Abstract
Although there are many business process improvement (BPI) methods, organizations are struggling to apply them effectively. We answer to the call to focus more on the organizational context in BPI projects. We use workarounds – deviations from the prescribed way of using an information system – as a specific angle to approach BPI. In five healthcare organizations of different contextual types, we study workarounds and make recommendations for process improvements. Based on this explorative multiple-case study, we propose a set of contextual activities for each stage of a BPI project. Thereby, we shed light on the differences in tackling process improvements in organizations that differ in size, culture, and the availability of resources for BPI projects. We evaluate the completeness and expected adoption of the proposed contextual BPI activities by organizing two focus groups and conducting a survey.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Altinkemer, K., Ozcelik, Y., Ozdemir, Z.D.: Productivity and performance effects of business process reengineering: a firm-level analysis. J. Manag. Inf. Syst. 27, 129–162 (2011)
Vanwersch, R.J.B., et al.: A critical evaluation and framework of business process improvement methods. Bus. Inf. Syst. Eng. 58, 43–53 (2016)
Gross, S., Malinova, M., Mendling, J.: Navigating through the maze of business process change methods. In: Proceedings of the 52nd Hawaii International Conference on System Sciences (2019)
Vom Brocke, J., Schmiedel, T., Recker, J., Trkman, P., Mertens, W., Viaene, S.: Ten principles of good business process management. Bus. Process Manag. J. 20, 530–548 (2014)
Benner, M.J., Tushman, M.L.: Exploitation, exploration, and process management: the productivity dilemma revisited. Acad. Manag. Rev. 28, 238–256 (2003)
Denner, M.-S., Röglinger, M., Schmiedel, T., Stelzl, K., Wehking, C.: How context-aware are extant BPM methods? - development of an assessment scheme. In: Weske, M., Montali, M., Weber, I., vom Brocke, J. (eds.) BPM 2018. LNCS, vol. 11080, pp. 480–495. Springer, Cham (2018). https://doi.org/10.1007/978-3-319-98648-7_28
Rosemann, M., Recker, J.C., Flender, C.: Contextualisation of business processes. Int. J. Bus. Process Integr. Manag. 3, 47–60 (2008)
vom Brocke, J., Zelt, S., Schmiedel, T.: On the role of context in business process management. Int. J. Inf. Manag. 36, 486–495 (2016)
Kettinger, W.J., Teng, J.T.C., Guha, S.: Business process change: a study of methodologies, techniques, and tools. MIS Q. 21, 55–80 (1997)
Schilit, B.N., Theimer, M.M.: Disseminating active map information to mobile hosts. IEEE Netw. 8, 22–32 (1994)
Ploesser, K., Recker, J.C.: Context-aware methods for process modeling. In: Business Process Modeling: Software Engineering, Analysis and Applications, pp. 117–134. Nova Publishers (2011)
Günther, C.W., Rinderle-Ma, S., Reichert, M., Van Der Aalst, W.M.P., Recker, J.: Using process mining to learn from process changes in evolutionary systems. Int. J. Bus. Process Integr. Manag. Spec. Issue Bus. Process Flex. 3, 61–78 (2008)
Recker, J.: Opportunities and constraints: the current struggle with BPMN. Bus. Process Manag. J. 16, 181–201 (2010)
Hahn, C., Recker, J., Mendling, J.: An exploratory study of IT-enabled collaborative process modeling. In: zur Muehlen, M., Su, J. (eds.) BPM 2010. LNBIP, vol. 66, pp. 61–72. Springer, Heidelberg (2011). https://doi.org/10.1007/978-3-642-20511-8_6
Puhlmann, F., Weske, M.: Investigations on soundness regarding lazy activities. In: Dustdar, S., Fiadeiro, J.L., Sheth, Amit P. (eds.) BPM 2006. LNCS, vol. 4102, pp. 145–160. Springer, Heidelberg (2006). https://doi.org/10.1007/11841760_11
Weber, I., Haller, J., Mulle, J.A.: Automated derivation of executable business processes from choreographies in virtual organisations. Int. J. Bus. Process Integr. Manag. 3, 85 (2008)
Lalley, C., Malloch, K.: Workarounds: the hidden pathway to excellence. Nurse Lead. 8, 29–32 (2010)
Safadi, H., Faraj, S.: The role of workarounds during an opensource electronic medical record system implementation. In: ICIS 2010 Proceedings, St. Louis (2010)
Beerepoot, I., Van De Weerd, I.: Prevent, redesign, adopt or ignore: improving healthcare using knowledge of workarounds. In: ECIS 2018 (2018)
Yin, R.K.: Case Study Research and Applications: Design and Methods. Sage Publications, Thousand Oaks (2017)
Eisenhardt, K.M.: Building theories from case study research. Acad. Manag. Rev. 14, 532–550 (1989)
Lenz, R., Reichert, M.: IT support for healthcare processes. In: van der Aalst, W.M.P., Benatallah, B., Casati, F., Curbera, F. (eds.) BPM 2005. LNCS, vol. 3649, pp. 354–363. Springer, Heidelberg (2005). https://doi.org/10.1007/11538394_24
Reijers, H.A., Russell, N., van der Geer, S., Krekels, G.A.M.: Workflow for healthcare: a methodology for realizing flexible medical treatment processes. In: Rinderle-Ma, S., Sadiq, S., Leymann, F. (eds.) BPM 2009. LNBIP, vol. 43, pp. 593–604. Springer, Heidelberg (2010). https://doi.org/10.1007/978-3-642-12186-9_57
Moody, D.L.: The method evaluation model: a theoretical model for validating information systems design methods. In: ECIS 2003 Proceedings, p. 79 (2003)
Jayaram, J., Ahire, S.L., Dreyfus, P.: Contingency relationships of firm size, TQM duration, unionization, and industry context on TQM implementation: a focus on total effects. J. Oper. Manag. 28, 345–356 (2010)
Shah, R., Ward, P.T.: Lean manufacturing: context, practice bundles, and performance. J. Oper. Manag. 21, 129–149 (2003)
Lee, G., Xia, W.: Organizational size and IT innovation adoption: a meta-analysis. Inf. Manag. 43, 975–985 (2006)
Schmiedel, T., vom Brocke, J., Recker, J.: Culture in business process management: how cultural values determine BPM success. In: vom Brocke, J., Rosemann, M. (eds.) Handbook on Business Process Management 2. IHIS, pp. 649–663. Springer, Heidelberg (2015). https://doi.org/10.1007/978-3-642-45103-4_27
Schmiedel, T., vom Brocke, J., Recker, J.: Which cultural values matter to business process management? Results from a global Delphi study. Bus. Process Manag. J. 19, 292–317 (2013)
Thiemich, C., Puhlmann, F.: An agile BPM project methodology. In: Daniel, F., Wang, J., Weber, B. (eds.) BPM 2013. LNCS, vol. 8094, pp. 291–306. Springer, Heidelberg (2013). https://doi.org/10.1007/978-3-642-40176-3_25
Donaldson, L.: The Contingency Theory of Organizations. Sage, Thousand Oaks (2001)
Niehaves, B.: Open process innovation: the impact of personnel resource scarcity on the involvement of customers and consultants in public sector BPM. Bus. Process Manag. J. 16, 377–393 (2010)
Wheeler, A.R., Halbesleben, J.R.B., Harris, K.J.: How job-level HRM effectiveness influences employee intent to turnover and workarounds in hospitals. J. Bus. Res. 65, 547–554 (2012)
Blandford, A., Furniss, D., Vincent, C.: Patient safety and interactive medical devices: realigning work as imagined and work as done. Clin. Risk 20, 107–110 (2014)
Park, S.Y., Chen, Y.: Adaptation as design: learning from an EMR deployment study. In: Proceedings of the Conference on Human Factors in Computing Systems, Austin, TX, pp. 2097–2106 (2012)
Barrett, A.K., Stephens, K.K.: Making electronic health records (EHRs) work: informal talk and workarounds in healthcare organizations. Health Commun. 32, 1004–1013 (2017)
Malaurent, J., Avison, D.: From an apparent failure to a success story: ERP in China - post implementation. Int. J. Inf. Manag. 35, 643–646 (2015)
Reijers, H.A., van Wijk, S., Mutschler, B., Leurs, M.: BPM in practice: who is doing what? In: Hull, R., Mendling, J., Tai, S. (eds.) BPM 2010. LNCS, vol. 6336, pp. 45–60. Springer, Heidelberg (2010). https://doi.org/10.1007/978-3-642-15618-2_6
Burlton, R.: BPM critical success factors lessons learned from successful BPM organizations. Bus. Rules J. 12, 1–6 (2011)
Ravesteyn, P., Jansen, S.: A situational implementation method for business process management systems. In: AMCIS 2009 Proceedings, p. 632 (2009)
Rosemann, M.: Proposals for future BPM research directions. In: Ouyang, C., Jung, J.-Y. (eds.) AP-BPM 2014. LNBIP, vol. 181, pp. 1–15. Springer, Cham (2014). https://doi.org/10.1007/978-3-319-08222-6_1
Rosemann, M., de Bruin, T.: Towards a business process management maturity model. In: ECIS 2005 Proceedings, p. 37 (2005)
Malhotra, R., Temponi, C.: Critical decisions for ERP integration: small business issues. Int. J. Inf. Manag. 30, 28–37 (2010)
Germain, R., Spears, N.: Quality management and its relationship with organizational context and design. Int. J. Qual. Reliab. Manag. 16, 371–392 (1999)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2019 Springer Nature Switzerland AG
About this paper
Cite this paper
Beerepoot, I., van de Weerd, I., Reijers, H.A. (2019). Business Process Improvement Activities: Differences in Organizational Size, Culture, and Resources. In: Hildebrandt, T., van Dongen, B., Röglinger, M., Mendling, J. (eds) Business Process Management. BPM 2019. Lecture Notes in Computer Science(), vol 11675. Springer, Cham. https://doi.org/10.1007/978-3-030-26619-6_26
Download citation
DOI: https://doi.org/10.1007/978-3-030-26619-6_26
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-26618-9
Online ISBN: 978-3-030-26619-6
eBook Packages: Computer ScienceComputer Science (R0)