Abstract
In this chapter, we present a simulation study carried out to investigate the performance of priority policies in dynamic-stochastic environments.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Bibliography
Anderson, E. J., & Nyrenda, J. C. (1990). Two new rules to minimize tardiness in a job shop. International Journal of Production Research, 28(12), 2277–2292.
Ballestín, F. (2007). When it is worthwhile to work with the stochastic RCPSP? Journal of Scheduling, 10, 153–166.
Dumond, J., & Mabert, V. A. (1988). Evaluating project scheduling and due date assignment procedures: An experimental analysis. Management Science, 34(1), 101–118.
Graham, R. L. (1966). Bounds for certain multiprocessing anomalies. The Bell System Technical Journal, 45(9), 1563–1581.
Klimov, G. P. (1974). Time-sharing service systems I. Theory of Probability and its Applications, 19(3), 532–551.
Kolisch, R. (1996). Efficient priority rules for the resource-constrained project scheduling problem. Journal of Operations Management, 14, 179–102.
Kumar, P. R., & Seidman, T. I. (1990). Dynamic instabilities and stabilization methods in distributed real-time scheduling of manufacturing systems. IEEE Transactions on Automatic Control, 35(3), 289–298.
Kurtulus, I. S., & Narula, S. C. (1985). Multi-project scheduling: Analysis of project performance. IIE Transactions, 17(1), 58–66.
Kutanoglu, E., & Sabuncuoglu, I. (1999). An analysis of heuristics in a dynamic job shop with weighted tardiness objectives. International Journal of Production Research, 37(1), 165–187.
Law, A. (2007). Simulation modeling and analysis (4th ed.). Boston: McGraw-Hill.
Lawrence, S. R., & Morton, T. E. (1993). Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics. European Journal of Operational Research, 64, 168–187.
Meyn, S. (2008). Control techniques for complex networks. Cambridge: Cambridge University Press.
Möhring, R. H., Radermacher, F. J., & Weiss, G. (1984). Stochastic scheduling problems I. Zeitschrift für Operations Research, 28, 193–260.
Morton, T. E., & Pentico, D. W. (1993). Heuristic scheduling systems (Wiley series in engineering & technology management). New York: Wiley.
Nino-Mora, J. (2005). Stochastic scheduling. In P. M. Pardalos (Ed.), Encyclopedia of optimization (Vol. V, pp. 367–372). Dordrecht: Kluwer Academic.
Pinedo, M. L. (2008). Scheduling-theory, algorithms, and systems (3rd ed.). New York: Springer.
Ramasesh, R. (1990). Dynamic job shop scheduling: A survey of simulation research. OMEGA International Journal of Operations and Production Management, 18(1), 43–57.
Schwindt, C. (1998). Generation of resource-constrained project scheduling problems subject to temporal constraints. Technical report WIOR-543, Universitaet Karlsruhe.
Stork, F. (2001). Stochastic resource-constrained project scheduling. PhD thesis, Technische Universität Berlin.
Tsai, D. M., & Chiu, H. N. (1996). Two heuristics for scheduling multiple projects with resource constraints. Construction Management and Economics, 14, 325–340.
Vepsalainen, A. P. J., & Morton, T. E. (1987). Priority rules for job shops with weighted tardiness costs. Management Science, 33(8), 1035–1047.
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 2015 Springer International Publishing Switzerland
About this chapter
Cite this chapter
Melchiors, P. (2015). Scheduling Using Priority Policies. In: Dynamic and Stochastic Multi-Project Planning. Lecture Notes in Economics and Mathematical Systems, vol 673. Springer, Cham. https://doi.org/10.1007/978-3-319-04540-5_6
Download citation
DOI: https://doi.org/10.1007/978-3-319-04540-5_6
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-04539-9
Online ISBN: 978-3-319-04540-5
eBook Packages: Business and EconomicsBusiness and Management (R0)