Skip to main content

Application of PMBOK to Improve the Deadline of Projects in SMEs Engineering Consultancies

  • Conference paper
  • First Online:
Proceedings of the 4th Brazilian Technology Symposium (BTSym'18) (BTSym 2018)

Abstract

In recent years, project management in consulting firms has grown due to greater demands for goods and services. However, this growth has meant that due to inefficiencies in the management, delays in project delivery times are generated. In addition, the same situation occurs for performance of personnel’s competences, as well as in defining the scope of the project. Therefore, this article proposes a model for the application of Project Management Body of Knowledge (PMBOK) based on knowledge management, which consists of the following areas: stakeholder management, risk management, cost management, time management, human resources management, quality management, integration management, and scope management. To show the ease of use of this model, a case study was conducted in an engineering consulting firm. The results of the application of the model were successful: the delay in project delivery times was reduced by 70% and the risks that may exist during execution were reduced by 67%. In addition, the company highlighted the success of the application of knowledge management because it improved the interaction and skills of staff by facilitating the implementation of the model.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Muriana, C., Vizzini, G.: Project risk management: A deterministic quantitative technique for assessment and mitigation. Int. J. Proj. Manage 35(3), 320–340 (2017)

    Article  Google Scholar 

  2. Laboratorio, T.I.: Informe del Caos 2015 (2016)

    Google Scholar 

  3. Basu, R.: Managing quality in projects: an empirical study. Int. J. Project Manage. 32(1), 178–187 (2014)

    Article  Google Scholar 

  4. Demirkesen, S., Ozorhon, B.: Impact of integration management on construction project management performance. Int. J. Proj. Manage. 35(8), 1639–1654 (2017)

    Article  Google Scholar 

  5. Doloi, H., Sawhney, A., Iyer, K.C., Rentala, S.: Analysing factors affecting delays in Indian construction projects. Int. J. Proj. Manage. 30(4), 479–489 (2012)

    Article  Google Scholar 

  6. Arditi, D., Nayak, S., Damci, A.: Effect of organizational culture on delay in construction. Int. J. Proj. Manage. 35(2), 136–147 (2017)

    Article  Google Scholar 

  7. Abrantes, R., Figueiredo, J.: Feature based process framework to manage scope in dynamic NPD portfolios. Int. J. Proj. Manage. 32(5), 874–884 (2014)

    Article  Google Scholar 

  8. Lines, B., Sullivan, K., Smithwick, J., Mischung, J.: Overcoming resistance to change in engineering and construction: change management factors for owner organizations. Int. J. Proj. Manage. 33(5), 1170–1179 (2015)

    Article  Google Scholar 

  9. Cerchione, R., Esposito, E.: Using knowledge management systems: a taxonomy of SME strategies. Int. J. Inf. Manage. 37(1), 1551–1562 (2017)

    Article  Google Scholar 

  10. Jasimuddin, S., Naqshbandi, M.: Knowledge-oriented leadership and open innovation: role of knowledge management capability in France-based multinationals. Int. Bus. Rev. 27(3), 701–713 (2017)

    Google Scholar 

  11. Dalmarco, G., Maehler, A., Trevisan, M., Mortari, J.: The use of knowledge management practices by Brazilian startup companies. J. Bus. Innov. 14(3), 226–234 (2017)

    Google Scholar 

  12. Hwang, Y., Lin, H., Shin, D.: Knowledge system commitment and knowledge sharing intention: the role of personal information management motivation. Int. J. Inf. Manage. 39, 220–227 (2018)

    Article  Google Scholar 

  13. Sanchez, O., Terlizzi, M., de Oliveira, H.: Cost and time Project management success factors for information systems development projects. Int. J. Proj. Manage. 35(8), 1608–1626 (2017)

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Maricielo Hinostroza .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Hinostroza, M., Chavez, P., Nuñez, V., Raymundo, C. (2019). Application of PMBOK to Improve the Deadline of Projects in SMEs Engineering Consultancies. In: Iano, Y., Arthur, R., Saotome, O., Vieira Estrela, V., Loschi, H. (eds) Proceedings of the 4th Brazilian Technology Symposium (BTSym'18). BTSym 2018. Smart Innovation, Systems and Technologies, vol 140. Springer, Cham. https://doi.org/10.1007/978-3-030-16053-1_47

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-16053-1_47

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-16052-4

  • Online ISBN: 978-3-030-16053-1

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics