The Application of Works Programme Management

Eight World Congress Engineering Asset Management Conference Paper 2013

  • Conference paper
  • First Online:
  • 3568 Accesses

Part of the book series: Lecture Notes in Mechanical Engineering ((LNME))

Abstract

Successful Works Programme Management (WPM) improves return on investment. Achieving successful works programme management is a challenge. It requires the right understanding of how to achieve the desired business outcomes. One size does not fit all, but instead the programme must be tailored to fit each specific time and place. The purpose of this chapter is to show how WEL Networks Ltd (WEL), as an electricity distribution utility, successfully implemented its WPM. WPM follows the model of; plan, do, act and check. This chapter covers the effective development of a 10 year asset management plan, and the selection of the best delivery model for effective and efficient delivery of the approved works programme. The chapter critically analyses work management models. In particular it identifies the benefits claimed for a WPM and some of the reported difficulties with implementation. It then considers the historical situation within WEL and shows how some of the reported problems were to be found within the WEL’s history. It details the steps that WEL has taken in developing and implementing the WPM. It discusses the objectives and critical success factors in the implementation of WPM. The mechanisms for determining the effectiveness of the WPM implementation are described. The chapter concludes with lessons learned of how the WPM has been successfully applied to improve the effectiveness and efficiency of the development and delivery of the annual works programme in relation to the approved 10 year Asset Management Plan.

Eight world congress engineering asset management conference paper 2013.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   259.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   329.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

References

  1. Ahuja V, Thiruvengadam V (2004) Project scheduling and monitoring: current research status. Constr Innov 4:19–31

    Google Scholar 

  2. Ait_Kadi D, Menye JB, Kane H (2012) Resources assignment model in maintenance activities scheduling. Int J Prod Res 49(22):6677–6689

    Google Scholar 

  3. Barney J (1991) Firm resources and sustained competitive advantage. J Manag 17(1):99

    Google Scholar 

  4. Feng K, Rao US, Raturi A (2011) Setting planned orders in master production scheduling under demand uncertainty. Int J Prod Res 49(13):4007–4025

    Article  MATH  Google Scholar 

  5. Korsaa CR (2010) Integrating business models and strategy for sustained competitive advantage—a case study of Ryanair; MSc in Economics and Business Administration. Department of Marketing, Copenhagen Business School

    Google Scholar 

  6. Othman R, Sheeham NT (2011) Value creation logics and resource management: a review. J Strategy Manag 4(1):5

    Article  Google Scholar 

  7. Porter ME (1985) Competitive advantage: creating and sustaining superior performance. Free Press, Collier Macmillan, New York, London

    Google Scholar 

  8. Porter ME (1998) Competitive advantage: creating and sustaining superior performance. Free Press, New York

    Google Scholar 

  9. Segerstedt A (2006) Master production scheduling and a comparison of material requirements planning and cover-time planning. Int J Prod Res 44(18–19):3585–3606

    Article  MATH  Google Scholar 

  10. Stabell DG, Fjeldstad OD (1998) Configuring value for competitive advantage: on chains, shops and networks. Strategic Manag J 19:413–437

    Google Scholar 

  11. Talbot FB (1982) Resource-constrained project scheduling with time-resource tradeoffs: the nopreemptive case. Manag Sci 28(10):1197–1210

    Article  MATH  Google Scholar 

  12. Toptal A, Sabuncuoglu I (2010) Distributed scheduling: a review of concepts and applications. Int J Prod Res 48(18):5235–5262

    Article  MATH  Google Scholar 

  13. WEL Networks Ltd (2013) Asset management plan for period 1 April 2013 to March 2023. www.wel.co.nz/Corporate-And-Community/Regulatory-Disclosuress/Asset-Management-Plans/

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Huazhuo Lin (Ling) .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2015 Springer International Publishing Switzerland

About this paper

Cite this paper

Lin (Ling), H., Oed, R. (2015). The Application of Works Programme Management. In: Tse, P., Mathew, J., Wong, K., Lam, R., Ko, C. (eds) Engineering Asset Management - Systems, Professional Practices and Certification. Lecture Notes in Mechanical Engineering. Springer, Cham. https://doi.org/10.1007/978-3-319-09507-3_31

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-09507-3_31

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-09506-6

  • Online ISBN: 978-3-319-09507-3

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics