Skip to main content

An Integrated Approach for Progress Tracking in Liquefied Natural Gas Construction

  • Conference paper
  • First Online:

Part of the book series: Lecture Notes in Computer Science ((LNISA,volume 9320))

Abstract

Progress tracking is an essential management function for successful delivery of Liquefied Natural Gas (LNG) projects. It relies on accurate and prompt data collection from construction sites and project participants, which is then used to early detect actual or potential schedule delay. Currently, many Information Technology (IT)-supported methods have been implemented to improve progress tracking. However, none of them has been able to deliver satisfactory and reliable information. This paper aims to develop an integrated approach for construction progress tracking by integrating laser scanning, Building Information Modeling, mobile computing and Radio Frequency Identification. The approach consists of three modules: milestone progress tracking, onsite activity/Task progress tracking, and supply chain tracking. Finally, a pilot LNG project was selected to validate this approach.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   39.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

References

  1. Ellis, M., Heyning, C., Legrand, O.: Extending the LNG boom: improving Australian LNG productivity and competitiveness. McKinsey Global Institute, Report (2013)

    Google Scholar 

  2. Halpin, D.W.: Construction Management. Wiley, Hoboken (2010)

    Google Scholar 

  3. Dong, N., Fischer, M., Haddad, Z., Levitt, R.: A method to automate look-ahead schedule (LAS) generation for the finishing phase of construction projects. Autom. Constr. 35, 157–173 (2013)

    Google Scholar 

  4. Turkan, Y., Bosche, F., Haas, C.T., Haas, R.: Automated progress tracking using 4D schedule and 3D sensing technologies. Autom. Constr. 22, 414–421 (2012)

    Article  Google Scholar 

  5. El-Omari, S., Moselhi, O.: Integrating automated data acquisition technologies for progress reporting of construction projects. Autom. Constr. 20(6), 699–705 (2011)

    Article  Google Scholar 

  6. Chi, H.-L., Wang, J., Wang, X., Truijens, M., Yung, P.: A conceptual framework of quality-assured fabrication, delivery and installation processes for liquefied natural gas (LNG) plant construction. J. Intell. Rob. Syst. 1–16 (2014)

    Google Scholar 

  7. Wang, J., Sun, W., Shou, W., Wang, X., Wu, C., Chong, H.-Y., Liu, Y., Sun, C.: Integrating BIM and LiDAR for real-time construction quality control. J. Intell. Rob. Syst. 1–16 (2014)

    Google Scholar 

  8. Kiziltas, S., Akinci, B.: The need for prompt schedule update by utilizing reality capture technologies: a case study. In: Proceedings of Construction Research Congress, San Diego, CA (2005)

    Google Scholar 

  9. Azimi, R., Lee, S., AbouRizk, S.M., Alvanchi, A.: A framework for an automated and integrated project monitoring and control system for steel fabrication projects. Autom. Constr. 20(1), 88–97 (2011)

    Article  Google Scholar 

  10. Song, L., Eldin, N.N.: Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling. Autom. Constr. 27, 32–39 (2012)

    Article  Google Scholar 

  11. Cheng, J.C., Law, K.H., Bjornsson, H., Jones, A., Sriram, R.: A service oriented framework for construction supply chain integration. Autom. Constr. 19(2), 245–260 (2010)

    Article  Google Scholar 

  12. Chou, J.-S., Chen, H.-M., Hou, C.-C., Lin, C.-W.: Visualized EVM system for assessing project performance. Autom. Constr. 19(5), 596–607 (2010)

    Article  Google Scholar 

  13. Akhavian, R., Behzadan, A.H.: An integrated data collection and analysis framework for remote monitoring and planning of construction operations. Adv. Eng. Inform. 26(4), 749–761 (2012)

    Article  Google Scholar 

  14. Yang, Y.-C., Park, C.-J., Kim, J.-H., Kim, J.-J.: Management of daily progress in a construction project of multiple apartment buildings. J. Constr. Eng. Manage. 133(3), 242–253 (2007)

    Article  Google Scholar 

  15. Cheng, T., Teizer, J.: Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications. Autom. Constr. 34, 3–15 (2013)

    Article  Google Scholar 

  16. Koo, B., Fischer, M.: Feasibility study of 4D CAD in commercial construction. J. Constr. Eng. Manage. 126(4), 251–260 (2000)

    Article  Google Scholar 

  17. Wang, J., Wang, X., Shou, W., Xu, B.: Integrating BIM and augmented reality for interactive architectural visualisation. Constr. Innov. 14(4), 453–476 (2014)

    Article  Google Scholar 

  18. Shou, W., Wang, J., Wang, X., Chong, H.Y.: A comparative review of building information modelling implementation in building and infrastructure industries. Arch. Comput. Methods Eng. 22(2), 291–308 (2015)

    Google Scholar 

  19. Hou, L., Wang, X., Wang, J., Truijens, M.: An integration framework of advanced technologies for productivity improvement for LNG mega-projects. J. Inf. Technol. Constr. 19, 360–382 (2014)

    Google Scholar 

  20. Thorp, J.: The Information Paradox – Realizing the Business Benefits of Information Technology. McGraw-Hill, Toronto (2003)

    Google Scholar 

Download references

Acknowledgement

This research was undertaken with the benefit of a grant from Australian Research Council Linkage Program (Grant No. LP130100451).

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Jun Wang .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2015 Springer International Publishing Switzerland

About this paper

Cite this paper

Wang, J., Shou, W., Wang, X., Chi, HL. (2015). An Integrated Approach for Progress Tracking in Liquefied Natural Gas Construction. In: Luo, Y. (eds) Cooperative Design, Visualization, and Engineering. CDVE 2015. Lecture Notes in Computer Science(), vol 9320. Springer, Cham. https://doi.org/10.1007/978-3-319-24132-6_33

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-24132-6_33

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-24131-9

  • Online ISBN: 978-3-319-24132-6

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics