Abstract
In this phase, the plans we prepared in the “Plan Grid Implementation” phase are executed, i.e., project strategies are implemented according to strategy plans and the measurement data are collected according to the measurement plans. Table 7.1 summarizes the objectives, inputs, basic activities, and outcomes of this phase.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Basili VR (1989) Software development: a paradigm for the future. In: Presentation at the thirteenth international computer software and applications conference, Los Alamitos, CA
Basili V, Zelkowitz M, McGarry F, Page J, Waligora S, Pajerski R (1995) Special report: SEL’s software process-improvement program. IEEE Software 12(6):83–87
Basili VR, Green S, Laitenberger O, Shull F, Sørumgård S, Zelkowitz MV (1996) The empirical investigation of perspective-based reading. Empir Software Eng 13(12):1278–1296
Chillarege R, Bhandari IS, Chaar JK, Halliday MJ, Moebus DS, Ray BK, Wong M-Y (1992) Orthogonal defect classification – a concept for in-process measurements. IEEE Trans Software Eng 18(11):943–956
CMMI Product Team (2010) CMMI for development, Version 1.3, Technical Report CMU/SEI-2010-TR-033. Software Engineering Institute, Carnegie Mellon University, Pittsburgh, PA
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 2014 Springer International Publishing Switzerland
About this chapter
Cite this chapter
Basili, V. et al. (2014). Phase 4: Execute Plans. In: Aligning Organizations Through Measurement. The Fraunhofer IESE Series on Software and Systems Engineering. Springer, Cham. https://doi.org/10.1007/978-3-319-05047-8_7
Download citation
DOI: https://doi.org/10.1007/978-3-319-05047-8_7
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-05046-1
Online ISBN: 978-3-319-05047-8
eBook Packages: Computer ScienceComputer Science (R0)