Skip to main content

A MILP Event Based Formulation for a Real-world Multimode RCSP with Generalized Temporal Constraints

  • Conference paper
  • First Online:

Part of the book series: Lecture Notes in Management and Industrial Engineering ((LNMIE))

Abstract

Scheduling is becoming much more important in every industry. However, the standard RCSP usually does not cover all the characteristics of real world problems. In this work, we present an Event Based MILP formulation for a Multimode Resource Constraint Scheduling Problem of direct application for some industries, as aeronautical assembly lines. Taking as a starting point one of the last MILP formulations for standard RCSP, our contribution is to provide a formulation which covers the multimode case and more general temporal constraints than the ones usually referred to in the literature.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD   169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

References

  1. Artigues C, Michelon P, Reusser S (2003) Insertion techniques for static and dynamic re-source-constrained project scheduling, Eur J Oper Res 149:249–267

    Google Scholar 

  2. Brucker P, Drexl A, Mhring R, Neumann K, Pesch E (1999) Resource-constrained project scheduling: Notation, classification, models and methods. Eur J Oper Res 112(1):3–11

    Google Scholar 

  3. APSP. https://www.dropbox.com/sh/9070da1dz6typ2o/V0jCAtR_8y

  4. Koné O, Artigues C, Lopez P, Mongeau M (2011) Event-based MILP models for resource-constrained project scheduling problems. Comput Oper Res 38(1):3–13

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Tamara Borreguero-Sanchidrián .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2014 Springer International Publishing Switzerland

About this paper

Cite this paper

Borreguero-Sanchidrián, T., García-Sánchez, Á., Ortega-Mier, M. (2014). A MILP Event Based Formulation for a Real-world Multimode RCSP with Generalized Temporal Constraints. In: Hernández, C., López-Paredes, A., Pérez-Ríos, J. (eds) Managing Complexity. Lecture Notes in Management and Industrial Engineering. Springer, Cham. https://doi.org/10.1007/978-3-319-04705-8_13

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-04705-8_13

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-04704-1

  • Online ISBN: 978-3-319-04705-8

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics