Cost System Under Uncertainty: A Case Study in the Imaging Area of a Hospital

  • Victor JiménezEmail author
  • Carla Duarte
  • Paulo Afonso
Chapter
Part of the Lecture Notes in Management and Industrial Engineering book series (LNMIE)

Abstract

An activity-based costing (ABC) system is based on the premise that activities consume resources and cost objects (e.g. products and services) consume activities. The development of effective costing systems requires a good design of processes and activities. But some business and production systems can be characterized by high levels of uncertainty. In the particular case of hospitals, the amount of resources consumed for the same type of examination by two different patients can be completely different, which may hinder costs and to bias the process of budget planning. This paper presents an ABC costing model for the imaging area of a hospital, including the uncertainty of the processes. A Monte Carlo simulation was made and interesting results were obtained. The probabilistic ABC costing model is a tool that can be used to improve decision making.

Keywords

Hospitals cost management Activity based costing Uncertainty and risk management Monte Carlo simulation 

References

  1. Baker JJ, Boyd GF (1997) Activity-based costing in the operating room at valley view hospital. J Health Care Finance 24(1):1–9Google Scholar
  2. Baxendale SJ, Dornbusch V (2000) Activity-based costing for a hospice. Strategic Finance-Montvale, 81:64–70Google Scholar
  3. Chansaad A, Rattanamanee W (2012) A fuzzy time-driven activity-based costing model in an uncertain manufacturing environment. Apiems.net, 1949–1959Google Scholar
  4. Davila A, Foster G, Oyon D (2009) Accounting and control, entrepreneurship and innovation: venturing into new research opportunities. Eur Account Rev 18(2):281–311. doi: 10.1080/09638180902731455 CrossRefGoogle Scholar
  5. Demeere N, Stouthuysen K, Roodhooft F (2009) Time-driven activity-based costing in an outpatient clinic environment: development, relevance and managerial impact. Health Policy (Amsterdam, Netherlands), 92(2–3):296–304. doi: 10.1016/j.healthpol.2009.05.003
  6. Hammersley JM, Handscomb DC (1964) Monte carlo methods, vol 1. Methuen & CO LTD, Springer, LondonGoogle Scholar
  7. Kaplan R, Anderson S (2007) The innovation of time-driven activity-based costing. J Cost Manage 2(21):5–15Google Scholar
  8. Laurila J, Suramo I, Brommels M, Tolppanen EM, Koivukangas P, Lanning P, Standertskjöld-Nordenstam G (2000) Activity-based costing in radiology. Application in a pediatric radiological unit. Acta Radiologica (Stockholm, Sweden: 1987), 41(2):189–195Google Scholar
  9. Lawson R (2005) The use of activity based costing in the healthcare industry: 1994 vs 2004. Res Healthc Fin 10(1):77–94Google Scholar
  10. Nachtmann H, Needy KL (2001) Fuzzy activity based costing: a methodology for handling uncertainty in activity based costing systems. Eng Econ 46(4):245–273. doi: 10.1080/00137910108967577 CrossRefGoogle Scholar
  11. Nachtmann H, Needy KL (2003) Methods for handling uncertainty in activity based costing systems. Eng Econ 48(3):259–282. doi: 10.1080/00137910308965065 CrossRefGoogle Scholar
  12. Rivero EJR, Emblemsvåg J (2007) Activity-based life-cycle costing in long-range planning. Rev Account Finance 6(4):370–390. doi: 10.1108/14757700710835041 CrossRefGoogle Scholar
  13. Ross TK (2004) Analyzing health care operations using ABC. J Health Care Finance 30(3):1–20Google Scholar

Copyright information

© Springer International Publishing Switzerland 2015

Authors and Affiliations

  1. 1.Departamento de Produção e Sistemas, Escola de EngenheirasUniversidade do MinhoBragaPortugal
  2. 2.Departamento de Contabilidad y Finanzas, Facultad de Ciencias de la AdministraciónUniversidad del ValleCaliColombia

Personalised recommendations