Performance Improvement by Scheduling Techniques: A Case of Leather Industry Development Institute

  • Conference paper
Afro-European Conference for Industrial Advancement

Part of the book series: Advances in Intelligent Systems and Computing ((AISC,volume 334))

Abstract

The model leather products manufacturing factory of leather industry development institute (LIDI) suffers from poor performances due to various problems. The purpose of this study is, therefore, to improve the performance of the case company using scheduling techniques. Proper scheduling technique can result in dramatic improvements in layout, utilization, idle time, make span and tardiness reduction. The existing company performance and various another scenarios were analyzed by using different sequencing rules plus Johnson’s and Campbell’s algorithms. The analysis and discussion showed that the feasible scheduling was of flow shop and while product layout was seen most preferable that result in reduction of machine idle time & make span by 3.00 & 4.33 hours respectively. Total flow time was reduced by 82.9% and machine utilization was improved by 16.15% when compared with existing layout. Through production lines 1 or 2 of scenario-2 with the sequence of J1, J2, J3, J4 and J5, the company should make possible arrangements for such improvements.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Intra health, n.d., performance improvement stages, steps and tools, http://www.intrahealth.org/sst/stage2.html (viewed August 13, 2014)

  2. Gruenberg, T.: Performance Improvement: Towards a method for finding and Prioritizing potential performance improvement areas in manufacturing operations. International Journal of Productivity and Performance Management 53(1), 52–71 (2004)

    Article  Google Scholar 

  3. Cherkos, T.: Performance Analysis and Improvement of Ethiopian Leather Footwear Factories: With Special Reference to Anbessa Shoe S.C. AAU (October 2011)

    Google Scholar 

  4. Sosimi, A., Ogunwolu, F.O., Adegbola, T.: A Makespan Optimization Scheme for NP-Hard Gari Processing Job Scheduling Using Improved Genetic Algorithm. Journal of Industrial Engineering 1(1), 1–5 (2014)

    Article  Google Scholar 

  5. Braun, O.: Single-processor scheduling with time restrictions, University of Applied Sciences Trier (August 2013)

    Google Scholar 

  6. Mancilla, C., Storer, R.H.: Stochastic Sequencing and Scheduling of an Operating Rooms. Theses and Dissertations, Lehigh University, Department of Industrial and Systems Engineering (November 14, 2009)

    Google Scholar 

  7. Leather Industry Development Institute (LIDI), Leather Industry sector development plan, Performance Report 2010–20014, GTP1, Addis Ababa

    Google Scholar 

  8. Benchmark Implementation Plan for the Ethiopian leather products Sector, Pilot Project on Anbessa Shoe Share Company and Peacock Shoe Factory, prepared by ASSC (February 2009)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Abduletif Habib .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2015 Springer International Publishing Switzerland

About this paper

Cite this paper

Habib, A., Jilcha, K., Berhan, E. (2015). Performance Improvement by Scheduling Techniques: A Case of Leather Industry Development Institute. In: Abraham, A., Krömer, P., Snasel, V. (eds) Afro-European Conference for Industrial Advancement. Advances in Intelligent Systems and Computing, vol 334. Springer, Cham. https://doi.org/10.1007/978-3-319-13572-4_21

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-13572-4_21

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-13571-7

  • Online ISBN: 978-3-319-13572-4

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics