Erection and Commissioning

  • Chapter
  • First Online:
Production Management of Chemical Industries
  • 827 Accesses

Abstract

It is very important to take proper care during erection of process units, plant machinery, site fabrication of large-diameter storage tanks, absorption towers with internal acid-resistant linings and connections of pipelines; installation and calibration of instrumentation (e.g. calibrations of level indicators, thermocouples, flowmeters, reaction vessels), curing of the internal lining (of bricks or other material) while setting up a new process plant.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

eBook
USD 16.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 139.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Kiran R. Golwalkar .

Rights and permissions

Reprints and permissions

Copyright information

© 2016 Springer International Publishing Switzerland

About this chapter

Cite this chapter

Golwalkar, K.R. (2016). Erection and Commissioning. In: Production Management of Chemical Industries. Springer, Cham. https://doi.org/10.1007/978-3-319-28253-4_4

Download citation

Publish with us

Policies and ethics