Abstract
In this book the influence of a customer required lead time distribution on the optimal capacity investment and the optimal work release rule parameterization is evaluated either including backorder costs or considering a service level constraint. A set of equations for the logistical key figures FGI, FGI lead time, backorders, tardiness, and service level has been developed in integral form based on the production lead time distribution when a planned lead time or WAW work release rule is applied and customers request random due dates. These equations can be used in real production systems to identify the influence of the customer required lead time distribution on the above mentioned logistical key figures. Additionally, explicit equations for these logistical key figures have been derived for a set of different production systems. The main findings are stated in this conclusion.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 2014 Springer International Publishing Switzerland
About this chapter
Cite this chapter
Altendorfer, K. (2014). Conclusion. In: Capacity and Inventory Planning for Make-to-Order Production Systems. Lecture Notes in Economics and Mathematical Systems, vol 671. Springer, Cham. https://doi.org/10.1007/978-3-319-00843-1_7
Download citation
DOI: https://doi.org/10.1007/978-3-319-00843-1_7
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-00842-4
Online ISBN: 978-3-319-00843-1
eBook Packages: Business and EconomicsBusiness and Management (R0)