Abstract
Successive administrations in Nigeria have expended several efforts on housing delivery through either the traditional (TRD), or public-private partnership (PPP) procurement route among others. Considering the relationship between housing demand and supply, there is no record of meaningful achievements due to several factors. This study explored the factors affecting the cost performance of TRD and PPP with a view to enhance their performance. Eighty questionnaires retrieved from two sets of respondents were analysed on housing project at Suleja, Niger State, Nigeria. Mean score and Mann-Whitney test were used to assess the influence of these factors, and test the significance of the difference between the views of both set of respondents. The study revealed that economic conditions, unforeseen ground conditions and cash flow/finance as the key factors influencing TRD, while fluctuation in prices of materials, late delivery of materials, and economic conditions are the key factors influencing PPP.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Babatunde, S.O., Opawole, A., Ujaddugbe, I.C.: An appraisal of project pro- curement methods in the Nigerian construction industry. Civil Eng. Dimens. 12(1), 1–7 (2010)
Ogunsanmi, O.E.: Correlates of procurement performance of traditional and labour-only methods in Nigeria. Ethiop. J. Environ. Stud. Manage. 6(2), 182–190 (2013)
Ogunsanmi, O.E., Bamisile, A.: Factors affecting the selection of project procurement methods. Build. Mag. 12(1), 11–16 (1997)
Ashworth, A., Hogg, K.: Willis’s Practice and Procedure for Quantity Surveyor. Blackwell Publishing Ltd., Oxford (2007)
Ojo, S.O., Adeyemi, A.Y., Fagbenle, O.I.: The performance of traditional contract procurement on housing projects in Nigeria. Civil Eng. Di-mens. 8(2), 81–86 (2006)
Sanni, A.O.: Factors determining the success of public private partnership projects in Nigeria. Constr. Econ. Build. 16(2), 42–55 (2016)
Idiake, J.E., Shittu, A.A., Anunobi, A.I., Akanmu, W.P.: A comparative analysis of traditional and design & build methods of procurement in the Nigerian construction industry. Int. J. Constr. Eng. Manage. 4(1), 1–12 (2015)
Ojo, S.O.: Benchmarking the performance of construction procurement methods against selection criteria in Nigeria. Civil Eng. Dimens. 11(2), 106–112 (2009)
Turner, A.: Building Procurement. Macmillan Education Ltd., Basingstoke (1990)
Dada, M.O.: Predictors of procurement selection: an investigation of traditional and integrated methods in Nigeria. J. Constr. Dev. Ctries. 17(1), 69–83 (2012)
Olaniyan, O.: Appraisal of critical success factors (CSF) for implementation of public-private partnership in Lagos State. M.Sc. Thesis, University of Lagos, Lagos (2013)
Egbewole, Q.A.: Examining public-private partnership in Nigeria: potentials and challenges. LLB Long Essay of University of Ilorin, Ilorin (2011)
Syuhaida, I., Aminah, M.Y.: The provision of infrastructure via private finance initiative. Theor. Empir. Res. Urban Manage. 4, 76–86 (2009). Special Number 15/April 2009: Urban Issues in Asia
Oyewobi, O.L., Ibrahim, A.D., Ibrahim, Y.M.: Investigating optimum conditions for public-private partnership in health, education and housing sectors in Nigeria. In: Laryea, S., Agyepong, S.A., Leiringer, R., Hughes, W. (eds.) Proceedings of 4th West Africa Built Environment Research (WABER) Conference, 24–26 July 2012, Abuja, Nigeria, pp. 1261–1274 (2012)
Ogunsanmi, O.E.: Critical success factors (CSF) determining the implementation of public-private partnership projects. Covenant J. Res. Built Environ. (CJRBE). 1(2), 41–66 (2013)
Ubani, E.C., Okorocha, K.A., Emeribe, S.C.: Analysis of Factors influencing time and cost overrun on construction projects in South Eastern Nigeria. Int. J. Manage. Sci. Bus. Res. 2(2), 73–84 (2013)
Iyer, K.C., Jha, K.N.: Factors affecting cost performance: evidence from Indian construction projects. Int. J. Proj. Manage. 23(4), 283–295 (2005)
Oyedele, E.: The British and the making of a Capital City. In: Ashafa, A.M. (ed.) 1913–1960 Urbanization and Infrastructure in Nigeria since the 20th Century. Kaduna State University, Kaduna, Nigeria, pp. 20–60 (2011)
Memon, A.H., Rahman, I.A., Abdullah, M.A., Aziz, A.A.A.: Time overrun in construction projects from the perspective of project management consultant (PMC). J. Surv. Constr. Property 2(1), (2011)
Aje, I.O., Omoraka, A.E., Ariyo, I.E.: Assessment of factors inhibiting cost performance of construction projects in Nigeria. Quant. Surv. 60, 21–31 (2015)
Omoregie, A., Radford, D.: Infrastructure delay and cost escalations: causes and effects in Nigeria. School of Architecture, De Montford University, Leicester, LE 1 9BH, England (2006)
Memon, A.H., Rahman, I.A., Abdullah, M.R., Azis, A.A.: Factors affecting construction cost performance in project management projects: case of Mara large projects. In: Proceedings of Post Graduate Seminar on Engineering, Technology and Social Science. Universiti Tun Hussein Onn Malaysia (2010)
Endut, I.R., Akintoye, A., Kelly, J.: Cost and time overruns of projects in Malaysia, pp. 243–252 (2019). http://www.irbnet.de/daten/iconda/CIB10633.pdf. Accessed 26 Apr 2019
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Switzerland AG
About this paper
Cite this paper
Akinradewo, O.F., Omoraka, A.E. (2020). Factors Influencing the Cost Performance of Traditional and Public-Private Partnership Procured Housing Projects in Nigeria. In: Aigbavboa, C., Thwala, W. (eds) The Construction Industry in the Fourth Industrial Revolution. CIDB 2019. Springer, Cham. https://doi.org/10.1007/978-3-030-26528-1_3
Download citation
DOI: https://doi.org/10.1007/978-3-030-26528-1_3
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-26527-4
Online ISBN: 978-3-030-26528-1
eBook Packages: EngineeringEngineering (R0)