Probabilistic Scheduling

  • Chapter
  • First Online:
Project Management for Facility Constructions

Abstract

Formal probabilistic approaches are available to project managers to include foreseeable uncertainty and risk into their schedules. The formal probabilistic scheduling methods discussed in this chapter are Program Evaluation Review Technique (PERT), Monte Carlo Simulation and Graphical Evaluation Review Technique (GERT).

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

eBook
USD 16.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 99.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References and Additional Resources

  • Goldratt EM (1997) Critical chain. North River Press, Great Barrington, MA

    Google Scholar 

  • Hendrickson C (2008) Project management for construction, 2nd Edition. Carnegie Mellon University, Pittsburgh, PA. http://pmbook.ce.cmu.edu/11_advanced_scheduling_techniques.html

  • Moder JJ, Phillips CR, Davis EW (1983) Project management with CPM, PERT, and precedence diagramming. Van Nostrand Reinhold, New York

    Google Scholar 

  • Pena-Mora F, Li M (2001) Dynamic planning and control methodology for design/build fast-track construction projects. J Constr Eng Manag 127(1):1–17

    Article  Google Scholar 

  • Pritsker AAB, Sigal CE (1983) Management decision making a network simulation approach. Prentice-Hall, Englewood Cliffs, NJ

    Google Scholar 

  • Schtub A, Bard J, Globerson S (1994) Project management: engineering technology, and implementation. Prentice Hall

    Google Scholar 

  • Taylor BW, Moore LJ (1980) R&D project planning with Q-GERT network modeling and simulation. Manage Sci 26(1):44–59

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Alberto De Marco .

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Springer International Publishing AG, part of Springer Nature

About this chapter

Check for updates. Verify currency and authenticity via CrossMark

Cite this chapter

De Marco, A. (2018). Probabilistic Scheduling. In: Project Management for Facility Constructions. Springer, Cham. https://doi.org/10.1007/978-3-319-75432-1_12

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-75432-1_12

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-75431-4

  • Online ISBN: 978-3-319-75432-1

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics