Abstract
The paper presents the concept of multistage sequencing system which main task is to aid the processes of production scheduling in modern assembly systems, mainly in automotive industry, but also in other industry branches, where mixed-model production is conducted. Because of NP-hard character of considered scheduling tasks, it is a potential application area of soft computing graph searching techniques. Described sequencing system is a tool for production scheduling optimizing the process in terms defined by the user (e.g. the number of cycle times exceeded on the assembly line stations as well as the average exceeding of the cycle time). The system structure is based on graph searching techniques, and may be implemented in many problems solving methods, including not only production scheduling but also others, e.g. project scheduling. The developed system model is the basis of its implementation in production planning software, creating the sequences of production orders in few different stages.
References
Seyedi Seyed, N.: Supply chain management, lean manufacturing, agile production, and their combination. Interdisc. J. Contemp. Res. Bus. 4(8), 648–653 (2012)
Vinodh, S., Aravindraj, S.: Evaluation of leagility in supply chains using fuzzy logic approach. Int. J. Prod. Res. 51(4), 1186–1195 (2013)
Banaszak, Z., Skołud, B., Zaremba, M.B.: Computer-aided prototyping of production flows for a virtual enterprise. J. Intell. Manuf. 14, 83–106 (2003)
Rudnicki, J.: Przedsiębiorstwo agile, Logistyka Produkcji (2011). http://www.log24.pl/artykuly/przedsiebiorstwo-agile,1464
Masahiko, O., Iwata, K.: Development of a virtual manufacturing system by integrating product models and factory models. Ann. CIRP 42(1), 475–478 (1993)
Kalinowski, K., Paprocka, I.: Scheduling Schemes Based on Searching the Aggregated Graph of Operations Planning Sequence. Applied Mechanics and Materials, vol. 809/810, pp. 1462–1467. Trans Tech Publications, Zurich (2015)
Kalinowski, K., Zemczak, M.: Preparatory stages of the production scheduling of complex and multivariant products structures. In: Herrero, Á., Sedano, J., Baruque, B., Quintián, H., Corchado, E. (eds.) 10th International Conference on Soft Computing Models in Industrial and Environmental Applications. Advances in Intelligent Systems and Computing, vol. 368, pp. 475–483. Springer International Publishing, Switzerland (2015)
Allahverdi, A., Al-Anzi, F.S.: A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application. Comput. Oper. Res. 33, 1056–1080 (2006)
Skolud, B., Krenczyk, D., Zemczak, M.: Multi-assortment rhythmic production planning and control. In: Book Series: IOP Conference Series - Materials Science and Engineering, vol. 95, Article Number: 012133 (2015)
Krenczyk, D., Skolud, B.: Transient states of cyclic production planning and control. Appl. Mech. Mater. 657, 961–965 (2014)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2017 Springer International Publishing AG
About this paper
Cite this paper
Zemczak, M., Skołud, B. (2017). Multistage Sequencing System for Complex Mixed-Model Assembly Problems. In: Graña, M., López-Guede, J.M., Etxaniz, O., Herrero, Á., Quintián, H., Corchado, E. (eds) International Joint Conference SOCO’16-CISIS’16-ICEUTE’16. SOCO CISIS ICEUTE 2016 2016 2016. Advances in Intelligent Systems and Computing, vol 527. Springer, Cham. https://doi.org/10.1007/978-3-319-47364-2_40
Download citation
DOI: https://doi.org/10.1007/978-3-319-47364-2_40
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-47363-5
Online ISBN: 978-3-319-47364-2
eBook Packages: EngineeringEngineering (R0)