Skip to main content

Part of the book series: Lecture Notes in Production Engineering ((LNPE))

  • 1639 Accesses

Abstract

The paper presents the unusually rapid opening of the Mavropigi lignite mine in the Western Macedonia area, Northern Greece. Three mines, employing totally 9-10 small to medium sized Bucket Wheel Excavators (BWEs) and producing annually 7-8 million tons of lignite, were scheduled to close between 2006 and 2010 and be replaced by a new bigger mine. The transition from the three closing mines to the new one had to be planned carefully, in order to maintain the total annual lignite production level. Proper short-term mine planning and design of both the initial box-cut and of the first benches, permitted the deployment of four BWEs within a 13-month period, an achievement acknowledged as “best practice”.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Kolovos, C.: Mavropigi mine: Deployment of four BWEs by May 2004 and operation in the 2004-2006 periods. PPC, Ptolemais (2004a) (in Greek)

    Google Scholar 

  2. Kolovos, C.: Coal Mining Technology, 349 p. ION Publishing Group, Athens (2004b) (in Greek)

    Google Scholar 

  3. Kolovos, C.: Corporate social responsibility and the future of mining in Greece. In: Proceedings of the 6th International Conference on Sustainable Development in the Minerals Industry, Milos island, Greece, June 30-July 3, pp. 160–166 (2013)

    Google Scholar 

  4. PPC SA-RE, Technical Mine Master Plan for PPCs LCPA and LCM, Final Draft Report. PPC, Athens (1996)

    Google Scholar 

  5. PPC SA, Annual Report 2004, Athens: PPC (2004) (in Greek)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2015 Springer International Publishing Switzerland

About this paper

Cite this paper

Kolovos, C.J. (2015). “Best Practice” Concepts for a Fast-Track Lignite Mine Opening. In: Niemann-Delius, C. (eds) Proceedings of the 12th International Symposium Continuous Surface Mining - Aachen 2014. Lecture Notes in Production Engineering. Springer, Cham. https://doi.org/10.1007/978-3-319-12301-1_25

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-12301-1_25

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-12300-4

  • Online ISBN: 978-3-319-12301-1

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics