Advance amounts required by vendors are generally 15–25 % of cost of machinery (in case the cost of machinery is in the range of about 50–70 % of total cost of project depending on the complexity of technology). Vendors may ask for greater advance amount if costly materials of construction (stainless steel, titanium, or special alloys) are required for fabrication, pressure vessels are to be supplied or equipment designs are complicated such as special reactors or boilers.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsAuthor information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2016 Springer International Publishing Switzerland
About this chapter
Cite this chapter
Golwalkar, K.R. (2016). Financial and Commercial Matters. In: Production Management of Chemical Industries. Springer, Cham. https://doi.org/10.1007/978-3-319-28253-4_2
Download citation
DOI: https://doi.org/10.1007/978-3-319-28253-4_2
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-28251-0
Online ISBN: 978-3-319-28253-4
eBook Packages: Chemistry and Materials ScienceChemistry and Material Science (R0)