Abstract
The success of any project lies in a great manner on keeping costs in the estimated values, as well as meeting customer required due date. Therefore, there is a current need of developing an information system that facilitates the creation and managing of projects and their processes, including costing schemes, as well as monitoring an optimizing project’s makespan. In order to address this situation a user-friendly information system (IS) was developed. This IS includes an optimization module that reduces the project’s execution time, thus, minimizing costs and ultimately providing the manager with the right tools for the correct development of the project. Therefore, a better planning of activities in a reduced time is accomplished. In this way, the project manager is equipped with a decision support system (DSS) that allows a better decision making and, thanks to this performance optimization, a cost-effective solution can be delivered to the company. The optimization module is the main innovative component in this IS, considering that addresses the problem as a multiobjective one, considering at the same time makespan and cost. This module is based on global bacteria optimization (GBO). This becomes the most relevant improvement when compared to other ISs in the market.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Katz, D., Kahn, R.L.: The Social Psychology of Organizations. Wiley, New York (1966). 838 p.
Kast, F.E., Rosenzweig, J.E.: Administración de las organizaciones, Madrid (1987)
Laudon, K., Laudon, J.: Sistemas de información gerencial, 12th edn. Pearson, Mexico (2011). 640 p.
Hansen, D., Mowen, M.: Administración de Costos: Contabilidad y Control, p. 31. Internacional Thomson Editores, Mexico (2003)
Horngren, C.T., Foster, G., Datar, S.M.: Contabilidad de Costos, un enfoque gerencial, p. 501. Prentice Hall, México (2007)
Alvarez-Valdés, R., Tamarit, J.M.: Heuristic algorithms for resource-constrained project scheduling: a review and empirical analysis. In: Slowinski, R., Weglarz, J. (eds.) Advances in Project Scheduling, pp. 113–134. Elsevier, Amsterdam (1989)
Bell, C.G., Han, J.: A new heuristic solution method in resource-constrained project scheduling. Naval Res. Logist. 38, 315–331 (1991)
Blazewicz, J., Lenstra, J.K., Rinnooy Kan, A.H.G.: Scheduling projects to resource constraints: classification and complexity. Discrete Appl. Math. 5, 11–24 (1983)
Dumond, J., Mabert, V.A.: Evaluating project scheduling and due date assignment procedures: an experimental analysis. Manage. Sci. 34, 101–118 (1988)
Elmaghraby, S.E., Herroelen, W.S.: The scheduling of activities to maximize the net present value of projects. Eur. J. Oper. Res. 49(1), 35–49 (1990)
Ballestín, F.G.: Nuevos metodos de resolucion del problema de secuenciacion de proyectos con recursos limitados. Doctorate dissertation, Universitat de Valencia, Servei Publicaciones, Valencia (2002)
Christofides, N., Alvarez-Valdés, R., Tamarit, J.M.: Project Scheduling with resource constraints: a branch and bound approach. Eur. J. Oper. Res. 29, 262–273 (1987)
Boctor, F.F.: Some efficient multi heuristic procedures for resource constrained project scheduling. Eur. J. Oper. Res. 49, 3–13 (1990)
Patterson, J.H.: A comparison of exact approaches for solving the multiple constrained resource. Manage. Sci. 30, 854–867 (1984)
Davis, E.W., Patterson, J.H.: A comparison heuristic and optimal solution in resource-constrained project scheduling. Manage. Sci. 21, 944–955 (1975)
Demeulemeester, E.: Minimizing resource availability cost in time-limited project networks. Manage. Sci. 41, 1590–1598 (1995)
Kolisch, R.: Efficient priority rules for the resource-constrained project scheduling problem. J. Oper. Manage. 14, 179–192 (1996)
Lee, J.K., Kim, Y.D.: Search heuristics for resource-constrained project scheduling. J. Oper. Res. Soc. 47, 678–689 (1996)
Leon, V.J., Ramamoorthy, B.: Strength and adaptability of problem space based neighbourhoods for resource-constrained scheduling. OR Spectr. 17, 173–182 (1995)
Patterson, J.H.: Project Scheduling: the effects of problem structure of heuristics. Naval Res. Logist. Q. 23, 95–123 (1976)
Patterson, J.H., Roth, G.W.: Scheduling a project under multiple resource constraints: a zero-one programming approach. AIIE Trans. 8, 449–455 (1976)
Sampsom, S.E., Weiss, E.N.: Local searches techniques for the generalized resource constrained project scheduling problem. Naval Res. Logist. 40, 665–675 (1993)
Mercado, D.R., Sepúlveda, J.A., Pedraza, L.E., Hernández, H.: Modelo de implementación de TIC en el sector transporte de la ciudad de Barranquilla utilizando dinámica de sistemas. Revista Dimensión Empresarial 12(1), 3645 (2014)
Microsoft, Project Software. https://products.office.com/es/Project/project-standard-desktop-software. Accessed on: May. 04, 2016
Logic Software, Easyprojects Software. https://www.easyprojects.net. Accessed 04 May 2016
Vertabase, Project Management Software. http://www.vertabase.com. Accessed 04 May 2016
Martínez Marín, S.J., Arango Aramburo, S., Robledo Velásquez, J.: El crecimiento de la industria del software en Colombia: Un análisis sistémico, Revista EIA, Edición 23, pp. 95–106 (2015)
Kendall, K.E., Kendall, J.E.: Análisis y diseño de sistemas, 6th edn. Pearson, Mexico (2005). 752 p.
Coronell, C., Morris, S.: Database Systems: Design, Implementation, and Management, 11th edn. Cengage Learning, Stamford (2015). 751 p.
Amaya Amaya, J.: istemas de información Gerenciales, 2nd edn. Ecoe Ediciones, Bogota (2010). 207 p.
Troelsen, A.: Pro C# 5.0 and the.NET 4.5 Framework, 6th edn. Apress, New York (2012)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Switzerland AG
About this paper
Cite this paper
Jimenez-Barros, M.A., Ramirez Rios, D.G., Ardila Hernandez, C.J., Castro Bolaño, L.J., Neira Rodado, D. (2020). Design of a Decision Support System for Multiobjective Activity Planning and Programming Using Global Bacteria Optimization. In: Saeed, K., Dvorský, J. (eds) Computer Information Systems and Industrial Management. CISIM 2020. Lecture Notes in Computer Science(), vol 12133. Springer, Cham. https://doi.org/10.1007/978-3-030-47679-3_14
Download citation
DOI: https://doi.org/10.1007/978-3-030-47679-3_14
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-47678-6
Online ISBN: 978-3-030-47679-3
eBook Packages: Computer ScienceComputer Science (R0)