    Ngosong, F., Tounga, T.: Investigation of problems or challenges faced by the procurement and delivery of quality construction projects in Africa and Cameroon, pp. 1–16 (2015)Google Scholar
  23. 23.
    Azhar, S.: Building Information Modelling (BIM): Trends, benefits, risks, and challenges for the AEC industry. Leadership and Management in Engineering, pp. 241–252 (2008)Google Scholar
  24. 24.
    Inuwa, I.I., Saiva, D., Alkizim, A.: Investigating Nigerian indigenous planning in construction procurement: an explanatory approach. Int. J. Civ. Environ. Eng. IJCEE-IJENS 14(04), 16–25 (2014)Google Scholar
  25. 25.
    Ogunde, A., Fagbenle, O.: Assessment of effectiveness of planning techniques and tools on construction projects in Lagos state, Nigeria. In: AEI, pp. 397–408 (2013)Google Scholar
  26. 26.
    Muszynaska, K.: Communication management in project teams –practices and patterns. In: Joint International Conference, pp. 1359–1566 (2015)Google Scholar

Copyright information

© Springer International Publishing AG, part of Springer Nature 2019

Authors and Affiliations

  1. 1.Department of Construction Management and Quantity SurveyingUniversity of JohannesburgJohannesburgSouth Africa

Personalised recommendations