Abstract
Logistic project management consists of a few phases, which may be generally defined as vision, planning, implementation, control, and project closure. In projects which involve logistic planning, logistic chain management, and physical distribution of goods, risk management issues are supposed to be included. Moreover they are often critical for the safety and security of the project implementation. Precise definition of risk factors is often difficult; however it is essential in the process of logistic project planning. Risk factors are individual for each logistic chain. They should be classified and their significance for the project should be assigned. Risk factors’ classification GEMIO is a tool, which can be used to define risks in logistic processes and to plan the necessary safety and security procedures.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsReferences
Smith D., Fischbacher M: The changing nature of risk and risk management: The challenge of borders, uncertainty and resilience. Risk Management (2009) 11.
Author’s own study.
Fischbacher-Smith D: Destructive landscapes – (Re)framing elements of risk? Risk Management (2011) 13.
Borghesi A., Gaudenzi B: Risk Management. http://link.springer.com/search?query=Risk+Identification++Basic+Stage+in+Risk+Management#page-1.
Książkiewicz D., Mierkiewicz D: Bezpieczeństwo we współczesnych łańcuchach logistycznych. (w:) “Współczesne problemy rozwoju transportu zrównoważonego”. Praca zbiorowa pod red. R. Rolbieckiego, Zeszyty Naukowe Uniwersytetu Gdańskiego, Ekonomika Transportu i Logistyka, nr 43. Wydawnictwo UG, Gdańsk 2012.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2016 Springer International Publishing Switzerland
About this paper
Cite this paper
Książkiewicz, D. (2016). Risk Factor Classification GEMIO in the Planning Phase of Logistic Project Management. In: Bąk, M. (eds) Transport Development Challenges in the Twenty-First Century. Springer Proceedings in Business and Economics. Springer, Cham. https://doi.org/10.1007/978-3-319-26848-4_19
Download citation
DOI: https://doi.org/10.1007/978-3-319-26848-4_19
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-26846-0
Online ISBN: 978-3-319-26848-4
eBook Packages: Business and ManagementBusiness and Management (R0)