Abstract
The TSO uses contracts to facilitate the maintenance of the system frequency, that is, balance in the system. One can roughly distinguish between two kinds of contracts.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Notes
- 1.
See also Finon D and Pignon V (2008) distinguishing between four main types of solutions to compensate for the “missing money problem”: strategic reserves detained by the system operator (vertical integration), long-term contracts, capacity payments, and the capacity market.
- 2.
Point (c) of Article 27(4) of ENTSO-E Network Code on Electricity Balancing (6 August 2014).
- 3.
EPEX Spot Rules & Regulations, Appendix, Definitions (28 November 2014).
- 4.
ACER, Framework Guidelines on Electricity Balancing (18 September 2012), section 1.1.
- 5.
ENTSO-E Network Code on Electricity Balancing (6 August 2014).
- 6.
- 7.
- 8.
- 9.
Article 27(8) of ENTSO-E Network Code on Electricity Balancing (6 August 2014).
- 10.
For definitions, see Article 2 of ENTSO-E Network Code on Electricity Balancing (6 August 2014).
- 11.
Article 2 of ENTSO-E Network Code on Electricity Balancing (6 August 2014).
- 12.
Article 25 of ENTSO-E Network Code on Electricity Balancing (6 August 2014).
- 13.
Article 2 of ENTSO-E Network Code on Electricity Balancing (6 August 2014): “… Position means an energy volume representing the sum of scheduled commercial transactions of a Balance Responsible Party, on organised electricity markets or between Balance Responsible Parties, for the calculation of the Imbalance, or, where appropriate, means an energy volume representing scheduled injections, scheduled withdrawals or the sum of scheduled injections and withdrawals of a Balance Responsible Party, for the calculation of the Imbalance of that Balance Responsible Party …”
- 14.
Article 27 of ENTSO-E Network Code on Electricity Balancing (6 August 2014).
- 15.
§ 4 StromNZV (Verordnung über den Zugang zu Elektrizitätsversorgungsnetzen).
- 16.
§ 26(1) StromNZV.
- 17.
§ 26(2) StromNZV: “Der Vertrag muss unter Berücksichtigung der Vorschriften des Energiewirtschaftsgesetzes und dieser Verordnung mindestens Regelungen zu folgenden Gegenständen enthalten: 1. Vertragsgegenstand; 2. Rechte, Pflichten und Leistungen des Betreibers von Übertragungsnetzen; 3. Rechte und Pflichten des Bilanzkreisverantwortlichen; 4. Datenaustausch zwischen dem Betreiber von Übertragungsnetzen und dem Bilanzkreisverantwortlichen; 5. Haftungsbestimmungen; 6. Voraussetzungen für die Erhebung einer Sicherheitsleistung in begründeten Fällen; 7. Kündigungsrechte der Vertragsparteien”. § 26(3) StromNZV: “In den Bilanzkreisverträgen ist sicherzustellen, dass die Bilanzkreisverantwortlichen gegen angemessenes Entgelt ihren Bilanzkreis für Fahrplangeschäfte öffnen, die der Bereitstellung von Minutenreserve dienen, die ein Bereitsteller des eigenen Bilanzkreises über einen anderen Bilanzkreis abwickeln will”.
- 18.
See Neveling S and Schönrock KP (2009), § 29, number 77.
- 19.
Neveling S and Schönrock KP (2009), § 29, number 76.
- 20.
Zuordnungsvereinbarung zwischen Verteilnetzbetreiber (VNB) und Bilanzkreisverantwortlicher (BKV), Version 1.0, 9 June 2011. See Neveling S and Schönrock KP (2009), § 29, number 76.
- 21.
See, for example, Zuordnungsvereinbarung zwischen Verteilnetzbetreiber (VNB) und Bilanzkreisverantwortlicher (BKV), Version 1.0, 9 June 2011, Chapter 15.1.
- 22.
Article 12 Directive 2009/72/EC (Third Electricity Directive).
- 23.
See Article 61 of Network Code on Electricity Balancing (6 August 2014).
- 24.
Articles 12 and 15 of Directive 2009/72/EC (Third Electricity Directive).
- 25.
Neveling S and Schönrock KP (2009), § 29, numbers 78–80.
- 26.
Pilgram T (2010), p. 343, point 631.
- 27.
See also Hunt S and Shuttleworth G (1996), p. 141.
- 28.
See Rious V et al. (2012).
- 29.
Ibid.
- 30.
Ibid, footnote 25.
- 31.
Article 15(6) of Directive 2009/72/EC (Third Electricity Directive).
- 32.
Article 29(1) of ENTSO-E Network Code on Electricity Balancing (6 August 2014).
- 33.
- 34.
Article 29(7)(b) of ENTSO-E Network Code on Electricity Balancing (6 August 2014).
- 35.
- 36.
- 37.
Rahmenvertrag über die Vergabe von Aufträgen zur Erbringung der Regelenergieart Primärregelleistung, § 1.1(1) and § 3.1(2).
- 38.
Ibid, § 1.1(2), § 5.3(1) and § 5.3(3).
- 39.
Ibid, § 1.2.
- 40.
Ibid, § 2.3(1).
- 41.
Ibid, § 4.1.
- 42.
Ibid, § 5.2(2): “Die Annahme der Angebote (Zuschlag) erfolgt in einem Vergabeprozess nach folgenden Kriterien: – Niedrigster Leistungspreis. – Bei Gleichheit der Leistungspreise: Frühester Eingangszeitstempel”.
- 43.
Ibid, § 5.2(3): “Die Belange des sicheren Netzbetriebes, z. B. im Falle von Netzengpässen, werden vorrangig berücksichtigt”.
- 44.
Ibid, § 5.2(4).
- 45.
Ibid, § 6.1(1).
- 46.
Ibid, § 6.3.
- 47.
Ibid, § 6.2(2) and § 6.4(1).
- 48.
Ibid, § 7.1(1).
- 49.
Ibid, § 6.1(2) and § 12(1).
- 50.
Ibid, § 12(2).
- 51.
Ibid, § 13(1) and § 13(2).
- 52.
Ibid, § 13(3).
- 53.
Ibid, § 13(4).
- 54.
Ibid, § 13(5).
- 55.
Ibid, § 16 and § 18.
- 56.
Ibid, § 19(1), § 19(2) and § 19(6).
- 57.
Ibid, § 19(4).
- 58.
Rahmenvertrag über die Vergabe von Aufträgen zur Erbringung von Abschaltleistung aus abschaltbaren Lasten, § 2.1(7).
- 59.
Ibid, § 1.2(1).
- 60.
Ibid, § 1.1 and § 5.3(4).
- 61.
Ibid, § 2.1(1) and § 2.1(5).
- 62.
Ibid, § 2.2(1).
- 63.
Ibid, § 5.2.
- 64.
Ibid, § 5.3(5).
- 65.
Ibid, § 6.1(1).
- 66.
Ibid, § 6.1(2) and § 12.
- 67.
Ibid, § 7.1.
References
ACER, Framework Guidelines on Electricity Balancing (18 September 2012)
ENTSO-E Network Code on Electricity Balancing (6 August 2014)
Finon D, Pignon V (2008) Electricity and long-term capacity adequacy: the quest for regulatory mechanism compatible with electricity market. Utilities Policy 16(3):143–158
Hunt S, Shuttleworth G (1996) Competition and choice in electricity. Wiley, Chichester
Lanz M, Fricke B, Anthrakidis A et al (2011) CO2-Emissionsminderung durch Ausbau, informationstechnische Vernetzung und Netzoptimierung von Anlagen dezentraler, fluktuierender und erneuerbarer Energienutzung in Deutschland. Umweltbundesamt, Climate Change 20/2011
Neveling S, Schönrock KP (2009) Nicht standardisierte Liefer- und Handelsverträge sowie vertragliche Voraussetzungen auf der Netzzugangsseite. In: Zenke I, Schäfer R (eds) Energiehandel in Europa. Öl, Gas, Strom, Derivate, Zertifikate, 2nd edn. C.H. Beck, München, § 29
Pilgram T (2010) A. Formen des Handels an der EEX. In: Schwintowski HP (ed) Handbuch Energiehandel, 2nd edn. Erich Schmidt Verlag, Berlin, pp 339–398
Rious V, Roques F, Perez Y (2012) Which electricity market design to encourage the development of demand response? EUI Working Paper RSCAS 2012/12
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 2015 Springer International Publishing Switzerland
About this chapter
Cite this chapter
Mäntysaari, P. (2015). Balancing Contracts and Balance Group Contracts. In: EU Electricity Trade Law. Springer, Cham. https://doi.org/10.1007/978-3-319-16513-4_9
Download citation
DOI: https://doi.org/10.1007/978-3-319-16513-4_9
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-16512-7
Online ISBN: 978-3-319-16513-4
eBook Packages: Humanities, Social Sciences and LawLaw and Criminology (R0)