Skip to main content

Boulby Mine Backfill System

  • Chapter
  • First Online:
Paste Tailings Management
  • 837 Accesses

Abstract

Paterson & Cooke’s involvement with the Boulby mine backfill system began with the initial investigation studies in the mid-1990s and continued through detailed design, construction, to commissioning in 2003 with further ad hoc post-commissioning assistance. A number of papers were published at international conferences during this period and this chapter brings together these past publications (Fehrsen et al. 2002; Wilkins et al. 2004; Keen et al. 2007) and provides a holistic overview of the project from the initial study phase to full-scale operations.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 139.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Boulby, United Kingdom. http://www.mining-technology.com/projects/boulby. Accessed 14 April 2015

  • Fehrsen MG, Goosen PE, Wilkins MJ ((2002) On-site backfill slurry characterisation tests at Boulby Mine: a case study. In: Proceeding 15th Int. Conf. on hydrotransport. BHR Group, Banff, pp 161–171

    Google Scholar 

  • Keen M, Fehrsen M, Cooke R (2007) Boulby mine backfill system: operational experience, Minefill 2007. Montreal Quebec, Canada, May 2007

    Google Scholar 

  • Wilkins MJ, Gilchrist C, Fehrsen M, Cooke R (2004) Boulby mine backfill system: design, commissioning and operation. Proceedings 16th international conference on hydrotransport. BHR Group, Chile. Also presented at Minefill 2004, Beijing, China, September 2004

    Google Scholar 

Download references

Acknowledgements

The author acknowledges the contributions of the various authors of the previously published papers that are listed at the end of the chapter.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Barend Jacobus Snyman .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2017 Springer International Publishing Switzerland

About this chapter

Cite this chapter

Snyman, B.J. (2017). Boulby Mine Backfill System. In: Yilmaz, E., Fall, M. (eds) Paste Tailings Management. Springer, Cham. https://doi.org/10.1007/978-3-319-39682-8_11

Download citation

Publish with us

Policies and ethics