Production Planning at a Chocolate Company: A Two-Phase Approach by Aggregation

  • Conference paper
  • First Online:
  • 1567 Accesses

Part of the book series: Lecture Notes in Mechanical Engineering ((LNME))

Abstract

There are some factors to be considered while developing production planning policy of chocolate and chocolate-based products. One of these factors is that chocolate is a perishable food, therefore it has limited shelf life. Another factor is that; its demand is not always easy to forecast. Holidays, mothers’ day, teachers’ day, valentines’ day and new year are examples of the peak periods. For these special days, demand generally follows a seasonal demand pattern where seasonality may also contain trend for some specific product types. Moreover, there are two religious holidays (Ramadan Feast and Feast of Sacrifice) in Turkey whose dates shift each year. This phenomenon makes forecasts challenging. Underestimating demand causes loss of customer goodwill, lost customers and market share whereas overestimating demand causes excess inventory to keep in stock and risk of fat blooming. Accurate forecasting is critical since it provides a fundamental input for the production plan.

The study is conducted in a chocolate company in Turkey. The company does not implement a systematic planning method for chocolate production, instead the planning is based on past experiences with respect to experts’ opinions. The objective of this study is to determine the optimal production and ending inventory levels for the period of 2018 so as to minimize total production and inventory holding cost subject to production, inventory and capacity related restrictions. A two-phase optimization method is adopted as a solution method. Firstly, a mathematical model is developed for the monthly aggregate production planning on product group basis. In order to solve the problem, monthly demand for product groups are forecasted based on the sales data of the previous two years. Secondly, a mathematical model for weekly disaggregate production planning is developed for each end item using the outputs of the aggregate planning as input. The disaggregate production plan gives the weekly planned production and inventory levels for end items for year 2018 with minimum deviation from the aggregate plan. Although the proposed solution model is implemented for year 2018, it can be used for the coming years by updating some parameters.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD   219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

References

  1. Türkiye’de Çikolata Pazarının Büyüklüğü. NTV (2017). https://www.ntv.com.tr/ekonomi/turkiyede-cikolata-pazarinin-buyuklugu-5–3-milyar-tl,OUwZnIYp0EmBChpI0dW17Q

  2. Geboers, F.: Demand Forecasts and Ordering Implications for the Bread Assortments of Dutch Retailers. MS Thesis, Eindhoven University of Technology, Eindhoven, Netherlands (2010)

    Google Scholar 

  3. Ojeda, A.F.A.: Production Planning with Raw Material Shelf-Life Considerations by Mixed Integer Programming. MS Thesis, Concordia University, Montreal, Quebec, Canada (2012)

    Google Scholar 

  4. Ziukov, S.: A literature review on models of inventory management under uncertainty. Bus. Syst. Econ. 5(1), 26–35 (2015)

    Article  Google Scholar 

  5. Sarker, B.R., Babu, P.S.: Effect of production cost on shelf life. Int. J. Prod. Res. 31(8), 1865–1872 (1993)

    Article  Google Scholar 

  6. Davizón, Y.A., Martínez-Olvera, C., Soto, R., Hinojosa, C., Espino-Román, P.: Optimal control approaches to the aggregate production planning problem. Sustainability 7, 16324–16339 (2015)

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Zehra Düzgit .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Düzgit, Z. et al. (2020). Production Planning at a Chocolate Company: A Two-Phase Approach by Aggregation. In: Durakbasa, N., Gençyılmaz, M. (eds) Proceedings of the International Symposium for Production Research 2019. ISPR ISPR 2019 2019. Lecture Notes in Mechanical Engineering. Springer, Cham. https://doi.org/10.1007/978-3-030-31343-2_15

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-31343-2_15

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-31342-5

  • Online ISBN: 978-3-030-31343-2

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics