Skip to main content

PLM Implementation Strategy and Plan

  • Chapter
  • First Online:
Product Lifecycle Management (Volume 2)

Part of the book series: Decision Engineering ((DECENGIN))

Abstract

This chapter shows how a company should develop the PLM Implementation Strategy and Plan. The PLM Implementation Strategy shows the activities that have to be carried out to move forward from the current use of PLM resources to the future use of PLM resources. The Implementation Strategy may be very different in different companies. Their current and future situations are different. The scope of activities considered is likely to be different. And there are many ways to get from the current situation to the future situation. So, it’s to be expected that each company will create a different Implementation Strategy. In turn, it’s to be expected that each company will create a different Implementation Plan which will be built up of manageable and prioritised sub-projects. This chapter describes some of the questions that may arise when developing the Implementation Strategy and Plan. It identifies the areas to be addressed.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to John Stark .

Rights and permissions

Reprints and permissions

Copyright information

© 2016 Springer International Publishing Switzerland

About this chapter

Cite this chapter

Stark, J. (2016). PLM Implementation Strategy and Plan. In: Product Lifecycle Management (Volume 2). Decision Engineering. Springer, Cham. https://doi.org/10.1007/978-3-319-24436-5_29

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-24436-5_29

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-24434-1

  • Online ISBN: 978-3-319-24436-5

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics