Abstract
This chapter proposes a farm harvest scheduling to provide cane equity among growers while maximizing the total sugar yield over the entire mill area. A heuristic algorithm, called two-phase cane harvest scheduling (CANEHAS), was developed to solve a practical large-size problem. In Phase I, the CANEHAS algorithm was developed to maximize the total sugar yield. In Phase II, the growers’ equity, in terms of cane quality, was proposed. The solutions of both phases were improved using Tabu search. The mill could use the proposed algorithms, either Phase I or Phase II, to make decisions when providing the queue cards to the contracted grower groups in order to increase profitability.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Higgins AJ (1999) Optimising cane supply decisions within a sugar mill region. J Sched 2:229–244
Higgins A (2006) Scheduling of road vehicles in sugarcane transport: a case study at an Australian sugar mill. Eur J Res 170:987–1000
Higgins AJ, Muchow RC, Rudd AV, Ford AW (1998) Optimizing harvest date in sugar production: a case study for the Mossman mill region in Australia. Field Crops Res 57:153–162
Higgins A, Antony G, Sandell G, Davies I, Prestwidge D, Andrew B (2004) A framework for integrating a complex harvesting and transport system for sugar production. Agric Syst 82:99–115
Hildebrand C (2002) An independent assessment of the sugar industry. Report to the Hon Truss MP, Minister for Agriculture, Fisheries and Forestry, Australia
Kinney G, Barnes JW, Colletti B (2007) A reactive tabu search algorithm with variable clustering for the unicost set covering problem. Int J Oper Res 2(2):156–172
Le Gal P-Y, Lyne PWL, Meyer E, Soler L-G (2008) Impact of sugarcane supply scheduling on mill sugar production: a South African case study. Agric Syst 96:64–74
Lejars C, Gal P-YL, Auzoux S (2008) A decision support approach for cane supply management within a sugar mill area. Comput Electron Agricu 60(2):239–249
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2014 Springer International Publishing Switzerland
About this chapter
Cite this chapter
Sethanan, K., Theerakulpisut, S., Neungmatcha, W. (2014). Sugarcane Harvest Scheduling to Maximize Total Sugar Yield with Consideration of Equity in Quality Among the Growers. In: Golinska, P. (eds) Logistics Operations, Supply Chain Management and Sustainability. EcoProduction. Springer, Cham. https://doi.org/10.1007/978-3-319-07287-6_24
Download citation
DOI: https://doi.org/10.1007/978-3-319-07287-6_24
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-07286-9
Online ISBN: 978-3-319-07287-6
eBook Packages: Earth and Environmental ScienceEarth and Environmental Science (R0)