Skip to main content

Exploring Information and Communications Technology for Enhanced Communication in Non-traditional Procurement

  • Chapter
  • First Online:
Effective Construction Project Delivery

Abstract

In today’s digitalization era, the global construction industry has witnessed a naissance Information Communication Technology (ICT) tools and platforms for which have had significant impact on the way project teams and organizations interact as well as having impact on storing, processing, retrieving, disseminating and sharing of information. The information-intensive nature of construction project delivery process requires real-time access and flow of information between all the project team members. Given the present scenario, when project participants are geographically separated and with increased virtuality, adoption of ICT that enables effective communication is critical. However, despite the wave of enthusiasm for many ICT tools such as intranet, Internet, extranet, project Website, BIM, Internet of things, augmented and virtual reality as a platform for information sharing and interactions, among project teams, issues of their performance and information-sharing behaviours across various procurement typologies are yet to be explored as a strategic tool towards effective communication. In the current state of the industry, there is also growing recognition of the need to understand the ICT needs of the individuals and how they use these tools to communicate within project teams to engender effective communication. Additionally, project team participants come from different organizations and perform varied roles using varieties of information systems and tools, having different rates of adoption of the available communication tools as well as preferences for specific means of communication and information sharing. In the current digitalization era, the effectiveness of the project team information sharing and interactions is dependent on clear understanding of the performance of specific ICT communication media and tools adopted across various procurement typologies and their information-sharing behaviours. This chapter explores the evolution of ICT tools and platforms for information sharing and interaction in construction project delivery in non-traditional procurement models. This knowledge will enable the strategic adoption of ICT tools for information sharing and interactions among project teams in construction project delivery. By this strategic drive, the use of these ICT tools can aid in improving collaborative working and integration of project participants which is proving to be elusive in practice especially in conventional procurement models.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Ahmed, S., Hossain, M. M., & Hoque, M. I. (2017). A brief discussion on augmented reality and virtual reality in construction industry. Journal of System and Management Sciences, 7(3), 1–33.

    Google Scholar 

  • Ahuja, V., Yang, J., & Shankar, R. (2009). Benefits of collaborative ICT adoption for building project management. Construction Innovation: Information, Process, Management, 9(3), 323–340.

    Article  Google Scholar 

  • Ahuja, V., Yang, J., & Shankar, R. (2010). IT-enhanced communication protocols for building project management. Engineering, Construction and Architectural Management, 17(2), 159–179.

    Article  Google Scholar 

  • Akponeware, A. O., & Adamu, Z. A. (2017). Clash detection or clash avoidance? An investigation into coordination problems in 3D BIM. Buildings, 7(3), 1–28.

    Google Scholar 

  • Allbeck, J. M., & Badler, N. I. (2001). Consistent communication with control. Workshop on Non-verbal and Verbal Communicative Acts to Achieve Contextual Embodied Agents in Autonomous Agents, 2001.

    Google Scholar 

  • Alshawi, M., Goulding, J., Khosrowshahi, F., Lou, E., & Underwood, J. (2009). How strategic is IT investment in the construction industry? (pp. 1–3). A UK Perspective, Modern Built Environment—Knowledge Transfer Networks, Intelligent Buildings Index, January.

    Google Scholar 

  • Arayici, Y., Egbu, C. O., & Coates, P. (2012). Building information modelling (BIM) implementation and remote construction projects: Issues, challenges, and critiques. Journal of Information Technology in Construction, 17, 75–92.

    Google Scholar 

  • Argyle, M. (1975). Bodily communication. New York: International Universities Press Inc.

    Google Scholar 

  • Baldwin, A. N., Thorpe, A., & Carter, C. (1996). The construction alliance and electronic information exchange: A symbiotic relationship. CIB-65, Strathclyde University, Glasgow, UK.

    Google Scholar 

  • Basu, A. (1996). Impact of information technology on construction project management. American Association of Cost Engineers Transactions, IT4.

    Google Scholar 

  • Benford, S., Bowers, J., Fahlen, L. E., Greenhalgh, C., & Snowdown, D. (1997). Embodiments, avatars, clones and agents for multi-user, multi-sensory virtual worlds. Multimedia Systems, 5(2), 93–104.

    Article  Google Scholar 

  • Becerik-Gerber, A. A., Burcin, B., Ku, K., & Jazizadeh, F. (2012). BIM-enabled virtual and collaborative construction engineering and management. Journal of Professional Issues in Engineering Education and Practice, 138, 234–245.

    Article  Google Scholar 

  • Bouchlaghem, D., Shang, H., Anumba, C. J., Cen, M., Miles, J., & Taylor, M. (2005a). ICT-enabled collaborative working environment for concurrent conceptual design. Architectural Engineering and Design Management, 1(4), 261–280.

    Article  Google Scholar 

  • Bouchlaghem, D., Shang, H., Whyte, J., & Ganah, A. (2005b). Visualisation in architecture, engineering and construction (AEC). Automation in Construction, 14(3), 287–295.

    Article  Google Scholar 

  • Bråthen, K., & Moun, A. (2016). Bridging the gap: Bringing BIM to construction workers. Engineering, Construction and Architectural Management, 23(6), 751–764.

    Article  Google Scholar 

  • Brynjolfsson, E. (1993). The productivity paradox of information technology: Review and assessment. Communications of the ACM, 36, 66–78.

    Article  Google Scholar 

  • Brynjolfsson, E., & Hitt, L. M. (1998). Beyond the productivity paradox, computers are the catalyst for bigger changes. Communications of the ACM, 41(8), 49–55.

    Article  Google Scholar 

  • Cao, D., Li, H., Wang, G., Luo, X., Yang, X., & Tan, D. (2017). Dynamics of project-based collaborative networks for BIM implementation analysis based on stochastic actor-oriented models. Journal of Management and Engineering, 33, 04016055.

    Google Scholar 

  • Cassell, J. (2000). Embodied conversational interface agents. Communications of the ACM, 43(4), 70–78; Ahuja, V., Yang, J., & Shankar, R. (2009). Study of ICT adoption for building project management in the Indian construction industry. Automation in Construction, 18, 415–423.

    Google Scholar 

  • Chen, C.-H., Yang, J.-C., Shen, S., & Jeng, M.-C. (2007). A desktop virtual reality earth motion system in astronomy education. Educational Technology & Society, 10, 289–304.

    Google Scholar 

  • Chen, F., Zhang, L., & Latimer, J. (2014). An exploratory study of social loafing in asynchronous virtual collaboration. International Journal of Information and Decision Sciences, 6(2), 153–165.

    Article  Google Scholar 

  • Chen, H., & Tien, H. C. (2007). Application of peer-to-peer network for real-time online collaborative computer aided design. Journal of Computing in Civil Engineering, 21(2), 112–121.

    Article  Google Scholar 

  • Chen, K., Lu, W., Peng, Y., Rowlinson, S., & Huang, G. Q. (2015). Bridging BIM and building: From a literature review to an integrated conceptual framework. International Journal of Project Management, 33(6), 1405–1416.

    Article  Google Scholar 

  • Chen, Y.-C., Chi, H.-L., Hung, W.-H., & Kang, S.-C. (2011). Use of tangible and augmented reality models in engineering graphics courses. Journal of Professional Issues in Engineering Education and Practice, 137, 267–276.

    Google Scholar 

  • Cheng, L., Wang, Y., Hou, Z-G., Tan, M., & Cao, Z. (2013). Sampled-data based average consensus of second-order integral multi-agent systems: Switching topologies and communication noises. Automatica, 49(5), 1458–1464.

    Google Scholar 

  • Choi, S. Y., Kang, Y. S., & Lee, H. (2008). The effects of socio-technical enablers on knowledge sharing: An exploratory examination. Journal of Information Science, 34(5), 742–754.

    Article  Google Scholar 

  • Dawood, N., Akinsola, A., & Hobbs, B. (2002). Development of automated communication of system for managing site information using internet technology. Automation in Construction, 11(3), 552–572.

    Google Scholar 

  • Deep, S., Gajendran, T., & Jefferies, M. (2019). A systematic review of ‘enablers of collaboration’ among the participants in construction projects. International Journal of Construction Management, 1–13. https://doi.org/10.1080/15623599.2019.1596624.

  • Dehning, B., Dow, K. E., & Stratopoulos, T. (2004). Information technology and organizational slack. International Journal of Accounting Information Systems, 5, 51–63.

    Article  Google Scholar 

  • Diallo, A., & Thuillier, D. (2005). The success of international development projects: Trust and communication: An African perspective. International Journal of Project Management, 3(3), 237–252.

    Google Scholar 

  • Duan, G., & Zhou, L. (2006). Study on product collaborative design system based on TeamCenter. WSEAS Transactions on Computers, 5(6), 1383–1388.

    Google Scholar 

  • Duke, A., & Anumba, C. J. (1997). Enabling collaboration for virtual construction project teams. In C. J. Anumba & N. F. O. Evbuomwan (Eds.), Concurrent engineering in construction (pp. 163–172). London: Institution of Structural Engineers.

    Google Scholar 

  • Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2008). BIM handbook: A guide to building information modeling for owners, managers designers, engineers, and contractors. Hoboken, NJ: Wiley.

    Book  Google Scholar 

  • Eastman, C. M., Teicholz, P., Sacks, R., & Liston, K. (2011). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers, and contractors. New York, NY: Wiley.

    Google Scholar 

  • Egbu, C. O., & Robinson, H. S. (2005). Construction as a knowledge-based industry. In C. Anumba, C. Egbu, & P. Carillo (Eds.), Knowledge management construction (pp. 31–49). Oxford: Blackwell Publishing.

    Chapter  Google Scholar 

  • El-Ghandour, W., & Al-Hussein, M. (2004). Survey of information technology applications in construction. Construction Innovation, 3, 83–98.

    Article  Google Scholar 

  • Ellis, C., & Wainer, J. (1994). A conceptual model of groupware. In R. Furutha & C. Neuwith (Eds.), Proceedings of the ACM 1994 Conference on Computer Supported Cooperative Work (pp. 79–88), Chapel Hill, October 22–26. ACM.

    Google Scholar 

  • El-Saboni, M., Aouad, G., & Sabouni, A. (2009). Electronic communication systems effects on the success of construction projects in United Arab Emirates. Advanced Engineering Informatics, 23(1), 130–138.

    Google Scholar 

  • Emmitt, S., & Gorse, C. A. (2007). Communication in construction teams. London: Taylor & Francis.

    Google Scholar 

  • Garcia, J. R. G., & Sayogo, D. S. (2016). Government inter-organizational information sharing initiatives: Understanding the main determinants of success. Government Information Quarterly, 33(3), 572–582.

    Article  Google Scholar 

  • Golparvar-Fard, M., Peña-Mora, F., & Savarese, S. (2009). D4AR–a 4-dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication. Journal of Information Technology in Construction, 14(13), 129–153.

    Google Scholar 

  • Gorse, C. A., & Emmitt, S. (2007). Communication behaviour during management and design team meetings: A comparison of group interaction. Construction Management and Economics, 25, 1197–1213.

    Article  Google Scholar 

  • Graham, I., Spinardi, G., & Williams, R. (1996). Diversity in the emergence of electronic commerce. Journal of Information Technology, 11, 161–172.

    Article  Google Scholar 

  • Hardin, B., & Mccool, D. (2015). BIM and construction management proven tools, methods and workflows (2nd ed.). India: Wiley.

    Google Scholar 

  • Ho, S. P., Tserng, H. P., & Jan, S. H. (2013). Enhancing knowledge sharing management using BIM technology in construction. The Scientific World Journal, 2013, 1–10.

    Article  Google Scholar 

  • Hosseini, M. R., Chileshe, N., Baroudi, B., Zuo, J., & Mills, A. (2016). Factors affecting perceived level of virtuality in hybrid construction project teams (HCPTs): A qualitative study. Construction Innovation, 16(4), 460–482.

    Google Scholar 

  • Hosseini, M. R., Chileshe, N., Baroudi, B., Izadpanahi, P., & Zou, J. (2017). Virtuality of hybrid design teams within the construction context: A conceptual model. International Journal of Project Organisation and Management, 9(1), 1–17.

    Article  Google Scholar 

  • Hosseini, M. R., Chileshe, N., Zou, J., & Baroudi, B. (2012). Approaches for implementing ICT technologies within construction industry. Australasian Journal of Construction Economics and Building: The Conference Series, 1(2), 1–12.

    Article  Google Scholar 

  • Huysman, M. H., & de Wit, D. H. (2002). Knowledge sharing in practice. Dordrecht: Kluwer Academic Publisher.

    Book  Google Scholar 

  • Ibrahim, C. K. I. C., Sabri, N. A. M., Belayutham, S., & Mahamadu, A. (2019). Exploring behavioural factors for information sharing in BIM projects in the Malaysian construction industry. Built Environment Project and Asset Management, 9(1), 15–28.

    Google Scholar 

  • Ingason, H. T., & Jónasson, H. I. (2009). Contemporary knowledge and skill requirements in project management. Project Management Journal, 40(2), 59–69.

    Article  Google Scholar 

  • Jablin, F. M., & Sias, P. M. (2001). Communication competence. In F. M. Jablin & L. L. Putnam (Eds.), The new handbook of organizational communication: Advances in theory, research, and methods (pp. 819–864). Thousand Oaks, CA: Sage.

    Chapter  Google Scholar 

  • Javernick-Will, A. (2012). Motivating knowledge sharing in engineering and construction organisations: Power of social motivations. Journal of Management in Engineering, 28(2), 193–202.

    Article  Google Scholar 

  • Jensen, P. A., & Jóhannesson, E. I. (2013). Building information modelling in Denmark and Iceland. Engineering, Construction and Architectural Management, 20(1), 99–110.

    Article  Google Scholar 

  • Kim, S.-Y. (2009). Modelling and analysis of a web-based collaborative information system—Petri net-based collaborative enterprise. International Journal of Information and Decision Sciences, 1(3), 238–264.

    Article  Google Scholar 

  • Latiffi, A. A., Brahim, J., & Fathi, M. S. (2017). Building information modelling (BIM) after ten years: Malaysian construction players’ perception of BIM. In 2nd International Conference on Materials Science, Energy Technology and Environmental Engineering (MSETEE 2017), Zhuhai, April 28–30.

    Google Scholar 

  • Laurel, B. (1993). Computers as theatre. Addison-Wesley Publishing Company, Inc.

    Google Scholar 

  • Leidner, D. (2010). Globalization, culture and information: Towards global knowledge transparency. Journal of Strategic Information Systems, 19(1), 69–77.

    Article  Google Scholar 

  • Lin, K. Y., Son, J. W., & Rojas, E. M. (2011). A pilot study of a 3D game environment for construction safety education. Journal of Information Technology in Construction (ITcon), 16(5), 69–84.

    Google Scholar 

  • Liu, Y. (2009). Critical factors for managing project team communication at the construction stage (Ph.D. thesis). Submitted to the Polytechnic University of Hong Kong.

    Google Scholar 

  • Liu, Y., van Nederveen, S., & Hertogh, M. (2017). Understanding effects of BIM on collaborative design and construction: An empirical study in China. International Journal of Project Management, 35(4), 686–698.

    Article  Google Scholar 

  • Lou, M. M., Liew, P. S., Gu, N., & Ding, L. (2005). An agent approach to supporting collaborative design in 3D virtual worlds. Automation in Construction, 14(2), 189–195.

    Article  Google Scholar 

  • Love, P. E. D., Irani, Z., & Edwards, D. J. (2004). Industry-centric benchmarking of information technology benefits, costs and risks for small-to-medium sized enterprises in construction. Automation in Construction, 13(4), 507–524.

    Article  Google Scholar 

  • Love, P. E. D., Irani, Z., Li, H., & Cheng, E. (2001). An empirical analysis of IT/IS evaluation in construction. Journal of Construction Information Technology, 8(1), 15–27.

    Google Scholar 

  • Mahamadu, A. M., Mahdjoubi, L., & Booth, C. A. (2013). Challenges to digital collaborative exchange for sustainable project delivery through building information modeling technologies. WIT Transactions on Ecology and The Environment, 179(1), 547–557.

    Article  Google Scholar 

  • Manninen, T. (2000). Interaction in networked virtual environments as communicative action—Social theory and multi-player games. In Proceedings of CRIWG Conference (pp. 154–157), Madeira, Portugal. IEEE Press.

    Google Scholar 

  • Manninen, T. (2001). Rich interaction in the context of networked virtual environments—Experiences gained from the multi-player games domain. In Proceedings of IHM-HCI (pp. 383–398), Lille, France. Berlin: Springer.

    Google Scholar 

  • Manninen, T. (2002). Interaction forms in multiplayer desktop virtual reality games. In S. Richir, P. Richard, & B. Taravel (Eds.), Proceedings of VRIC2002 Conference, 19–21 June, ISTIA Innovation (pp. 223–232).

    Google Scholar 

  • Manninen, T. (2003). Conceptual, communicative and pragmatic aspects of interaction forms—Rich interaction model for collaborative virtual environments. In Proceedings of Computer Animation and Social Agents (CASA) Conference (pp. 168–174). IEEE Computer Society Press.

    Google Scholar 

  • Marshall-Ponting, A. J., & Aouad, G. (2005). An nD modelling approach to improve communication process for construction. Automation in Construction, 14(3), 311–321.

    Article  Google Scholar 

  • Martinsons, M. G., & Martinsons, V. (2002). Rethinking the value of IT, again. Communications of the ACM, 45, 25–26.

    Article  Google Scholar 

  • Mead, S. P. (1997). Project specific intranets for construction project teams. Project Management Journal, 28(3), 44–51.

    Google Scholar 

  • Mead, S. T. (1999). Communication effectiveness in intranet based construction projects (Unpublished Ph.D. thesis). Department of Civil and Building Engineering, Loughborough, University, Loughborough, UK.

    Google Scholar 

  • Merschbrock, C., & Nordahl-Rolfsen, C. (2016). BIM technology acceptance among reinforcement workers—The case of Oslo airport’s terminal 2. Journal of Information Technology in Construction, 21, 1–12.

    Google Scholar 

  • Miettinen, R., & Paavola, S. (2014). Beyond the BIM utopia: Approaches to the development and implementation of building information modeling. Automation in Construction, 43, 84–91.

    Article  Google Scholar 

  • Mitchell, W. (1993). Don’t wait for the data information super highway. Construction Business Review, 50–53.

    Google Scholar 

  • Navendren, D., Manu, P., Mahamadu, A. M., Shelburn, M., & Wildin, K. (2014). Briefing: Towards exploring profession specific BIM challenges in the UK. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(4), 163–166.

    Google Scholar 

  • Nitithamyong, P., & Skibniewski, M. J. (2004). Web-based construction project management systems: How to make them successful? Automation in Construction, 13(4), 491–506.

    Article  Google Scholar 

  • Nitithamyong, P., & Skibniewski, M. J. (2011). Success factors for the implementation of web-based construction project management systems. Construction Innovation, 11(1), 14–42.

    Article  Google Scholar 

  • O’Brien, M., & AI-Soufi, A. (1994). A survey of data communications in the construction industry. Construction Management and Economics, 12(5), 457–465.

    Google Scholar 

  • Ochieng, E. G., & Price, A. D. (2009). Framework for managing multicultural project teams. Engineering, Construction and Architectural Management, 16(6), 527–543.

    Article  Google Scholar 

  • Otter, A., & Emmitt, S. (2007). Exploring effectiveness of team communication balancing synchronous and asynchronous communication in design teams. Engineering, Construction and Architectural Management, 14(5), 408–419.

    Article  Google Scholar 

  • Otter, A. F. H. J. (2005). Design team communication using a project website (Ph.D. thesis). Bouwstenen 98, Technische Universiteit Eindhoven, Eindhoven.

    Google Scholar 

  • Park, C. S., Le, Q. T., Pedro, A., & Lim, C. R. (2015). Interactive building anatomy modeling for experiential building construction education. Journal of Professional Issues in Engineering Education and Practice, 142, 04015019.

    Article  Google Scholar 

  • Peansupap, V., & Walker, D. (2005). Factors affecting ICT diffusion: A case study of three large Australian construction contractors. Engineering, Construction and Architectural Management, 12(1), 21–37.

    Article  Google Scholar 

  • Perry, M., & Sanderson, D. (1998). Coordinating joint design work: The role of communication and artefacts. Design Studies, 19(3), 273–288.

    Article  Google Scholar 

  • Pittard, S., & Sell, P. (2016). BIM and quantity surveying. Abingdon: Routledge.

    Google Scholar 

  • Rad, A. A., Ehsan Asnaashari, E., Knight, A., & Hurst, A. (2010). ICT utilization in administrative tasks in Iranian construction organizations. In C. Egbu (Ed.), Proceedings 26th Annual ARCOM Conference (pp. 615–624), September 6–8, 2010, Leeds, UK. Association of Researchers in Construction Management.

    Google Scholar 

  • Redmond, A., Hore, A., Alshawi, M., & West, R. (2012). Exploring how information exchanges can be enhanced through Cloud BIM. Automation in Construction, 24, 175–183.

    Google Scholar 

  • Robertson, T. (1997). Cooperative work and lived cognition: A taxonomy of embodied actions. In European Conference on Computer Supported Cooperative Work (pp. 205–220).

    Google Scholar 

  • Rogers, J., Chong, H.-Y., & Preece, C. (2015). Adoption of building information modelling technology (BIM). Engineering, Construction and Architectural Management, 22(4), 424–445.

    Google Scholar 

  • Rojas, E. M., & Songer, A. D. (1999). Web-centric systems: A new paradigm for collaboration engineering. Journal of Management and Engineering, 15(1), 39–45.

    Google Scholar 

  • Root, D., & Thorpe, T. (2001). Refocusing collaboration technologies in construction supply chain: Looking beyond the organization. In Proceedings of ARCOM, Seventeenth Annual Conference (Vol. 1, pp. 253–262), University of Salford.

    Google Scholar 

  • Sacks, R., Radosavljevic, M., & Barak, R. (2010). Requirements for building information modeling based lean production management systems for construction. Automation in Construction, 19(5), 641–655.

    Article  Google Scholar 

  • Sampaio, A. Z. (2018). Introduction of BIM methodology in education: Concept and application. In 4th International Conference on Higher Education Advances (HEAD’18) (pp. 19–27), Editorial Universitat Politècnica de València.

    Google Scholar 

  • Shen, L. Y. (1992). Information management in construction companies. Hong Kong: Hong Kong Polytechnic University, Department of Building and Surveying.

    Google Scholar 

  • Singh, V., Gu, N., & Wang, X. (2011). A theoretical framework of a BIM-based multi-disciplinary collaboration platform. Automation in Construction, 20, 134–144.

    Article  Google Scholar 

  • Skibniewski, M. J., & Zavadskas, E. K. (2013). Technology development in construction: A continuum from distant past into the future. Journal of Civil Engineering and Management, 19(1), 136–147.

    Article  Google Scholar 

  • Stanney, K. M., & Hale, K. S. (2014). Handbook of virtual environments: Design, implementation, and applications. Boca Raton, FL, USA: CRC Press.

    Google Scholar 

  • Strahorn, S., Brewer, G., & Gajendran, T. (2017). The influence of trust on project management practice within the construction industry. Construction Economics and Building, 17(1), 1–19.

    Article  Google Scholar 

  • Sutton, M. J. D. (1996). Document management for the enterprise. Chichester: Wiley.

    Google Scholar 

  • Thalmann, D. (2001). The role of virtual humans in virtual environment technology and interfaces. In R. Earnshaw, R. Guejd, A. van Dam, & J. Vince (Eds.), Frontiers of human-centred computing, online communities and virtual environments (pp. 27–38). London: Springer.

    Chapter  Google Scholar 

  • Thorpe, T., Edum-Fotwe, F. T., & Mead, S. P. (1998). Managing construction projects within emerging information driven business environments. International Council for Building and Construction, Working Group W78, Stockholm.

    Google Scholar 

  • Thorpe, T., & Mead, S. (2001). Project-specific websites: Friend or foe? Journal of Construction Engineering and Management, 125(5), 406–413.

    Article  Google Scholar 

  • Trautsch, B. R. (2003). Managing virtual project teams (MBA thesis). https://userwww.sfsu.edu/ceb/b895/btrautsch895.pdf. Accessed: June 21, 2019.

  • Trigunarsyah, B. (2017). Organizational culture influence on client involvement. Engineering, Construction and Architectural Management, 24(6), 1155–1169.

    Article  Google Scholar 

  • Vanier, D., & Turk, Z. (1995). Internet opportunities for distributed construction information. International Council for Building and Construction, Working Group W78, Information Technology in Construction. World Wide Web. https://delphLkstr.lth.se:80/w78/html.

  • Vetter, R. J., Spell, C., & Ward, C. (1994). Mosaic and the world wide web. Computing Practices, 49–57.

    Google Scholar 

  • Vilhjálmsson, H. H., & Cassell, J. (1998). BodyChat: Autonomous communicative behaviors in avatars. In Second International Conference on Autonomous Agents (pp. 269–276), Minneapolis, MN, US.

    Google Scholar 

  • Wang, D., Fu, H., & Fang, S. (2019). The efficacy of trust for the governance of uncertainty and opportunism in megaprojects: The moderating role of contractual control. Engineering, Construction and Architectural Management. https://doi.org/10.1108/ECAM-09-2018-0409.

  • Wang, X., & Love., P. E. D. (2012). BIM + AR: Onsite information sharing and communication via advanced visualization. In Proceedings of the 2012 IEEE 16th International Conference on Computer Supported Cooperative Work in Design (pp. 850–855). IEEE.

    Google Scholar 

  • Wang, X., Truijens, M., Hou, L., Wang, Y., & Zhou, Y. (2014). Integrating augmented reality with building information modeling: Onsite construction process controlling for liquefied natural gas industry. Automation in Construction, 40, 96–105.

    Article  Google Scholar 

  • Wei, C., The, P., & Asmawi, A. (2012). Knowledge sharing practices. Journal of Knowledge Management Practice, 1(3), 111–123.

    Google Scholar 

  • Whyte, A., & Donaldson, J. (2015). Digital model data distribution in civil engineering contracts. Built Environment Project and Asset Management, 5(3), 248–260.

    Article  Google Scholar 

  • Wickramasinghe, V., & Widyaratne, R. (2012). Effects of interpersonal trust, team leader support, rewards, and knowledge sharing mechanisms on knowledge sharing in project teams. VINE, 42(2), 214–236.

    Article  Google Scholar 

  • Wikforss, Ö., & Alexander, L. (2007). Rethinking communication in construction. Journal of Information Technology in Construction, 12, 337–346.

    Google Scholar 

  • Wilson, P. (1991). Computer supported cooperative work, an introduction to intellect. New York: Oxford University Press.

    Google Scholar 

  • Wong, A. K. D., & Zhang, R. (2013). Implementation of web-based construction project management system in China projects by Hong Kong developers. Construction Innovation, 13(1), 26–49.

    Article  Google Scholar 

  • Xie, C., Schimpf, C., Chao, J., Nourian, S., & Massicotte, J. (2018). Learning and teaching engineering design through modeling and simulation on a CAD platform. Computer Applications in Engineering Education, 26(4), 824–840.

    Article  Google Scholar 

  • Xie, X. (2002). Communications in construction design (Ph.D. thesis). Loughborough University, Loughborough.

    Google Scholar 

  • Xie, C., Wu, D., Luo, J., & Hu, X. (2010). A case study of multi-team communications in construction design under supply chain partnering.Supply Chain Management: An International Journal, 15(5), 363–370.

    Google Scholar 

  • Xue, X., Shen, Q., & Ren, Z. (2010). Critical review of collaborative working in construction projects: Business environment and human behaviors. Journal of Management in Engineering, 26(4), 196–208.

    Article  Google Scholar 

  • Yang, J., Ahuja, V., & Shankar, R. (2007). Managing building projects through enchanted communication—An ICT based strategy for small and medium enterprises (pp. 2344–2357). Paper presented at the CIB World Building Congress, Cape Town, South Africa, May, 2007.

    Google Scholar 

  • Zhang, J., Wu, W., & Li, H. (2018). Enhancing building information modeling competency among civil engineering and management students with team-based learning. Journal of Professional Issues in Engineering Education and Practice, 144(2), 05018001.

    Article  Google Scholar 

  • Zhang, P., & Ng, F. F. (2012). Attitude toward knowledge sharing in construction teams. Industrial Management & Data Systems, 112(9), 1326–1347.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Titus Ebenezer Kwofie .

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Switzerland AG

About this chapter

Check for updates. Verify currency and authenticity via CrossMark

Cite this chapter

Kwofie, T.E., Aigbavboa, C., Thwala, W. (2020). Exploring Information and Communications Technology for Enhanced Communication in Non-traditional Procurement. In: Effective Construction Project Delivery. Springer, Cham. https://doi.org/10.1007/978-3-030-49374-5_11

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-49374-5_11

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-49373-8

  • Online ISBN: 978-3-030-49374-5

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics