Abstract
It is very important to take proper care during erection of process units, plant machinery, site fabrication of large-diameter storage tanks, absorption towers with internal acid-resistant linings and connections of pipelines; installation and calibration of instrumentation (e.g. calibrations of level indicators, thermocouples, flowmeters, reaction vessels), curing of the internal lining (of bricks or other material) while setting up a new process plant.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2016 Springer International Publishing Switzerland
About this chapter
Cite this chapter
Golwalkar, K.R. (2016). Erection and Commissioning. In: Production Management of Chemical Industries. Springer, Cham. https://doi.org/10.1007/978-3-319-28253-4_4
Download citation
DOI: https://doi.org/10.1007/978-3-319-28253-4_4
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-28251-0
Online ISBN: 978-3-319-28253-4
eBook Packages: Chemistry and Materials ScienceChemistry and Material Science (R0)