Advertisement

Is the Lean Organisation a Complex System?

  • Pierre MasaiEmail author
  • Pierre Parrend
  • Nicolas Toussaint
  • Pierre Collet
Conference paper
  • 410 Downloads
Part of the Springer Proceedings in Complexity book series (SPCOM)

Abstract

The Lean Organisation enjoys a tremendous success. It was first developed within Toyota Motor Corporation in the Automotive Industry, but was then adopted by many organisations in all fields of human activities. A deeper observation of this success displays behaviours of complex systems: a high number of agents interact with each other, using basic routines for which they have been coached systematically, creating a much better result than each individual could have reached by themselves (emerging behaviour). We model two significant processes of Lean: Hoshin Kanri (for management of the organisation objectives) and Nemawashi (consensus building). The simulations performed based on these models show qualitative as well as quantitative evidence for emerging behaviours of the Lean organisation. They also allow to demonstrate the existence of several success factors for the Lean organisation: proficiency of the agents, readiness of the management to accept emergent proposals, and strong requirement for rigour in the execution of the decision process.

Keywords

Success Factor Complex Adaptive System Consensus Building Critical Success Factor Skilled Employee 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

References

  1. 1.
    Beer M, Voelpel SC, Leibold M, Tekie EB (2005) Strategic management as organizational learning: developing fit and alignment through a disciplined process. Long Range Plan 38(5):445–465CrossRefGoogle Scholar
  2. 2.
    Bell SC (2012) Run grow transform: integrating business and lean IT. CRC Press, Boca RatonCrossRefGoogle Scholar
  3. 3.
    Byrne A, Womack JP (2012) The lean turnaround: how business leaders use lean principles to create value and transform their company. BusinessPro collection. McGraw-Hill EducationGoogle Scholar
  4. 4.
    Cassell C, Worley JM, Doolen TL (2006) The role of communication and management support in a lean manufacturing implementation. Manag Decis 44(2):228–245CrossRefGoogle Scholar
  5. 5.
    Collet P (2014) Mooc ose (optimisation stochastique evolutionnaire), Sept 2014Google Scholar
  6. 6.
    Csáji BC, Monostori L (2008) A complexity model for networks of collaborating enterprises. In: Proceedings of the 17th world congress of IFAC (International Federation of Automatic Control), COEX, SeoulGoogle Scholar
  7. 7.
    Größler A, Stotz M, Schieritz N (2003) A software interface between system dynamics and agent-based simulations: linking vensim®; and repast®;. In: Proceedings of the 21st system dynamics society international conference, CiteseerGoogle Scholar
  8. 8.
    Holland JH (2014) Complexity: a very short introduction. Very short introductions. Oxford University Press, OxfordzbMATHGoogle Scholar
  9. 9.
    Joshi MP, Kathuria R, Porth SJ (2003) Alignment of strategic priorities and performance: an integration of operations and strategic management perspectives. J Oper Manag 21(3):353–369CrossRefGoogle Scholar
  10. 10.
    Koller D, Friedman N (2009) Probabilistic graphical models: principles and techniques. MIT Press, CambridgezbMATHGoogle Scholar
  11. 11.
    Liu Z, Li H.-X. (2005) A probabilistic fuzzy logic system for modeling and control. IEEE Trans Fuzzy Syst 13(6):848–859CrossRefGoogle Scholar
  12. 12.
    Masai P, Parrend P, Zanni-Merk C (2015) Towards a formal model of the lean enterprise. Procedia Comput Sci 60:226–235CrossRefGoogle Scholar
  13. 13.
    Messaoudene Z, Gramdi J (2007) Proposition d’un cadre conceptuel et systémique des systèmes de production lean. In: 7è Congrès international de Génie Industriel, Trois Rivières, QuébecGoogle Scholar
  14. 14.
    Miller JH, Page SE (2007) Complex adaptive systems: an introduction to computational models of social life. Princeton studies in complexity. Princeton University Press, PrincetonzbMATHGoogle Scholar
  15. 15.
    Mitleton-Kelly E (2003) Complex systems and evolutionary perspectives on organisations: the application of complexity theory to organisations. Elsevier Science Ltd, AmsterdamGoogle Scholar
  16. 16.
    Ries E (2011) The lean startup: how today’s entrepreneurs use continuous innovation to create radically successful businesses. The lean startup: how today’s entrepreneurs use continuous innovation to create radically successful businesses. Crown BusinessGoogle Scholar
  17. 17.
    Rother M (2010) Toyota Kata. MacGraw Hill, New YorkGoogle Scholar
  18. 18.
    Sanders L (2013) Problématiques géographiques, systémes complexes et modélisation. In: Rencontres nationales systémes complexes (RNSC)Google Scholar
  19. 19.
    Sugimori Y, Kusunoki K, Cho F, Uchikawa S (1977) Toyota production system and Kanban system materialization of just-in-time and respect-for-human system. Int J Prod Res 15(6):553–564CrossRefGoogle Scholar
  20. 20.
    Vitali S, Glattfelder JB, Battiston S (2011) The network of global corporate control. PloS One 6(10):e25995ADSCrossRefGoogle Scholar
  21. 21.
    Womack JP, Jones DT, Roos D (1991) The machine that changed the World: the story of lean production. The MIT international motor vehicle program. HarperCollins, New YorkGoogle Scholar

Copyright information

© Springer International Publishing Switzerland 2017

Authors and Affiliations

  • Pierre Masai
    • 1
    • 2
    • 3
    Email author
  • Pierre Parrend
    • 1
    • 3
    • 4
  • Nicolas Toussaint
    • 1
  • Pierre Collet
    • 1
    • 3
  1. 1.ICube LaboratoryUniversité de StrasbourgStrasbourgFrance
  2. 2.Toyota Motor EuropeBruxellesBelgium
  3. 3.Complex System Digital Campus (UNESCO Unitwin)ParisFrance
  4. 4.ECAM Strasbourg-EuropeSchiltigheimFrance

Personalised recommendations