Abstract
In recent years, with the advent of the era of “Internet +”, the development trend of informatization and digitization exist all walks of life, BIM (building information model) as the construction industry the most advanced information and digital technology obtained the promotion and application of the government and the construction industry in our country, the application of new technology will bring a series of change, so the IPD(integrated project delivery) model appeared based on BIM technology, based on the full consideration under the network environment, it is necessary to make further improvement on the IPD model, that is the formation of the IPD mode as the core delivery, With BIM technology, “Internet +” related technology and network organization structure to support the improvement of the IPD management mode, and to analyze the basic principle and framework, operation mechanism and implementation process of the improvement of IPD model, then contrast analysis on the IPD mode before and after improve, finally to prove the improvement of IPD mode is feasible and scientific by the practical application of simulation.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsReferences
https://info.aia.org/siteobjects/files/ipd-guide-2007. Technical report, AIA (2017)
Integrated project delivery: A guide. Technical report, AIA [2017-03-25] (2017)
Asmar, M.E., Hanna, A.S., Loh, W.Y.: Quantifying performance for the integrated project delivery system as compared to established delivery systems. J. Constr. Eng. Manag. 139(11), 04013012 (2013)
Peffers, K., Rothenberrger, M., Tuunanen, T. et al.: Design science research in information systems. Adv. Theory Pract. 398 (2012)
Kent, D.C., Becerikgerber, B.: Understanding construction industry experience and attitudes toward integrated project delivery. J. Constr. Eng. Manag. 136(8), 815–825 (2010)
Lahdenpera, P.: Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery. Constr. Manag. Econ. 30(1), 57–79 (2012)
Lee, S., Liang, S.: Key core project management of construction industry to study. Open J. Soc. Sci. 2(03), 48 (2014)
Miller, R., Strombom, D., Iammarino, M. et al.: The Commercial Real Estate Revolution, vol. 328. Hoboken, Wiley (2009)
Nasfa, X., Appa, A., Agc, A.I.A.: Integrated project delivery for public and private owners (2010). Accessed 12 Dec 2012
Pena-Mora, F., Li, M.: Dynamic planning and control methodology for design/build fast-track construction projects. J. Constr. Eng. Manag. 127(1), 1–17 (2001)
Sacks, R., et al.: Requirements for building information modeling based lean production management systems for construction. Autom. Constr. 19(5), 641–655 (2010)
Thomson, J.D.: Managing integrated project delivery. In: Construction Management Association of America (CMAA), vol. 105. McLean, VA (2009)
Tran, Q., Tian, Y.: Organizational structure: Influencing factors and impact on a firm. Am. J. Ind. Bus. Manag. 3(2), 229 (2013)
Wang, X., Xie, B., Lu, W.: Research overview of project management mode decision-making. J. Eng. Manag. 67 (2013(4)). (in Chinese)
Ma, Z., Ma, J.: The application of ipd and b1m technology in it. Inf. Technol. Civ. Constr. Eng. 36–41 (2011). (in Chinese)
Ma, Z., Li, S.: The commercial real estate revolution environment. J. Tongji Univ. 991 (2018) (in Chinese)
Acknowledgements
This research topic by Science and technology special project in Zhanjiang city subsidy (NO:2018B01010). This paper was completed under the guidance of master tutor Xiaozhong Yu. I am appreciated for the guidance of professor Yu; His rigorous academic attitude and scientific research spirit have inspired me a lot. In addition, I would like to thank all the scholars in this field, which is the basis of this paper. Thank you for everyone’s contribution!
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Switzerland AG
About this paper
Cite this paper
Wan, L., Yu, X. (2020). Research on the Improvement of IPD Management Mode of Engineering Project Under Network Environment. In: Xu, J., Ahmed, S., Cooke, F., Duca, G. (eds) Proceedings of the Thirteenth International Conference on Management Science and Engineering Management. ICMSEM 2019. Advances in Intelligent Systems and Computing, vol 1002. Springer, Cham. https://doi.org/10.1007/978-3-030-21255-1_3
Download citation
DOI: https://doi.org/10.1007/978-3-030-21255-1_3
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-21254-4
Online ISBN: 978-3-030-21255-1
eBook Packages: Intelligent Technologies and RoboticsIntelligent Technologies and Robotics (R0)