Skip to main content

Tunnel Boring Machine Advance Ground Investigation in Rockburst-Prone Ground Conditions on Neelum Jhelum Project

  • Conference paper
  • First Online:
Engineering Challenges for Sustainable Underground Use (GeoMEast 2017)

Abstract

This paper details the methods by which various advance ground investigation methodologies were deployed on two Tunnel Boring Machines (TBMs) working on the Neelum Jhelum Hydro-power project. The project is located in the Azad Kashmir region of northeast Pakistan, in the foothills of the Himalayan range, with overburdens up to 1,870 m and high horizontal stresses, and with complex and challenging geology. The lack of previous project experience in similar conditions, required the use of a wide variety of geological prediction methods and systems. The geological phenomenon of greatest concern was rockbursts: although expected they nevertheless presented a significant danger to personnel and equipment. The ability to predict the likelihood, location, severity and number of rockburst directly impacts upon the tunnel safety and daily production rates. The advanced prediction methods used on this project include forward probing; Tunnel Seismic Tomography (TST), TBM boring parameter analysis, in-situ stress measurements, short term rockburst prediction and continuous microseismic monitoring. This paper describes the various methodologies and how the individual data was integrated on a day-to-day basis to support TBM operations.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • World Stress Map Project. http://www.world-stress-map.org

  • Feng, G., Feng, X., Chen, B., et al.: A microseismic method for dynamic warning of rockburst development processes in tunnels. Rock Mech. Rock Eng. 48, 2061 (2015)

    Article  Google Scholar 

  • Feng, X., Yashunb, X., Feng, G.: Mechanism, warning and dynamic control of rockburst evolution process. In: ARMS7 – 7th Asian Rock Mechanics Symposium (2012)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Springer International Publishing AG

About this paper

Cite this paper

Ullah, I., Peach, G., Nadeem, M. (2018). Tunnel Boring Machine Advance Ground Investigation in Rockburst-Prone Ground Conditions on Neelum Jhelum Project. In: Agaiby, S., Grasso, P. (eds) Engineering Challenges for Sustainable Underground Use. GeoMEast 2017. Sustainable Civil Infrastructures. Springer, Cham. https://doi.org/10.1007/978-3-319-61636-0_5

Download citation

Publish with us

Policies and ethics