Skip to main content

Impact of Project Management Information Systems on Project Performance

  • Chapter
  • First Online:
Handbook on Project Management and Scheduling Vol. 2

Part of the book series: International Handbooks on Information Systems ((INFOSYS))

Abstract

Project management information systems (PMIS) usually acquired by organizations as software packages are meant to provide managers with the decision-making support needed in planning, organizing and controlling projects. However, the actual contribution of PMIS to project success or performance is still unknown. The purpose of this study is to empirically assess the quality of the PMIS presently used in organizations and to examine their impact on project managers and project performance, based on a PMIS success model. This model is composed of five constructs: the quality of the PMIS, the quality of the PMIS information output, the use of the PMIS, the individual impacts of the PMIS, and the impacts of the PMIS on project success. Analysis of questionnaire data obtained from 39 project managers confirms the significant contribution of PMIS to successful project management. Improvements in effectiveness and efficiency in managerial tasks were observed here in terms of better project planning, scheduling, monitoring, and control. Improvements were also observed in terms of timelier decision-making.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Notes

  1. 1.

    This chapter draws heavily on Raymond and Bergeron #x00A0;(2008).

References

  • Amami M, Beghini G (2000) Project management and communication of product development through electronic document management. Proj Manag J 31(2):6–19

    Google Scholar 

  • Amami M, Beghini G, La Manna M (1993) Use of project management information system for planning information systems development projects. Int J Proj Manag 11(1):21–28

    Article  Google Scholar 

  • Bergeron F (1986) Factors influencing the use of DP chargeback information. MIS Q 10(3):225–238

    Article  Google Scholar 

  • Bergeron F, Raymond L, Rivard S, Gara M-F (1995) Determinants of EIS use: testing a behavioral model. Decis Support Syst 14:131–146

    Article  Google Scholar 

  • Borchers C (2013) Clubby atmosphere vanishes as costs escalate in Belmont. The Boston Globe, May 21

    Google Scholar 

  • Brackett SW, Isbell A-M (1989) PMIS: an integrated approach for the management and distribution of project information. Proj Manag J 20(3):5–10

    Google Scholar 

  • Braglia M, Frosolini M (2013) An integrated approach to implement project management information systems within the extended enterprise. Int J Proj Manag. Available online 16 January. http://dx.doi.org/10.1016/j.ijproman.2012.12.003

  • Cleland DJ, King WR (1983) Systems analysis and project management. McGraw-Hill, New York

    Google Scholar 

  • CTV.ca News Staff (2006) Conservatives move to disarm long-run registry. June 19. http://www.ctv.ca

  • Davis FD, Bagozzi RP, Warshaw PR (1989) User acceptance of computer technology: a comparison of two theoretical models. Manag Sci 35(8):982–1003

    Article  Google Scholar 

  • DeLone WH, McLean ER (1992) Information systems success: the quest for the dependent variable. Inform Syst Res 3(1):60–95

    Article  Google Scholar 

  • DeLone WH, McLean ER (2003) The DeLone and McLean model of information systems success: a ten-year update. J Manag Inform Syst 19(4):9–30

    Google Scholar 

  • Etezadi-Amoli J, Farhoomand AF (1996) A structural model of end user computing satisfaction and user performance. Inform Manag 30(2):65–73

    Article  Google Scholar 

  • Fornell CR, Larcker DF (1981) Evaluating structural equation models: LISREL and PLS applied to consumer exit-voice theory. J Mark Res 18:39–50

    Article  Google Scholar 

  • Gefen D, Straub DW, Boudreau M-C (2000) Structural equation modeling and regression: guidelines for research practice. Commun AIS 4(7):1–76

    Google Scholar 

  • Herroelen W (2005) Project scheduling - theory and practice. Prod Oper Manag 14(4):413–432

    Article  Google Scholar 

  • Igbaria M, Tan M (1997) The consequences of information technology acceptance on subsequent individual performance. Inform Manag 32(3):113–121

    Article  Google Scholar 

  • Igbaria M, Iivari J, Maragahh H (1995) Why do individuals use computer technology? A Finnish case study. Inform Manag 29(5):227–238

    Article  Google Scholar 

  • Igbaria M, Zinatelli N, Cragg P, Cavaye A (1997) Personal computing acceptance factors on small firms: a structural equation model. MIS Q 21(3):279–302

    Article  Google Scholar 

  • Jaafari A (1996) Time and priority allocation scheduling technique for projects. Int J Proj Manag 14(5):289–299

    Article  Google Scholar 

  • Jaafari A, Manivong K (1998) Toward a smart project management information system. Int J Proj Manag 16(4):249–265

    Article  Google Scholar 

  • Jurison J (1996) The temporal nature of IS benefits: a longitudinal study. Inform Manag 30(2):75–79

    Article  Google Scholar 

  • Keil M, Im GP, Mähring M (2007) Reporting bad news on software projects: the effects of culturally constituted views of face-saving. Inform Syst J 17(1):59–87

    Article  Google Scholar 

  • Klassen RD, Jacobs J (2001) Experimental comparison of Web, electronic and mail survey technologies in operations management. J Oper Manag 19(6):713–728

    Article  Google Scholar 

  • Lalonde B, St-Pierre A (2000) Microsoft Project 2000: La gestion informatisée de projet. Editions Vermette, Montréal

    Google Scholar 

  • Larsen KRT (2003) A taxonomy of antecedents of information systems success: variable analysis studies. J Manag Inform Syst 20(2):169–246

    Google Scholar 

  • Lee Y, Kozar KA, Larsen KRT (2003) The technology acceptance model: past, present, and future. Commun AIS 12:752–780

    Google Scholar 

  • Liberatore MJ, Pollack-Johnson B (2003) Factors influencing the usage and selection of project management software. IEEE Trans Eng Manag 50(2):164–174

    Article  Google Scholar 

  • Light M, Rosser B, Hayward S (2005) Realizing the benefits of projects and portfolio management. Gartner, Research ID G00125673, pp 1–31 (January 5)

    Google Scholar 

  • Mahaney RC, Lederer AL (2010) The role of monitoring and shirking in information systems project management. Int J Proj Manag 28(1):14–25

    Article  Google Scholar 

  • Peters T, Waterman DL (1982) In search of excellence. Warners Books, New York

    Google Scholar 

  • Podsakoff PM, MacKenzie SB, Lee J-Y, Podsakoff NP (2003) Common method biases in behavioral research: a critical review of the literature and recommended remedies. J Appl Psychol 88(5):879–903

    Article  Google Scholar 

  • Rai A, Lang SS, Welker RB (2002) Assessing the validity of IS success models: an empirical test and theoretical analysis. Inform Syst Res 13(1):50–69

    Article  Google Scholar 

  • Raymond L (1987) Information systems design for project management: a data modeling approach. Proj Manag J 18(4):94–99

    Google Scholar 

  • Raymond L, Bergeron F (2008) Project management information systems: an empirical study of their impact on project managers and project success. Int J Proj Manag 26(2):213–220

    Article  Google Scholar 

  • Scotsman.com (2005) Athens counting cost of the Olympics. The Scotsman, August 4. http://news.scotsman.com/topics.cfm?tid=1137&id=1726242005

  • Seddon PB, Kiew M-Y (1994) A partial test and development of the DeLone and McLean model of IS success. In: Proceedings of the fifteenth international conference on information systems, Atlanta, pp 99–110

    Google Scholar 

  • Shenhar AJ, Levy O, Dvir D (1997) Mapping the dimensions of project success. Proj Manag J 28(2):5–13

    Google Scholar 

  • Taylor S, Todd P (1995) Understanding information technology usage: a test of competing models. Inform Syst Res 6(2):144–176

    Article  Google Scholar 

  • Teng J, Calhoun K (1996) Organizational computing as a facilitator of operational and managerial decision making: an exploratory study of managers’ perceptions. Decis Sci 27(4):673–710

    Article  Google Scholar 

  • Teo TSH, Wong PK (1998) An empirical study of the performance impact of computerization in the retail industry. Omega 26(5):611–621

    Article  Google Scholar 

  • Torkzadeh G, Doll WJ (1999) The development of a tool for measuring the perceived impact of information technology on work. Omega 27(3):327–339

    Article  Google Scholar 

  • Tse A (1998) Comparing the response rate, response speed and response quality of two methods of sending questionnaires: E-mail vs. mail. J Mark Res Soc 40(1):353–361

    Google Scholar 

  • van der Meijden MJ, Tange HJ, Troost J, Hasman A (2003) Determinants of success of inpatient clinical information systems: a literature review. J Am Med Inform Assn 10(3):235–243

    Article  Google Scholar 

  • Wang RY, Strong DM (1996) Beyond accuracy: what data quality means to data consumers. J Manag Inform Syst 12(4):5–34

    Google Scholar 

  • Weill P, Vitale M (1999) Assessing the health of an information system portfolio: an example from process engineering. MIS Q 23(4):601–624

    Article  Google Scholar 

  • White D, Fortune J (2002) Current practice in project management: an empirical study. Int J Proj Manag 20:1–11

    Article  Google Scholar 

  • Wikipedia (2007) Cost Overrun. http://en.wikipedia.org/wiki/Cost_Overrun. Accessed 23 Feb 2007

  • Winter M, Smith C, Morris P (2006) Directions for future research in project management: the main findings of a UK government-funded research network. Int J Proj Manag 24:638–649

    Article  Google Scholar 

  • Wixom BH, Watson HJ (2001) An empirical investigation of the factors affecting data warehousing success. MIS Q 25(1):17–41

    Article  Google Scholar 

  • Yuthas K, Young ST (1998) Material matters: assessing the effectiveness of materials management IS. Inform Manag 33(3):115–124

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Louis Raymond .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2015 Springer International Publishing Switzerland

About this chapter

Cite this chapter

Raymond, L., Bergeron, F. (2015). Impact of Project Management Information Systems on Project Performance. In: Schwindt, C., Zimmermann, J. (eds) Handbook on Project Management and Scheduling Vol. 2. International Handbooks on Information Systems. Springer, Cham. https://doi.org/10.1007/978-3-319-05915-0_30

Download citation

Publish with us

Policies and ethics