Skip to main content

Processing of a New Task in Conditions of the Agile Management with Using of Programmable Queues

  • Conference paper
  • First Online:
Computational Science and Its Applications -- ICCSA 2016 (ICCSA 2016)

Part of the book series: Lecture Notes in Computer Science ((LNTCS,volume 9789))

Included in the following conference series:

Abstract

The paper deals with an unpredictable appearance of a new project task in real-time designing a system with the software. Usually, this occurs at a time when the designer works in a multitasking mode and other members of the designers’ team also work with delegated tasks. For regulating such activity, the use of the Agile management is not sufficient. In described case study, Agile means are combined with means of an interruption management which is adjusted on processing the interruption reason “New task”. In the processing of the new task, the designer applies a framework “model of precedent” and its iterative filling by content with using a figuratively semantic support. Combining the indicated means is implemented in the toolkit OwnWIQA.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Jacobson, I., Ng, P.-W., McMahon, P., Spence, I., Lidman, S.: The essence of software engineering: the SEMAT kernel. Queue 10(10), 1–12 (2012)

    Google Scholar 

  2. Adler, R.F., Benbunan-Fich, R.: Self-interruptions in discretionary multitasking. Comput. Hum. Behav. 29(4), 1441–1449 (2013)

    Article  Google Scholar 

  3. Sosnin, P., Lapshov, Y., Svyatov, K.: Programmable managing of workflows in development of software-intensive systems. In: Ali, M., Pan, J.-S., Chen, S.-M., Horng, M.-F. (eds.) IEA/AIE 2014, Part I. LNCS(LNAI), vol. 8481, pp. 138–147. Springer, Heidelberg (2014)

    Chapter  Google Scholar 

  4. Sosnin, P.: Combining of kanban and scrum means with programmable queues in designing of software intensive systems. In: Fujita, H., Guizzi, G. (eds.) SoMeT 2015. CCIS, vol. 532, pp. 367–377. Springer, Heidelberg (2015)

    Chapter  Google Scholar 

  5. Jin, J., Dabbish, L.A.: Self-interruption on the computer: a typology of discretionary task interleaving. In: Proceedings of the SIGCHI Conference on Human Factors in Computing Systems, CHI 2009, pp. 1799–1808. ACM, New York (2009)

    Google Scholar 

  6. Sosnin, P.: Computerized environment for conceptual experimenting in automated designing. In: Proceedings of the 9th International Conference on Application of Information and Communication Technologies (AICT), Rostov on Done, Russia, pp. 451–457 (2015)

    Google Scholar 

  7. Darmoul, S., Ahmad, A., Ghaleb, M., Alkahtani, M.: Interruption management in human multitasking environment. In: Proceedings of the 15th IFAC Symposium on Information Control Problems in Manufacturing, Ottawa, Canada, vol. 48(3), pp. 1179–1185. IFAC-PapersOnLine, 11–13 May 2015 (2015)

    Google Scholar 

  8. MCM-0056-2010: NATO Concept Development and Experimentation (CD&E) Process. Brussels: NATO HQ (2010)

    Google Scholar 

  9. Wiel, W.M., Hasberg, M.P., Weima, I., Huiskamp, W.: Concept maturity levels bringing structure to the CD&E process. In: Proceedings of the I/ITSEC 2010, Interservice Industry Training, Simulation and Education Conference, Orlando, pp. 2547–2555 (2010)

    Google Scholar 

  10. Jaros, V.: Concept development and experimentation in project STRUCTURE. In: Cybernetic Letters. Expertia, o.p.s., Brno, vol. 2, pp. 36–41 (2011)

    Google Scholar 

  11. Karray, F., Alemzadeh, M., Saleh, J.A., Arab, M.N.: Human-computer interaction: overview on state of the art. Smart Sens Intell. Syst. 1, 138–159 (2008)

    Google Scholar 

  12. Leiva, L. A.: MouseHints: easing task switching in parallel browsing. In: CHI 2011 Extended Abstracts on Human Factors in Computing Systems, pp. 1957–1962. ACM, New York (2011)

    Google Scholar 

Download references

Acknowledgement

This work was supported by the Russian Fund for Basic Research (RFBR), Grant #15-07-04809a.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to P. Sosnin .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2016 Springer International Publishing Switzerland

About this paper

Cite this paper

Sosnin, P. (2016). Processing of a New Task in Conditions of the Agile Management with Using of Programmable Queues. In: Gervasi, O., et al. Computational Science and Its Applications -- ICCSA 2016. ICCSA 2016. Lecture Notes in Computer Science(), vol 9789. Springer, Cham. https://doi.org/10.1007/978-3-319-42089-9_39

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-42089-9_39

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-42088-2

  • Online ISBN: 978-3-319-42089-9

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics