Skip to main content

Part of the book series: Advances in Intelligent Systems and Computing ((AISC,volume 524))

Abstract

Searching for an algorithm which achieves good quality basic schedules, in predefined time, two immune algorithms are compared, Multi Objective Immune Algorithm (MOIA), Clonal Selection Algorithm (CSA). In the MOIA two stages are distinguished, the first stage mimics the exogenous activation and the second corresponds to the endogenous activation of an immune system. The architecture of CSIA mimics the clonal proliferation and maturation processes. The two algorithms are applied for a multi criteria job shop scheduling problem. Basic schedules are modified using the rule of Minimal Impact of Disturbed Operation on the Schedule (MIDOS) in order to generate predictive schedules. The influence of rescheduling policies over the performance of a job shop system is investigated using the rule of Minimal Impact of Rescheduled Operation on the Schedule (MIROS). In the paper, the influence of the quality basic schedules over the obtainment of stable and robust schedules with the application of the MIDOS and MIROS is investigated.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Paprocka, I., Kempa, W. M., Kalinowski, K., Grabowik, C.: Estimation of overall equipment effectiveness using simulation programme. Mater. Sci. Eng. 95, Article Number: 012155, 1–6 (2015)

    Google Scholar 

  2. Ershun, P., Wenzhu, L., Lifeng, X.: A joint model of production scheduling and predictive maintenance for minimizing job tardiness. Int. J. Adv. Manuf. Technol. 60, 1049–1061 (2012)

    Article  Google Scholar 

  3. Vieira, E.G., Herrmann, J.W., Lin, E.: Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J. Sched. 6(1), 35–58 (2003)

    Article  MathSciNet  MATH  Google Scholar 

  4. Wu, S.D., Storer, R.H., Chang, P.-C.: One-machine rescheduling heuristics with efficiency and stability as criteria. Comput. Oper. Res. 20, 1–14 (1993)

    Article  MATH  Google Scholar 

  5. Fahmy, S.A., Balakrishnan, S., ElMekkawy, T.Y.: A generic deadlock-free reactive scheduling approach. Int. J. Prod. Res. 47(20), 5657–5676 (2009)

    Article  MATH  Google Scholar 

  6. Paprocka, I., Kempa, W.M., Grabowik, C., Kalinowski, K.: Sensitivity analysis of predictive scheduling algorithms. Adv. Mater. Res. 1036, 921–926 (2014)

    Article  Google Scholar 

  7. Leon, V.J., Wu, S.D., Storer, R.H.: Robustness measures and robust scheduling for job shops. IIE Trans. 26, 32–43 (1994)

    Article  Google Scholar 

  8. Policella, N., Oddi, A., Smith, S.F., Cesta, S.: Generating robust partial order schedules. In: Wallace, M. (ed.). Lecture Notes in Computer Science, vol. 3258, pp. 496–511 (2004)

    Google Scholar 

  9. Paprocka, I., Kempa, W.M., Kalinowski, K., Grabowik, C.: A production scheduling model with maintenance. Adv. Mater. Res. 1036, 885–890 (2014)

    Article  Google Scholar 

  10. Paprocka, I., Kempa, W.M., Kalinowski, K., Grabowik, C.: On pareto optimal solution for production and maintenance jobs scheduling problem in a job shop and flow shop with an immune algorithm. Adv. Mater. Res. 1036, 875–880 (2014)

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Iwona Paprocka .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2017 Springer International Publishing AG

About this paper

Cite this paper

Paprocka, I. (2017). On the Quality of Basic Schedules Influencing over the Performance of Predictive and Reactive Schedules. In: Wilimowska, Z., Borzemski, L., Grzech, A., Świątek, J. (eds) Information Systems Architecture and Technology: Proceedings of 37th International Conference on Information Systems Architecture and Technology – ISAT 2016 – Part IV. Advances in Intelligent Systems and Computing, vol 524. Springer, Cham. https://doi.org/10.1007/978-3-319-46592-0_21

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-46592-0_21

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-46591-3

  • Online ISBN: 978-3-319-46592-0

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics