Abstract

In this chapter we discuss the application of the second moment method in scheduling networks. The issue we focus here is on finding the probability distribution for the project completion time when there are multiple network paths in the project and therefore the critical path is itself uncertain. We present an approximate method to this problem and discuss its validity in a larger managerial context.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 69.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 89.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 119.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Keefer DL, Bodily SL (1983) Three-point approximations for continuous random variables. Manag Sci 29(5):595–609

    Article  Google Scholar 

  • MacCrimmon KR, Ryavec CA (1964) Analytical study of the PERT assumptions. Oper Res 12(1):16–37

    Article  Google Scholar 

  • McCabe B (2003) Construction engineering and project management III: Monte Carlo simulation for schedule risks. In: Proceedings of the 35th conference on Winter simulation: driving innovation. Winter Simulation Conference, pp 1561–1565

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Switzerland AG

About this chapter

Check for updates. Verify currency and authenticity via CrossMark

Cite this chapter

Damnjanovic, I., Reinschmidt, K. (2020). Approximate Risk Function for Project Durations. In: Data Analytics for Engineering and Construction Project Risk Management. Risk, Systems and Decisions. Springer, Cham. https://doi.org/10.1007/978-3-030-14251-3_8

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-14251-3_8

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-14250-6

  • Online ISBN: 978-3-030-14251-3

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics