The ongoing construction and further operation of the Rogun HPP in one of the most seismically active regions of Central Asia can cause activation of dangerous processes along the slopes adjacent to the dam and reservoir. Among the gravitational mass displacements recorded near the major hydroelectric facilities, the old right-bank landslide located downstream the hydrosystem is worth of special consideration. Possible landslide activation triggered by earthquakes and/or flooding may cause collapse of unstable masses with adverse consequences for the major HPP facilities. The complex geological and tectonic conditions of the construction area, the great height of the earth-fill Rogun dam, as well as large-scale man-made impacts on the slopes surrounding major HPP facilities, including the filling of the reservoir, require a profound analysis of slope stability downstream from the dam with assessment of possible landslide risk scenarios. This report describes the main results of the comprehensive studies, calculations and dynamic modeling of stability of the right-bank landslide-prone slope, which suggest that the potentially unstable mass of strongly weathered rocks with the volume from 2 to 5 × 106  m3 on a steep part of the slope may fully or partially collapse in case of combination of strong seismic action (PGA > 0.3 g) and of precipitation. In case of synchronous collapse of about five-million m3 of unstable rocks, the blockage of the Vakhsh River by a landslide dam is inevitable, with risk of flooding of the tunnels and consequential disturbance of normal functioning of the HPP.

Keywords

Rogun HPP Landslide dam formation Seismic activity Scenario modelling Tajikistan 

Notes

Acknowledgements

The work completed in connection with the presented research results was supported by the Rogun HPP project Contract No. 2015-5/2-OP.

References

  1. Havenith HB, Abdrakhmatov K, Torgoev I, Ischuk A, Strom A, Bystrický E, Cipciar A (2013) Earthquakes, landslides, dams and reservoirs in the Tien Shan, Central Asia. In: Margottini C, Canuti P, Sassa K (eds) Landslide science and practice, vol 6. Springer, Berlin, pp 27–31Google Scholar
  2. Havenith HB, Mreyen AS, Torgoev A, Micu M (2017) Numerical models of unstable slopes in seismic areas—enhanced by 3D stereo visualization. In: WLF4 2017, 4th World Landslide Forum, p 8Google Scholar
  3. Ischuk AR, Ilyasova ZG (2012) Seismic hazard estimation of the hydroelectric power plants on the Vakhsh River, Tajikistan. In: Book of abstracts. The 33rd general assembly of the European Seismological Commission (GA ESC 2012), Moscow, 19–24 Aug 2012, pp 419–420Google Scholar
  4. Techno-economic assessment study (teas) for rogun hydroelectric construction project/geological investigations in the right bank, RP 29 (2013)Google Scholar
  5. Torgoev I, Niyazov R, Havenith H-B (2011) Tien-Shan landslides triggered by earthquakes in Pamir-Hindukush zone. In: Word landslide forum proceedings, vol 5, pp 191–197Google Scholar
  6. Wathelet M (2005) GEOPSY geophysical signal database for noise array processing. Software, LGIT, Grenoble, Fr. http://www.geopsy.org

Copyright information

© Springer International Publishing AG 2017

Authors and Affiliations

  • Torgoev Isakbek
    • 1
    Email author
  • Havenith Hans-Balder
    • 2
  • Torgoev Almaz
    • 2
  • Cerfontaine Philippe
    • 2
  • Ischuk Anatoly
    • 3
  1. 1.Institute of Geomechanics and Mining of the Academy of SciencesBishkekKyrgyz Republic
  2. 2.Geology DepartmentUniversity of LiegeLiegeBelgium
  3. 3.Institute of GeologySeismology and Earthquake Engineering of the Academy of Sciences of the Republic of TajikistanDushanbeTajikistan

Personalised recommendations