The updated original online version for this chapter can be found at 10.1007/978-3-319-45748-2_39
You have full access to this open access chapter, Download conference paper PDF
Erratum to: Chapter “The Skateboard Manufacturing Company: A Teaching Case on Production Planning and Control” in: M. Amorim et al. (eds.), Engineering Systems and Networks, Lecture Notes in Management and Industrial Engineering, DOI 10.1007/978-3-319-45748-2_39
In the original version of Chapter 39, the first author name “Macro Aurélio de Mesquita” was inadvertently published with typo error and it should read as “Marco Aurélio de Mesquita”. The erratum chapter and the book have been updated with the changes.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2017 Springer International Publishing Switzerland
About this paper
Cite this paper
de Mesquita, M.A., Girotti, L.J., Tomotani, J.V. (2017). Erratum to: The Skateboard Manufacturing Company: A Teaching Case on Production Planning and Control. In: Amorim, M., Ferreira, C., Vieira Junior, M., Prado, C. (eds) Engineering Systems and Networks. Lecture Notes in Management and Industrial Engineering. Springer, Cham. https://doi.org/10.1007/978-3-319-45748-2_40
Download citation
DOI: https://doi.org/10.1007/978-3-319-45748-2_40
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-45746-8
Online ISBN: 978-3-319-45748-2
eBook Packages: EngineeringEngineering (R0)