The balanced lift method is a building bridge method that was developed at the TU Wien. The most common methods to build bridges are the ones using falsework or the cantilever method, but a rather uncommon method, the lowering of arches is seen as the origin of the balanced lift method. The idea was to create a method which would allow a bridge to be built in a very fast manner without the usage of falsework, using prefabricated elements and mounting all parts together in a position – in this case vertically – that would simplify the construction process. In order to reach the final state of the bridge, the vertically assembled parts are rotated into their final horizontal position. This article contains a description of the development of the method, a large scale test will be portrayed and an already designed bridges using the balanced lift method will be shown.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Berger J, Bruschetini-Ambro Z, Kollegger J (2011) An innovative design concept for improving the durability of concrete bridges. Struct. Concr. 12(3):155–163
Fédération international du béton (fib). Awards given out every 4 years to Outstanding Concrete Structures. 2014 fib Awards for Outstanding Concrete Structures – International Federation of Structural Concrete (2014)
Kollegger J, Gmainer S, Lehner K, Simader J (2012) Ultimate strength of curved tendons. Struct. Concr. 13(1):42–55
Kollegger J, Foremniak S, Suza D, Wimmer D, Gmainer S (2014) Building bridges using the balanced lift method. Struct. Concr. 15(3):281–291
Troyano LF (2003) Bridge Engineering – A Global Perspective. Telford, Madrid
Acknowledgements
The financial support of the large scale test by Österreichische Forschungsförderungsgesellschaft (FFG), ASFINAG, ÖBB Infrastruktur AG and Vereinigung Österreichischer Beton- und Fertigteilwerke (VÖB) is gratefully acknowledged. The good cooperation with Schimetta Consult GmbH during the detailed design of the bridges for the S7 motorway, and with Franz Oberndorfer GmbH & Co. KG during the construction of the large scale test structure in Gars am Kamp, is also gratefully acknowledged.
The authors are also thankful to Wilhelm Ernst & Sohn Verlag GmbH & Co. KG for the permission to use material in this paper, which was previously published in the journal “Structural Concrete” (Kollegger et al. 2014).
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2018 Springer International Publishing AG, part of Springer Nature
About this paper
Cite this paper
Kollegger, J., Reichenbach, S. (2018). Balanced Lift Method – Building Bridges Without Formwork. In: di Prisco, M., Menegotto, M. (eds) Proceedings of Italian Concrete Days 2016. ICD 2016. Lecture Notes in Civil Engineering , vol 10. Springer, Cham. https://doi.org/10.1007/978-3-319-78936-1_15
Download citation
DOI: https://doi.org/10.1007/978-3-319-78936-1_15
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-78935-4
Online ISBN: 978-3-319-78936-1
eBook Packages: EngineeringEngineering (R0)