Skip to main content

An Investigation of Causes of Delay Affecting the United Arab Emirates Construction Industry

  • Conference paper
  • First Online:
Proceedings of AICCE'19 (AICCE 2019)

Part of the book series: Lecture Notes in Civil Engineering ((LNCE,volume 53))

Included in the following conference series:

Abstract

The construction industry is one of the key elements of the economy; therefore, it has a major impact on the economic development of the UAE. A common problem affecting the delivery of projects (private or public) is delay, which has a significant negative effect on the UAE economy. The objective of this study is to determine the critical delay factors that affect construction projects in the UAE. A literature review was also conducted, in which 106 factors were identified. A structured survey questionnaire was then developed and distributed to experienced engineers working in the UAE construction industry. The top factors that cause construction delay were found to be: changes of orders, clients’ delays in decision-making and approval, financing difficulties of contractors, contractors’ poor site management and poor site supervision, contractors’ poor controls of site progress. These research findings can provide good guidelines to the construction industry to minimize the delay by addressing its causes. The guidelines advise the clients to reduce change order requests and avoid delays in decision making or approval required at any stage of construction; support the contractors in project planning; and prepare the contractors for project risk expected in the project at the planning stage before execution.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 259.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 329.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 329.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Alamri N, Amoudi O, Njie G (2017) Analysis of construction delay causes in dams projects in Oman. Eur J Bus Soc Sci 6(2):19–42

    Google Scholar 

  2. Alghbari W, Razali M, Salim A, Ernawati (2007) The significant factors causing delay of building construction projects in Malaysia. J Eng Constr Architect Manage 14(2):192–206

    Google Scholar 

  3. Assaf SA, Al-Hejji S (2006) Causes of delay in large construction projects. Int J Project Manage 24(4):349–357

    Article  Google Scholar 

  4. Bagaya O, Song J (2016) Empirical study of factors influencing schedule delays of public construction projects in Burkina Faso. J Manag Eng 32(5):05016014

    Article  Google Scholar 

  5. Bekr GA (2015) Causes of delay in public construction projects in Iraq. Jordan J Civil Eng 159(3091):1–14

    Google Scholar 

  6. Coakes SJ, Steed L (2009) SPSS: analysis without anguish using SPSS version 14.0 for Windows. Wiley, New York

    Google Scholar 

  7. Kazaz A, Ulubeyli S, Tuncbilekli NA (2012) Causes of delays in construction projects in Turkey. J Civil Eng Manag 18(3):426–435

    Article  Google Scholar 

  8. Kikwasi G (2012) Causes and effects of delays and disruptions in construction projects in Tanzania. Aust J Constr Econ Buil Conf Ser 1(2):52–59

    Google Scholar 

  9. Kim SY, Tuan KN (2016) Delay factor analysis for hospital projects in Vietnam. KSCE J Civil Eng 20(2):519–529

    Article  Google Scholar 

  10. Koshe W, Jha KN (2016) Investigating causes of construction delay in Ethiopian construction industries. J Civil Constr Environ Eng 1(1):18

    Google Scholar 

  11. Kottegoda NT, Rosso R (1997) Statistics, probability and reliability for civil and environmental engineers. Mc-Graw-Hill Publishing Company, pp 1–735

    Google Scholar 

  12. Ministry of Economy UAE (2017) Annual economic report. UAE Retrieved from http://www.economy.gov.ae/EconomicalReportsEn/MOE.AnnualReport2017_English.pdf

  13. Mohammed SR, Jasim AJ (2017) Study and analysis of the delay problems in Iraqi construction projects. Int J Sci Res. https://doi.org/10.21275/ART20173791

  14. Motaleb O, Kishk M (2010) An investigation into causes and effects of construction delays in UAE. Paper presented at the 26th Annual ARCOM Conference

    Google Scholar 

  15. Motaleb O, Kishk M (2013) An investigation into the risk of construction projects delays in the UAE. Int J Inf Technol Project Manag (IJITPM) 4(3):50–65

    Article  Google Scholar 

  16. Odeh AM, Battaineh HT (2002) Causes of construction delay: traditional contracts. Int J Project Manage 20(1):67–73

    Article  Google Scholar 

  17. Ren Z, Atout M, Jones J (2008) Root causes of construction project delays in Dubai. In: Proceedings of 24th annual ARCOM conference, Sept 2008, pp 1–3

    Google Scholar 

  18. Salama M, El Hamid MA, Keogh B (2008) Investigating the causes of delay within oil and gas projects in the UAE. In: 24th annual ARCOM conference, Sept 2008, pp 1–3

    Google Scholar 

  19. Samarah A, Bekr GA (2016) Causes and effects of delay in public construction projects in Jordan. Am J Eng Res 5(5):87–94

    Google Scholar 

  20. Sambasivan M, Soon YW (2007) Causes and effects of delays in Malaysian construction industry. Int J Project Manage 25(5):517–526

    Article  Google Scholar 

  21. Sunjka BP, Jacob U (2013) Significant causes and effects of project delays in the Niger delta region, Nigeria. South Afr Inst Ind Eng

    Google Scholar 

  22. Taha G, Badawy M, El-Nawawy O (1971) A model for evaluation of delays in construction projects. Int J Innov Res Sci Eng Technol 3021–3028

    Google Scholar 

  23. Thorat S, Khandare MA, Kanase AK (2017) Identifying the causes and effects of delay in residential projects

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Abdulhamid AlGheth .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

AlGheth, A., Ishak Sayuti, M. (2020). An Investigation of Causes of Delay Affecting the United Arab Emirates Construction Industry. In: Mohamed Nazri, F. (eds) Proceedings of AICCE'19. AICCE 2019. Lecture Notes in Civil Engineering, vol 53. Springer, Cham. https://doi.org/10.1007/978-3-030-32816-0_26

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-32816-0_26

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-32815-3

  • Online ISBN: 978-3-030-32816-0

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics