Skip to main content

Restoration Time Prediction in Large Scale Railway Networks: Big Data and Interpretability

  • Conference paper
  • First Online:
  • 1018 Accesses

Part of the book series: Proceedings of the International Neural Networks Society ((INNS,volume 1))

Abstract

Every time an asset of a large scale railway network is affected by a failure or maintained, it will impact not only the single asset functional behaviour but also the normal execution of the railway operations and trains circulation. In this framework, the restoration time, namely the time needed to restore the asset functionality, is a crucial information for handling and reducing this impact. In this work we deal with the problem of building an interpretable and reliable restoration time prediction system which leverages on the large amount of data generated by the network, on other freely available exogenous data such as the weather information, and the experience of the operators. Results on real world data coming from the Italian railway network will show the effectiveness and potentiality of our proposal.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

Notes

  1. 1.

    The details about this model cannot be disclosed because of confidentiality issues.

  2. 2.

    In order to give an idea of the number of maintenance and faults, just for a small region of the north of Italy we have more that 100.000 records; we cannot disclose more details because of confidentiality issues.

  3. 3.

    https://cloud.google.com.

  4. 4.

    The full model which has more levels is not reported for confidentiality issues.

References

  1. Ahren, T., Parida, A.: Maintenance performance indicators (MPIs) for benchmarking the railway infrastructure: a case study. Benchmarking Int. J. 16(2), 247–258 (2009)

    Article  Google Scholar 

  2. Cacchiani, V., Huisman, D., Kidd, M., Kroon, L., Toth, P., Veelenturf, L., Wagenaar, J.: An overview of recovery models and algorithms for real-time railway rescheduling. Transp. Res. Part B Methodol. 63, 15–37 (2014)

    Article  Google Scholar 

  3. Italian Weather Services: Weather Data (2018). http://www.cartografiarl.regione.liguria.it/SiraQualMeteo/script/PubAccessoDatiMeteo.asp. Accessed 16 Oct 2018

  4. James, G., Witten, D., Hastie, T., Tibshirani, R.: An Introduction to Statistical Learning. Springer, New York (2013)

    Book  Google Scholar 

  5. Meng, X., Bradley, J., Yavuz, B., Sparks, E., Venkataraman, S., Liu, D., Freeman, J., Tsai, D.B., Amde, M., Owen, S.: MLlib: machine learning in apache spark. J. Mach. Learn. Res. 17(1), 1235–1241 (2016)

    MathSciNet  MATH  Google Scholar 

  6. Oneto, L.: Model selection and error estimation without the agonizing pain. WIREs Data Min. Knowl. Discov. 8(4), e1252 (2018)

    Article  Google Scholar 

  7. Shalev-Shwartz, S., Ben-David, S.: Understanding Machine Learning: From Theory to Algorithms. Cambridge University Press, Cambridge (2014)

    Book  Google Scholar 

  8. Zoeteman, A.: Asset maintenance management: state of the art in the european railways. Int. J. Crit. Infrastruct. 2(2–3), 171–186 (2006)

    Article  Google Scholar 

Download references

Acknowledgments

This research has been supported by the European Union through the projects IN2DREAMS (European Union’s Horizon 2020 research and innovation programme under grant agreement 777596).

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Luca Oneto .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Oneto, L., Buselli, I., Sanetti, P., Canepa, R., Petralli, S., Anguita, D. (2020). Restoration Time Prediction in Large Scale Railway Networks: Big Data and Interpretability. In: Oneto, L., Navarin, N., Sperduti, A., Anguita, D. (eds) Recent Advances in Big Data and Deep Learning. INNSBDDL 2019. Proceedings of the International Neural Networks Society, vol 1. Springer, Cham. https://doi.org/10.1007/978-3-030-16841-4_14

Download citation

Publish with us

Policies and ethics