Skip to main content

Six Sigma Model Optimized for Reducing Downtime in an Open-Pit Mine

  • Conference paper
  • First Online:
Proceedings of the 4th Brazilian Technology Symposium (BTSym'18) (BTSym 2018)

Abstract

Currently, in open-pit mining operations, the highest cost among all processes is that of transporting trucks, whether in fuel, roads, tires, or spare parts, among other factors. Therefore, this article proposes the use of the Six Sigma methodology of continuous improvement as a quality management tool to reduce the downtime of the truck fleet to obtain better productivity in operations. The results of the investigation in the case study allowed to visualize that with the election of an optimal fleet appropriate for the conditions given in a mining project, the values of productivity and efficiency improve considerably. This is reflected in a better use of the machinery and in the reduction of unproductive times.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Saldaña, A.: Productividad en el ciclo de carguío y acarreo en el tajo chaquicocha bajo clima severo – minera Yanacocha. Tesis para optar el título profesional de ingeniero de minas, universidad nacional de ingeniería, Perú (2013)

    Google Scholar 

  2. Kostyuk, D., Thomas, S., Malkin, P., Stone, P.: Is truck queuing productive? In: Proceedings Orebody Modelling and Strategic Mine Planning Symposium, pp 267–274 (2014)

    Google Scholar 

  3. Tarshizi, E., Sturgul, J., Ibarra, V., Taylor, D.: Simulation and animation model to boost mining efficiency and enviro-friendly in multi-pit operations. Min. Sci. Technol. 25, 671–674 (2015)

    Article  Google Scholar 

  4. Dindarloo, S., Frimpong, S., Ozanloo, M.: A stochastic simulation framework for truck and shovel selection and sizing in open pit mines. J. South Afr. Inst. Min. Metall. 115, 209–219 (2015)

    Article  Google Scholar 

  5. Saadatmand, A., Sattarvand, J.: Simulation based investigation of different fleet management paradigms in open pit mines-a case study of sungun copper mine. Arch. Min. Sci. 60, 195–208 (2015)

    Google Scholar 

  6. Levano, L.: Incremento de productividad mina mediante herramientas six sigma. Tesis para optar el título profesional de ingeniero de minas, universidad nacional de ingeniería, Perú (2012)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Josemaria Gargate .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Gargate, J., Fung, S.A., Jara, J., Raymundo, C. (2019). Six Sigma Model Optimized for Reducing Downtime in an Open-Pit Mine. In: Iano, Y., Arthur, R., Saotome, O., Vieira Estrela, V., Loschi, H. (eds) Proceedings of the 4th Brazilian Technology Symposium (BTSym'18). BTSym 2018. Smart Innovation, Systems and Technologies, vol 140. Springer, Cham. https://doi.org/10.1007/978-3-030-16053-1_51

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-16053-1_51

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-16052-4

  • Online ISBN: 978-3-030-16053-1

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics