Skip to main content

N222 Roundabout upon EPS Embankment with Integrated Corrugated Steel Tunnel Structure Without Pile Foundation

  • Conference paper
  • First Online:
5th International Conference on Geofoam Blocks in Construction Applications
  • 390 Accesses

Abstract

In April 2015 on a location with settlement sensible subsoil surrounded by greenhouses and water channels a large roundabout has been realized using 25,000 m3 EPS geofoam blocks. The roundabout is a part of the regional road N222 which connects Flora Holland (a huge marketplace for floriculture) with the nearest highways. The region is characterized by the largest greenhouse concentration in Europe. Due to its important economic function more than 11,000 vehicles pass the new roundabout over the lightweight embankments daily. During construction, unimpeded traffic passage had to be guaranteed. Bellow the roundabout a tunnel for the passage of bicycles was designed. Adjacent power line pylons made it impossible to place pile foundations as conventionally used in Dutch areas with peat subsoil. Consequently a structure using concrete tunnels was not an option. Therefore a 3.7 m high egg-form corrugated steel tunnel structure without pile foundations was integrated through the EPS embankment. The applied tunnel system with 7-mm-thick corrugated steel plates supports lightweight foamed concrete built in around. The tunnel structure is settlement free without pile foundations. Additional advantages include its lower building costs compared with conventionally designed tunnels made of concrete. Finally, the construction time was reduced thanks to this innovative design method. The paper deals with the design aspects related to the N222 roundabout structure with the lightweight embankments in general, and with the implemented tunnel solution in particular.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Milan Duškov .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer International Publishing AG, part of Springer Nature

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Duškov, M., Tameling, J. (2019). N222 Roundabout upon EPS Embankment with Integrated Corrugated Steel Tunnel Structure Without Pile Foundation. In: Arellano, D., Özer, A., Bartlett, S., Vaslestad, J. (eds) 5th International Conference on Geofoam Blocks in Construction Applications. Springer, Cham. https://doi.org/10.1007/978-3-319-78981-1_25

Download citation

Publish with us

Policies and ethics