Abstract
To achieve overall business goals, GQM+Strategies® is an approach that aligns the business goals at each level of an organization to strategies and assesses the achievement of goals. Strategies derived from business goals are based on rationales (contexts and assumptions). Because extracting all rationales is an important process in the GQM+Strategies approach, we propose Context-Assumption-Matrix (CAM), which refines the GQM+Strategies model by extracting rationales based on the analysis of the relationships between stakeholders, and the Context Assumption (C/A) definition template to unify the expressive style of contexts and assumptions. To demonstrate the effectiveness of CAM, we conducted an experiment involving 43 students majoring in information sciences at Shimane University in Japan. GQM+Strategies with CAM can extract rationales more efficiently and exhaustively than GQM+Strategies alone. Moreover, when the management policy or the business environment changes, GQM+Strategies with CAM can analyze the rationales and the GQM+Strategies model easily.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsPreview
Unable to display preview. Download preview PDF.
References
Trendowicz, A., et al.: Aligning software projects with business objectives. In: Software Measurement, 2011 Joint Conference of the 21st Int’l Workshop on and 6th Int’l Conference on Software Process and Product Measurement (IWSM-MENSURA). IEEE (2011)
Mandić, V., Harjumaa, L., Markkula, J., Oivo, M.: Early empirical assessment of the practical value of GQM +  Strategies. In: Münch, J., Yang, Y., Schäfer, W., et al. (eds.) ICSP 2010. LNCS, vol. 6195, pp. 14–25. Springer, Heidelberg (2010)
Basili, V., et al.: Bridging the gap between business strategy and software development (2007)
Basili, V., et al.: Linking software development and business strategy through measurement. arXiv preprint arXiv: 1311.6224 (2013)
Kaneko, T., et al.: Application of GQM+Strategies in the Japanese Space Industry. In: Software Measurement, 2011 Joint Conference of the 21st Int’l Workshop on and 6th Int’l Conference on Software Process and Product Measurement (IWSM-MENSURA). IEEE (2011)
Basili, V., Lampasona, C., Ocampo RamĂrez, A.E.: Aligning Corporate and IT Goals and Strategies in the Oil and Gas Industry. In: Heidrich, J., Oivo, M., Jedlitschka, A., Baldassarre, M.T. (eds.) PROFES 2013. LNCS, vol. 7983, pp. 184–198. Springer, Heidelberg (2013)
Sarcia, et al.: Is GQM+ Strategies really applicable as is to non-software development domains? In: Proceedings of the ACM-IEEE International Symposium on Empirical Software Engineering and Measurement. ACM (2010)
GQM+Strategies- the Fraunhofer CESE, Web site: http://www.fc-md.umd.edu/ (retrieved October 1, 2014)
GQM+Strategies- Fraunhofer IESE Fraunhofer Gesellschaft, Web site: http://www.iese.fraunhofer.de/de/produkte/gqm.html (retrieved June 18, 2014)
Solingen, V., et al.: Goal question metric (gqm) approach. Encyclopedia of Software Engineering (2002)
Hall, T., et al.: Implementing effective software metrics programs. IEEE Software 14(2), 55–65 (1997)
Mandić, V., et al.: Utilizing GQM+ Strategies for business value analysis: An approach for evaluating business goals. In: Proceedings of the ACM-IEEE International Symposium on Empirical Software Engineering and Measurement. ACM (2010)
Mandić, V., Oivo, M.: SAS: A tool for the GQM + Strategies grid derivation process. In: Ali Babar, M., Vierimaa, M., Oivo, M. (eds.) PROFES 2010. LNCS, vol. 6156, pp. 291–305. Springer, Heidelberg (2010)
i* Intentional STrategic Actor Relationships modelling – istar. from the Knowledge Management Lab, University of Toronto Web site: http://www.cs.toronto.edu/km/istar/ (retrieved June 6, 2014)
Yu, E.S.: Social modeling and i*. In: Borgida, A.T., Chaudhri, V.K., Giorgini, P., Yu, E.S. (eds.) Mylopoulos Festschrift 2009. LNCS, vol. 5600, pp. 99–121. Springer, Heidelberg (2009)
Yu, E.: Towards modelling and reasoning support for early-phase requirements engineering. In: Proceedings of the Third IEEE International Symposium on Requirements Engineering. IEEE (1997)
Yamamoto, S., Ibe, K., Verner, J., Cox, K., Bleistein, S.: Actor relationship analysis for the i* framework. In: Filipe, J., Cordeiro, J. (eds.) ICEIS 2009. LNBIP, vol. 24, pp. 491–500. Springer, Heidelberg (2009)
MĂĽnch, J., et al.: Experiences and Insights from Applying GQM+Strategies in a Systems Product Development Organization. In: 39th SEAA, p. 21 (2013)
Ebert, C.: Requirements before the requirements: Understanding the upstream impacts. Requirements Engineering. In: 13th IEEE International Conference on Proceedings. IEEE (2005)
Kobori, T., Washizaki, H., Fukazawa, Y., Hirabayashi, D., Shintani, K., Okazaki, Y., Kikushima, Y.: Efficient identification of rationales by stakeholder relationship analysis to refine and maintain gQM+Strategies models. In: Zowghi, D., Jin, Z., et al. (eds.) APRES 2014. CCIS, vol. 432, pp. 77–82. Springer, Heidelberg (2014)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2014 Springer International Publishing Switzerland
About this paper
Cite this paper
Kobori, T. et al. (2014). Identifying Rationales of Strategies by Stakeholder Relationship Analysis to Refine and Maintain GQM+Strategies Models. In: Jedlitschka, A., Kuvaja, P., Kuhrmann, M., Männistö, T., Münch, J., Raatikainen, M. (eds) Product-Focused Software Process Improvement. PROFES 2014. Lecture Notes in Computer Science, vol 8892. Springer, Cham. https://doi.org/10.1007/978-3-319-13835-0_6
Download citation
DOI: https://doi.org/10.1007/978-3-319-13835-0_6
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-13834-3
Online ISBN: 978-3-319-13835-0
eBook Packages: Computer ScienceComputer Science (R0)