Abstract
The long-term production scheduling problem, in which a schedule must obey physical constraints and operational constraints between pairs of activities, is one of the most studied scheduling problems. An important variation of this problem is to find a schedule which maximizes the net present value. Since production scheduling problems are NP-hard, there is a need of improving scheduling methodologies to get good solutions. At present, the research on scheduling theory has been paid an overwhelming attention, and has made great progress. However, it is still not mature enough. Among them, the research on complexity of the scheduling problem has become a branch of applied mathematics with a strong engineering background. The mathematical model of production scheduling problem is established, and a novel improved bat algorithm (BA) is proposed. For the purpose of expressing the relationship effectively between the process and the bat population, a new method of encoding strategy based on dual flexibility degree is proposed. For the purpose of overcoming the shortcomings of the fixed parameters in the bat algorithm, the value of the inertia weight was adjusted, and a linear decreasing inertia weight strategy was proposed. This shows that the proposed algorithm is more excellent in solving the production scheduling problem, and it is an efficient scheduling algorithm.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsReferences
Denby, B., Schofield, D.: Open-pit design and scheduling by use of genetic algorithms. Trans. Inst. Min. Metall. Section A: Min. Technol. 103, A21–A26 (1994)
Denby, B., Schofield, D.: Genetic algorithms for open pit scheduling-extension into 3-dimensions. In: Proceedings of the Mine Planning and Equipment Selection Conference, MPES 1996, pp. 177–185, Sao Paulo, Brazil (1996)
Denby, B., Schofield, D., Surme, T.: Genetic algorithms for flexible scheduling of open pit operations. In: Proceedings of the 27th Application of Computers and Operations Research in the Mineral Industry (APCOM) 1998, London, UK, pp. 473–483 (1998)
Zhang, M.: Combination Genetic algorithms and topological sort to optimize open-pit mine plans. In: Proceedings of 15th Conference on Mine Planning and Equipment Selection, Torino, Italy (2006)
Sattarvand, J., Niemann-Delius, C.: Long-term open-pit planning by ant colony optimization. Institut für Bergbaukunde III, RWTH Aachen University (2009)
Sattarvand, J., Niemann-Delius, C.: A new metaheuristic algorithm for long-term open-pit production planning. Arch. Min. Sci. 58(1), 107–118 (2013)
Khan, A.: Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty. J. South Afr. Inst. Min. Metall. 118, 361–368 (2018)
Boucher, A., Dimitrakopoulos, R.: Multivariate block-support simulation of the yandi iron ore deposit. Math. Geosci. 44(4), 449–468 (2012)
Kumral, M., Dowd, P.A.: Short-term mine production scheduling for industrial minerals using multi-objective simulated annealing. In: Proceedings of the 30th Application of Computers and Operations Research in the Mineral Industry (APCOM) 2002, Fairbanks, Alaska, USA, pp. 731–742 (2002)
Kumral, M., Dowd, P.A: A simulated annealing approach to mine production scheduling. J. Oper. Res. Soc. 56(8), 922–930 (2005)
Roman, R.J.: The role of time value of money in determining an open pit mining sequence and pit limits. In: Proceedings of 12th Symposium on Application of Computers and Operations Research in the Mineral Industry (APCOM) (1974)
Dowd, P.A., Onur, A.H.: Optimizing open pit design and sequencing. In: Proceedings of 23rd Symposium on Application of Computers and Operations Research in the Mineral Industry (APCOM) (1992)
Tolwinski, B., Underwood, R.: A scheduling algorithm for open pit mines. IMA J. Math. Appl. Bus. Ind. 7(3), 247–270 (1996)
Tolwinski, B.: Scheduling production for open pit mines. In: Proceedings of 27th International Symposium on Application of Computers and Operations Research in the Mineral Industry (APCOM), pp. 651–662 (1998)
Wang, Q., Gu, X., Chu, D.: A dynamic optimization method for determining cut-off grades in underground mines. Mineral Resources Management (2008)
Tolwinski, B., Underwood, R.: An algorithm to estimate the optimal evolution of an open pit mine. In: Proceedings of 23rd Symposium of Application of Computers and Operations Research in the Mineral Industry (APCOM), pp. 399–409 (1992)
Elevli, B.: Open pit mine design and extraction sequencing by use of OR and AI concept. Int. J. Surf. Min. Reclam. Environ. 9(4), 149–453 (1995)
Ibrahimov, M., Mohais, A., Schellenberg, S., Michalewicz, Z.: Scheduling in iron ore open-pit mining. Int. J. Adv. Manufac. Technol. 72, 1021–1037 (2014)
Talbi, E.: Metaheuristics: From Design to Implementation. Wiley, Chichester (2009)
Yang, X.S: A new metaheuristic bat-inspired algorithm. In: Nature Inspired Cooperative Strategies for Optimization, vol. 284, pp. 65–74 (2010)
Yang, X.: Nature-Inspired Metaheuristic Algorithms. Luniver Press, London (2010)
Richmond, A.J.: Maximum profitability with minimum risk and effort. Application of Computers and Operations Research in the Mineral Industry, pp. 45–50 (2001)
Moosavi, E., Gholamnejad, J.: Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade. J. Min. Sci. 52(5), 956–964 (2016)
Ramazan, S., Dimitrakopoulos, R.: Stochastic optimization of long-term production scheduling for open pit mines with a new integer programming formulation. In: Proceedings of Orebody Modelling and Strategic Mine Planning: Uncertainty and Risk Management Models. Australasian Institute of Mining and Metallurgy, Melbourne, pp. 385–392 (2004)
Afrabandpey, H., Ghaffari, M., Mirzaei, A., Safayani, M.: A novel bat algorithm based on chaos for optimization tasks. In Proceedings of the Iranian Conference on Intelligent Systems (ICIS 2014), pp. 1–6. IEEE, Bam, Iran (2014)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Switzerland AG
About this paper
Cite this paper
Moosavi, E. (2020). Modeling Long-Term Production Scheduling Problem and Its Solution Using a Bat Meta-heuristic Method. In: Topal, E. (eds) Proceedings of the 28th International Symposium on Mine Planning and Equipment Selection - MPES 2019. MPES 2019. Springer Series in Geomechanics and Geoengineering. Springer, Cham. https://doi.org/10.1007/978-3-030-33954-8_13
Download citation
DOI: https://doi.org/10.1007/978-3-030-33954-8_13
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-33953-1
Online ISBN: 978-3-030-33954-8
eBook Packages: EngineeringEngineering (R0)