Skip to main content

Risk Linked Reliability-Centred Maintenance Management Model

  • Chapter
  • First Online:
Risk-Based Maintenance for Electricity Network Organizations

Abstract

In Sect. 4.2, RCM is briefly introduced, and the steps followed within a RCM approach are described. Although abundant literature has been published on RCM, a brief introduction is given to facilitate the discussion during the remainder of this book. Aspects related to RCM such as Failure Mode and Effect Analysis (FMEA) and the calculation of a Risk Priority Number (RPN) are described. Section 4.3 continues with considering risk management as a decision-making method within asset management and explaining the link between RCM and risk management. In Sect. 4.4, risk linked RCM methodology is developed, where failure modes are linked to business values through the use of risk factors. Section 4.5 applies this model to a case study of a Dutch electricity network operator for a power transformer and subsequently to manager a larger fleet of power transformers. This chapter comes close in Sect. 4.6 by drawing a number of concluding remarks and explaining the way forward for the remainder of this book.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 89.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 119.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 119.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • CIGRE WG A2.27. (2008). Technical brochure 343—recommendations for condition monitoring and condition assessment facilities for transformers. Paris, France: CIGRE.

    Google Scholar 

  • CIGRE WG A2.34. (2011). Technical brochure 445—guide for transformer maintenance. Paris, France: CIGRE.

    Google Scholar 

  • EPRI. (2002). Power transformer maintenance and application guide. Palo Alto, CA: Electric Power Research Institute Inc.

    Google Scholar 

  • Jay, P., & Wilson, A. (2007). Risk based expenditure planning—Myth or reality. Prague, sn.

    Google Scholar 

  • Krishnasamy, L., Khan, F., & Haddara, M. (2005). Development of a risk-based maintenance (RBM) strategy for a power-generating plant. Journal of Loss Prevention in the Process Industries, 2(18), 69–81.

    Article  Google Scholar 

  • Mehairjan, R. P. Y., van Hattem, M., Djairam, D., & Smit, J. J. (2015). Development and implementation of a maturity model for professionalising maintenance management. Berlin: Springer Verlag, sn.

    Google Scholar 

  • Mehairjan, R. P. Y., van Hattem, M., Djairam, D., & Smit, J. J. (2015). Risk-based approach to maintenance management applied on power transformers. In: Proceedings of 2014 world congress on engineering asset management. London, UK: Springer International Publishing, pp. 415–434.

    Google Scholar 

  • Moubray, J. (1997). Reliability-centered maintance 2. The Netherlands: Elsevier Ltd.

    Google Scholar 

  • Nowland, F. S., & Heap, H. F. (1987). Reliability Centered Maintenance. sl: US Department of Commerce.

    Google Scholar 

  • Reliasoft. (1998). Weibull ++Handbook. Tucson, USA: Reliasoft Publishing.

    Google Scholar 

  • Smith, A. M. (1992). Reliability-centered maintenance. sl: McGraw-Hill.

    Google Scholar 

  • Wilson, A. (1999). Asset maintenance management: A guide to developing strategy and improving performance. New York: Industrial Press Inc..

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Ravish Preshant Yashraj Mehairjan .

Rights and permissions

Reprints and permissions

Copyright information

© 2017 Springer International Publishing AG

About this chapter

Cite this chapter

Mehairjan, R.P.Y. (2017). Risk Linked Reliability-Centred Maintenance Management Model. In: Risk-Based Maintenance for Electricity Network Organizations. Springer, Cham. https://doi.org/10.1007/978-3-319-49235-3_4

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-49235-3_4

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-49234-6

  • Online ISBN: 978-3-319-49235-3

  • eBook Packages: EnergyEnergy (R0)

Publish with us

Policies and ethics