Skip to main content

Abstract

We consider the open shop scheduling problem with uncertain durations modelled as fuzzy numbers. We define the concepts of necessary and possible β-robustness of schedules and set as our goal to maximise them. Additionally, we propose to assess solution robustness by means of Monte Carlo simulations. Experimental results using a genetic algorithm illustrate the proposals.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Pinedo, M.L.: Scheduling. Theory, Algorithms, and Systems, 3rd edn. Springer (2008)

    Google Scholar 

  2. Sha, D.Y., Cheng-Yu, H.: A new particle swarm optimization for the open shop scheduling problem. Computers & Operations Research 35, 3243–3261 (2008)

    Article  MATH  Google Scholar 

  3. Herroelen, W., Leus, R.: Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research 165, 289–306 (2005)

    Article  MATH  Google Scholar 

  4. Dubois, D., Fargier, H., Fortemps, P.: Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge. European Journal of Operational Research 147, 231–252 (2003)

    Article  MATH  MathSciNet  Google Scholar 

  5. Van de Vonder, S., Demeulemeester, E., Herroelen, W.: Proactive heuristic procedures for robust project scheduling: An experimental analysis. European Journal of Operational Research 189, 723–733 (2008)

    Article  MATH  Google Scholar 

  6. Aissi, H., Bazgan, C., Vanderpooten, D.: Min-max and min-max regret versions of combinatorial optimization problems: A survey. European Journal of Operational Research 197, 427–438 (2009)

    Article  MATH  MathSciNet  Google Scholar 

  7. Wang, J.: A fuzzy robust scheduling approach for product development projects. European Journal of Operational Research 152, 180–194 (2004)

    Article  MATH  MathSciNet  Google Scholar 

  8. Kasperski, A., Kule, M.: Choosing robust solutions in discrete optimization problems with fuzzy costs. Fuzzy Sets and Systems 160, 667–682 (2009)

    Article  MATH  MathSciNet  Google Scholar 

  9. Daniels, R.L., Carrillo, J.E.: β-robust scheduling for single-machine systems with uncertain processing times. IIE Transactions 29, 977–985 (1997)

    Google Scholar 

  10. Aiche, F., Abbas, M., Dubois, D.: Chance-constrained programming with fuzzy stochastic coefficients. Fuzzy Optimization and Decision Making 12, 125–152 (2013)

    Article  MathSciNet  Google Scholar 

  11. Fortemps, P.: Jobshop scheduling with imprecise durations: a fuzzy approach. IEEE Transactions of Fuzzy Systems 7, 557–569 (1997)

    Article  Google Scholar 

  12. Sakawa, M., Kubota, R.: Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms. European Journal of Operational Research 120, 393–407 (2000)

    Article  MATH  MathSciNet  Google Scholar 

  13. González Rodríguez, I., Puente, J., Vela, C.R., Varela, R.: Semantics of schedules for the fuzzy job shop problem. IEEE Transactions on Systems, Man and Cybernetics, Part A 38(3), 655–666 (2008)

    Article  Google Scholar 

  14. Puente, J., Vela, C.R., González-Rodríguez, I.: Fast local search for fuzzy job shop scheduling. In: Proc. of ECAI 2010, pp. 739–744. IOS Press (2010)

    Google Scholar 

  15. Alcaide, D., Rodriguez-Gonzalez, A., Sicilia, J.: A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures. International Journal of Flexible Manufacturing Systems 17, 201–226 (2006)

    Article  MATH  Google Scholar 

  16. González-Rodríguez, I., Palacios, J.J., Vela, C.R., Puente, J.: Heuristic local search for fuzzy open shop scheduling. In: Proc. FUZZ-IEEE 2010, pp. 1858–1865. IEEE (2010)

    Google Scholar 

  17. Noori-Darvish, S., Mahdavi, I., Mahdavi-Amiri, N.: A bi-objective possibilistic programming model for open shop scheduling problems with sequence-dependent setup times, fuzzy processing times, and fuzzy due-dates. Applied Soft Computing 12, 1399–1416 (2012)

    Article  Google Scholar 

  18. Palacios, J.J., González-Rodríguez, I., Vela, C.R., Puente, J.: Swarm lexicographic goal programming for fuzzy open shop scheduling. Journal of Intelligent Manufacturing (2013)

    Google Scholar 

  19. Palacios, J.J., Puente, J., Vela, C.R., González-Rodríguez, I.: A genetic algorithm for the open shop problem with uncertain durations. In: Mira, J., Ferrández, J.M., Álvarez, J.R., de la Paz, F., Toledo, F.J. (eds.) IWINAC 2009, Part I. LNCS, vol. 5601, pp. 255–264. Springer, Heidelberg (2009)

    Chapter  Google Scholar 

  20. Dubois, D., Prade, H.: Possibility Theory: An Approach to Computerized Processing of Uncertainty. Plenum Press, New York (1986)

    Google Scholar 

  21. Niu, Q., Jiao, B., Gu, X.: Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time. Applied Mathematics and Computation 205, 148–158 (2008)

    Article  MATH  MathSciNet  Google Scholar 

  22. Wu, C.W., Brown, K.N., Beck, J.C.: Scheduling with uncertain durations: Modeling β-robust scheduling with constraints. Computers & Operations Research 36, 2348–2356 (2009)

    Article  MATH  MathSciNet  Google Scholar 

  23. Dubois, D., Prade, H.: Fuzzy Sets and Systems: Theory and Applications. Academic Press, New York (1980)

    MATH  Google Scholar 

  24. Zadeh, L.A.: Fuzzy sets as a basis for a theory of possibility. Fuzzy Sets and Systems 1, 3–28 (1978)

    Article  MATH  MathSciNet  Google Scholar 

  25. Graham, R., Lawler, E., Lenstra, J., Rinnooy Kan, A.: Optimization and approximation in deterministic sequencing and scheduling: a survey. Annals of Discrete Mathematics 4, 287–326 (1979)

    Article  MathSciNet  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2014 Springer International Publishing Switzerland

About this paper

Cite this paper

Palacios, J.J., González-Rodríguez, I., Vela, C.R., Puente Peinador, J. (2014). β-Robust Solutions for the Fuzzy Open Shop Scheduling. In: Laurent, A., Strauss, O., Bouchon-Meunier, B., Yager, R.R. (eds) Information Processing and Management of Uncertainty in Knowledge-Based Systems. IPMU 2014. Communications in Computer and Information Science, vol 442. Springer, Cham. https://doi.org/10.1007/978-3-319-08795-5_46

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-08795-5_46

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-08794-8

  • Online ISBN: 978-3-319-08795-5

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics