Concurrency in BIM-Based Project Implementation: An Exploratory Study of Chongqing Jiangbei International Airport’s Terminal 3A

  • Conference paper
  • First Online:
Cooperative Design, Visualization, and Engineering (CDVE 2016)

Part of the book series: Lecture Notes in Computer Science ((LNISA,volume 9929))

  • 1522 Accesses

Abstract

Many of the shortcomings associated with dated design and construction methods as well as project fast-tracking can be addressed by exploring the concept of concurrency facilitated by Building Information Modelling (BIM). From a BIM perspective, concurrency facilitates the involvement of stakeholders from very early on during the lifecycle of a project. Leveraging the 5 W/H (Who, What, When/Where, Why and How) method of exploratory research, this paper explores how BIM and Concurrent Engineering (CE) at Terminal 3A of the Chongqing Jiangbei International Airport compares with a historical exemplar of BIM deployment in the AEC industry. Based on existing definitions of CE, we compare both projects to determine their conformance to three CE criteria: 1) compressed project duration, 2) enhanced product value, and 3) reduced project costs. We also review their use of collaborative tools and techniques. The paper shows how the success of BIM-based projects can be rationalised by CE.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Notes

  1. 1.

    The IIF framework is useful for gaining a general understanding of information dynamics from a very basic investigative perspective. This approach is widely known as the 5W1H method.

  2. 2.

    The TOPP framework captures BIM content in three key dimensions depicting unique perspectives for uniformly evaluating BIM-based case-study projects.

References

  1. Latham, M.: Constructing the team: final report of The Government/Industry review of procurement and contractual arrangements in the United Kingdom construction industry. In: The Stationery Office. Department of Environment, London (1994)

    Google Scholar 

  2. Egan, J.: Rethinking construction: the report of the construction task force. Department of the Environment, Transport and the Regions, London (1998)

    Google Scholar 

  3. Alarcon, L.: Lean Construction. A.A. Balkema, Rotterdam (1997)

    Google Scholar 

  4. Love, P.E.D., Gunasekaran, A., Li, H.: Concurrent engineering: a strategy for procuring construction projects. Int. J. Project Manage. 16(6), 375–383 (1998)

    Article  Google Scholar 

  5. Castagna, J.: Benefits of BIM. Environ. Des. Constr. 11(11), 140–143 (2008)

    Google Scholar 

  6. Costin, A., Pradhananga, N., Teizer, J., Marks, E.: Real-time resource location tracking in building information models (BIM). In: Luo, Y. (ed.) CDVE 2012. LNCS, vol. 7467, pp. 41–48. Springer, Heidelberg (2012)

    Chapter  Google Scholar 

  7. Wang, Y., et al.: Engagement of facilities management in design stage through BIM: framework and a case study. Adv. Civ. Eng. (2013)

    Google Scholar 

  8. Ren, Y., Skibniewski, M.J., Jiang, S.: Building information modeling integrated with electronic commerce material procurement and supplier performance management system. J. Civ. Eng. Manage. 18(5), 642–654 (2012)

    Article  Google Scholar 

  9. Brandon, P.S., Betts, M.: Integrated Construction Information. Taylor & Francis Group, Boca Raton (1995)

    Google Scholar 

  10. Staub‐French, S., et al.: Building Information Modeling (BIM) ‘Best Practices’ Project Report. University of British Colombia, École de Technologie Supérieure (2011)

    Google Scholar 

  11. Lichtig, W.: Integrated Form of Agreement (IFoA) (2009) (cited 18 May 2015). http://www.thechangebusiness.co.uk/TCB/ifoa.html

  12. Wilson, C. Sutter Medical Center, Castro Valley: IPD Process Innovation with Building Information Modelling (2011) (cited 08 May 2015). http://network.aia.org/HigherLogic/System/DownloadDocumentFile.ashx?DocumentFileKey=69f83720-c575-4029-aea4-418236ec4771

Download references

Acknowledgement

The authors wish to thank China Construction Eighth Engineering Division. Corp.Ltd for providing the case study of the CJI Airport Project.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Lei Hou .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2016 Springer International Publishing AG

About this paper

Cite this paper

Utiome, E., Mohamed, S., Panuwatwanich, K., Lin, E., Hou, L. (2016). Concurrency in BIM-Based Project Implementation: An Exploratory Study of Chongqing Jiangbei International Airport’s Terminal 3A. In: Luo, Y. (eds) Cooperative Design, Visualization, and Engineering. CDVE 2016. Lecture Notes in Computer Science(), vol 9929. Springer, Cham. https://doi.org/10.1007/978-3-319-46771-9_33

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-46771-9_33

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-46770-2

  • Online ISBN: 978-3-319-46771-9

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics