Abstract
In the present global scenario, survival of the industry is more critical unless it produces their intended targets. Accomplishment of expected rate of production levels are depends on the performance of equipment. Hence, it is very important to predict the maintenance schedules for replacement or repair actions of the defective parts. Keeping in view, every industry is constantly looking for enhancement equipment life. Reliability analysis is one of the well appropriated techniques used to estimate the life of the equipment. In this paper, performance of Load-Haul-Dumper (LHD) has been analyzed. Renewal process approach has been utilized for reliability investigation. Best fit distribution of data sets were made by the utilization of Kolmogorov-Smirnov (K-S) test. Parametric estimation of theoretical probability distributions was done by utilizing Maximum Likelihood Estimate (MLE) method. Reliability of each individual sub-system has been computed according to the best fit distribution. In addition to that, reliability based preventive maintenance (PM) time schedules were calculated for the expected 90% reliability level. The possible recommendations were suggested for improvement of reliability level.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Military Handbook (2003) Military Handbook, MIL-HDBK-5H: Metallic Materials and Elements for Aerospace Vehicle Structures, (Knovel Interactive Edition), pp 6–55. U.S. Department of Defense
Dhillon BS (2008) Mining equipment reliability maintainability and safety. Springer, London, pp 57–70. https://doi.org/10.1007/978-1-84800-288-3_4
Jardine AKS (1998) Maintenance replacement and reliability. Preney Print and Litho Inc., Ontario
Vagenas N, Runciman N, Clement SR (1997) A methodology for maintenance analysis of mining equipment. Int J Surf Min Reclam Env 11:33–40
Ascher H, Feingold H (1984) Repairable systems reliability modeling inference misconceptions and their causes, vol 45, no 4. Marcel Dekker, New York, pp 222–232
Vagenas N, Kazakidis V, Scoble M, Espley S (2003) Applying a maintenance methodology for excavation reliability. J Surf Min Reclam Environ 17:4–19
Kumar U, Klefsjo B, Granholm S (1989) Reliability investigation for a fleet of load haul dump machines in a Swedish mine. Reliab Eng Syst Saf 26(4):341–361
Nuziale T, Vagenas N (2000) A software architecture for reliability analysis of mining equipment. Int J Surf Min Reclaim Env 114:19–34
Esmaeili M, Aghajani A (2011) Reliability analysis of a fleet of loaders in Sangan Iron Mine. Arch Min Sci 56:629–640
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Switzerland AG
About this paper
Cite this paper
BalaRaju, J., Govinda Raj, M., Murthy, C.S.N. (2020). Reliability Analysis of LHD Machine - A Case Study. In: Satapathy, S., Raju, K., Molugaram, K., Krishnaiah, A., Tsihrintzis, G. (eds) International Conference on Emerging Trends in Engineering (ICETE). Learning and Analytics in Intelligent Systems, vol 2. Springer, Cham. https://doi.org/10.1007/978-3-030-24314-2_40
Download citation
DOI: https://doi.org/10.1007/978-3-030-24314-2_40
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-24313-5
Online ISBN: 978-3-030-24314-2
eBook Packages: EngineeringEngineering (R0)