Abstract
This chapter fundamentally examines project performance during its execution period, however, risk must always be considered, especially at the very beginning of the project when the risk is normally maximum, and at each update. In the Project Monitoring stage, this chapter explores what happens with foreseen risks, that is, if they really happened or not and their consequences. In the Project Control stage, the chapter uses Earned Value Analysis and examines Performance Factors, which are used to predict completion regarding time and cost. However, because these calculations are based on past performance, there is always the risk that this performance will not be replicated in the future, and consequently, there is uncertainty about the completion time and cost. Risk Management can help in forecasting distribution of values by limiting this uncertainty, considering that it will probably follow a normal distribution probability curve and determine durations and cost values with a 95 % confidence, that is, assuming only a 5 % risk or whatever other value that stakeholders are willing to accept.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Notes
- 1.
Walter Shewhart developed these charts in the 1920s while working for Bell Laboratories.
References
Christensen, D., & Heise, S. (1993). Cost performance index stability. National Contract Management Journal, 25, 7–1.
DCMA. (2012). Earned Value Management System (EVMS) Program Analysis Pamphlet (PAP) DCMA-EA PAM 200.1 http://www.google.es/url?sa=t&rct=j&q=&esrc=s&frm=1&source=web&cd=1&ved=0CDIQFjAA&url=http%3A%2F%2Fwww.dcma.mil%2Fpolicy%2F200-1%2F&ei=sbkYUsO4PPDT7AaZpoCQBA&usg=AFQjCNFRu7OrEmNLMNQg_3bfzWi4DcGX0w&bvm=bv.51156542,d.d2k. Accessed 22 Aug 2013.
Hillson, D. (2004). Earned value management and risk management: A practical – synergy. In PMI 2004 Global Congress Proceedings, Anaheim, CA, USA.
Shewhart, W. (1913). Economic control of quality of manufactured product (p. 501). New York: D. Van Nostrand Company.
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 2014 Springer International Publishing Switzerland
About this chapter
Cite this chapter
Munier, N. (2014). Project During Execution – Strategy – Updating. In: Risk Management for Engineering Projects. Springer, Cham. https://doi.org/10.1007/978-3-319-05251-9_7
Download citation
DOI: https://doi.org/10.1007/978-3-319-05251-9_7
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-05250-2
Online ISBN: 978-3-319-05251-9
eBook Packages: EngineeringEngineering (R0)