Abstract
The British railway is one of the most complex mixed traffic railway systems in the world. Increasing passenger/freight traffic is placing significant demand on the railway system calling for improvements to the existing network capacity and service reliability. Through systematic data analysis and modelling, the industry has gained a better understanding and insight into the system behaviour. This has highlighted the necessity for higher precision measurements of the railway system to enable an effective optimisation of capacity utilisation and reliability of service performance. This chapter describes two main root causes affecting the service performance and the measurement systems used to quantify their impact. The current performance modelling techniques based on infrastructure-borne and train-borne measurement systems and their pros and cons will be discussed. Finally, opportunities will be presented to improve the performance monitoring and measurement systems by using the various data layers available to the industry in a better managed way.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Network Rail (2015) Our history—network rail. http://www.networkrail.co.uk/aspx/729.aspx
Department for Transport (2007) Delivering a sustainable railway—white paper. Department for Transport. https://www.gov.uk/government/publications/delivering-a-sustainable-railway
RSSB (2014) Reliability modelling of the Brighton mainline (T1019)” http://www.rssb.co.uk/pages/research-catalogue/t1019.aspx
Network Rail (2012) CP5 strategic business plan supporting document. http://www.networkrail.co.uk/browse%20documents/strategicbusinessplan/cp5/supporting%20documents/outputs/performance%20plan%20for%20cp5.pdf?cd=2
RSSB (2012) Making the case for a whole system strategic approach to reliability improvement: modelling reliability study (T935 Report). http://www.sparkrail.org/Lists/Records/DispForm.aspx?ID=1507
Open Train Times (2015). http://www.opentraintimes.com/maps/signalling/lec1
RSSB (2014) Railway Group Standard GM/RT 2472. Requirements for data recorders on trains. RSSB, London, UK
Leeming D (2013) Right time performance measure. Ove Arup & Partners Ltd, London, UK
Haskins C (ed) (2007) Systems engineering handbook: a guide for system life cycle processes and activities. Version 3.1. Accessed by Forsberg K, Krueger, M. INCOSE, San Diego, CA, USA
Haskins C (ed) (2010) Systems engineering handbook: a guide for system life cycle processes and activities. Version 3.2. Accessed by Krueger M, Walden D, Hamelin RD. INCOSE, San Diego, CA, USA
Mankins JC (1995) Technology readiness levels. White paper, NASA Office of Space Access and Technology. http://www.hq.nasa.gov/office/codeq/trl/trl.pdf
Pollan M (2006) The Omnivore’s Dilemma: a natural history of four meals. Penguin, New York, NY, USA
Sheard SA (2006) Definition of the Sciences of Complex Systems. INSIGHT 9(1):25
US Department of Defense (2003) Department of defense directive 5000.1. The defense acquisition system. Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics, Washington, DC, USA
Deming, W. E. (1982) Out of the Crisis: Quality, Productivity and Competitive Position ISBN 0-521-30553-5
Shewhart WA (1931) Economic control of quality of manufactured product. D. Van Nostrand Company, Inc., New York City, p 7. OCLC 1045408
Thomson J (2012) Common-mode failure considerations in high-integrity C&I systems (PDF). Safety Eng
Calvano CN, John P (2004) Systems engineering in an age of complexity. www.calhoun.nps.edu
RSSB (2014) Reliability modelling of the brighton mainline (T1019). http://www.rssb.co.uk/pages/research-catalogue/t1019.aspx
RSSB (2016, expected published date) Brighton mainline timetable optimisation study (T1063). http://www.rssb.co.uk/pages/research-catalogue/t1063.aspx
Network Rail (2015) Our plan for rail in Britain—network rail. http://www.networkrail.co.uk/improvements/indexpage.aspx
Network Rail (2015) Performance—network rail. http://www.networkrail.co.uk/about/performance/
Deming WE (1982) Out of the crisis: quality, productivity and competitive position. ISBN: 0-521-30553-5
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2017 Springer International Publishing AG
About this chapter
Cite this chapter
Toossi, A., Barson, L., Hyland, B., Fung, W., Best, N. (2017). Infrastructure/Train Borne Measurements in Support of UK Railway System Performance—Gaining Insight Through Systematic Analysis and Modelling. In: Redding, L., Roy, R., Shaw, A. (eds) Advances in Through-life Engineering Services. Decision Engineering. Springer, Cham. https://doi.org/10.1007/978-3-319-49938-3_14
Download citation
DOI: https://doi.org/10.1007/978-3-319-49938-3_14
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-49937-6
Online ISBN: 978-3-319-49938-3
eBook Packages: EngineeringEngineering (R0)