Skip to main content

A Systematic Review Based on Earned Value Management and Quality

  • Conference paper
  • First Online:
Book cover 16th International Conference on Information Technology-New Generations (ITNG 2019)

Abstract

Currently the Project Management Institute (PMI) estimates that approximately 25% of the world’s Gross Domestic Product (GDP) is spent on projects of various kinds and that about 16.5 million professionals are directly involved in project management worldwide. This volume of projects and changes in the world scenario, increasingly competitive, generate the need for faster results, with higher quality, lower costs and shorter deadlines. Among the main techniques for analyzing cost, time and scope performance, the Earned Value Management (EVM) technique is considered to be the most reliable. Several formulas derived from EVM’s measurements are available and have been studied over the past 15 years. However, EVM has a significant limitation regarding quality in its method. The technique is effective in providing cost and schedule related information but is still weak in taking the quality factor into account. The main objective of this work is to contribute to studies that seek to add the quality component into EVM and comparing performance between them. This paper presents the results of a systematic review, providing a comprehensive summary of the main problems with the use of the EVM technique and the possible solutions found to improve its capacity to predict the impact of quality (possible bugs or nonconformities) in the course of a project’s life cycle.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.00
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Lipke, W.: Project duration forecasting…a comparison of earned value management methods to earned schedule. Meas. News 21(01), 24–31 (2008)

    Google Scholar 

  2. Lipke, W.: Statistical methods applied to EVM: the next frontier. CrossTalk 19, 20–23 (2006)

    Google Scholar 

  3. Lipke, W., Zwikael, O., Henderson, K., Anbari, F.: Prediction of project outcome. Int. J. Proj. Manag. 27(4), 400–407 (2009)

    Article  Google Scholar 

  4. Solomon, P.J.: Performance-based earned value. In: INCOSE International Symposium, vol. 15 (2007)

    Google Scholar 

  5. Leu, S.-S., Lin, Y.-C., Chen, T.-A., Ho, Y.-Y.: Improving traditional earned value management by incorporating statistical process charts. In: 23rd International Symposium on Automation and Robotics in Construction (2006)

    Google Scholar 

  6. Yerabolu, R., Institute, P.M.: Framework for Integrating Project Quality, Risk Management, and Integration Management Disciplines Into Earned Value Management (EVM) for Deriving Performance Based Earned Value (PBEV) (2010), pp. 275–279. Tokyo, Japan (2006)

    Google Scholar 

  7. Ma, X., Yang, B.: Optimization study of earned value method in construction project management. In: 2012 International Conference on Information Management, Innovation Management and Industrial Engineering, vol. 2, pp. 201–204 (2012)

    Google Scholar 

  8. Solomon, P.: Using cmmi to improve earned value management. Technical Report CMU/SEI-2002-TN-016, Software Engineering Institute, Carnegie Mellon University, Pittsburgh (2002)

    Google Scholar 

  9. Lipke, W.: Schedule is different. PMI CPM J. Meas. News. 1, 31–34 (2003).

    Google Scholar 

  10. Dodson, M., Defavari, G., de Carvalho, V.: Quality: the third element of earned value management. Proc. Comput. Sci. 64, 932–939 (2015), Conference on ENTERprise Information Systems/International Conference on Project MANagement/Conference on Health and Social Care Information Systems and Technologies, CENTERIS/ProjMAN/HCist 7–9 Oct (2015)

    Google Scholar 

  11. Siddiqui, S., Ullah, F., Thaheem, M.J, Gabriel, H.: Six sigma in construction: a review of critical success factors. 7, 06 (2016)

    Google Scholar 

  12. Thomas, G., Fernández, W.: Success in it projects: a matter of definition? Int. J. Proj. Manag. 26(7), 733–742 (2008) Special Issue: Achieving IT Project Success

    Google Scholar 

  13. Baccarini, D.: The Logical Framework Method for Defining Project Success. Project Management Institute, Newtown Square (1999)

    Google Scholar 

  14. Ika, L.A.: Project success as a topic in project management journals. Proj. Manag. J. 40(4), 6–19 (2009)

    Article  Google Scholar 

  15. Solomon, P.J.: Pratical perfomance-based earned value. In: Systems and Software Technology Conference (2006)

    Google Scholar 

  16. DeMarco, T.: Controlling Software Projects: Management, Measurement, and Estimates. Yourdon Press, New York (1982)

    Google Scholar 

  17. Khalid, T.A.: Controlling software cost using fuzzy quality based EVM. In: International Conference on Computing, Control, Networking, Electronics and Embedded Systems Engineering (2015)

    Google Scholar 

  18. de Souza, A.D., Rocha, A.R.C., Cristina, D., Constantino, B.A.: A proposal for the improvement of project’s cost predictability using earned value management and quality data – an empirical study, pp. 170–181. Springer, Berlin/Heidelberg (2014)

    Google Scholar 

  19. Salari, M., Bagherpour, M., Reihani, M.: A time -cost trade-off model by incorporating fuzzy earned value management: a statistical based approach. J. Intell. Fuzzy Syst. 28, 11 (2014)

    Google Scholar 

  20. Iranmanesh, S.H., Hojati, Z.T.: Intelligent systems in project performance measurement and evaluation, pp. 581–619. Springer, Cham (2015)

    Google Scholar 

  21. Lipke, W.: Is something missing from project management? CrossTalk 26, 16–20 (2013)

    Google Scholar 

  22. de Souza, A.D., Rocha, A.R.C.: A Proposal for the Improvement Predictability of Cost Using Earned Value Management and Quality Data, pp. 190–201. Springer, Berlin/Heidelberg (2013)

    Google Scholar 

  23. Solomon1, P.J.: Basing earned value on technical performance. CrossTalk 26, 25–28 (2013)

    Google Scholar 

  24. Naeni, L.M, Shadrokh, S., Salehipour, A.: A fuzzy approach for the earned value management. Int. J. Proj. Manag. 29(6), 764–772 (2011)

    Article  Google Scholar 

  25. Putnam, L.H., Myers, W.: Five Core Metrics: Intelligence Behind Successful Software Management. Dorset House Publishing Co., Inc., New York (2003)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Christopher de Souza Lima Francisco .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

de Souza Lima Francisco, C., de Souza, A.D. (2019). A Systematic Review Based on Earned Value Management and Quality. In: Latifi, S. (eds) 16th International Conference on Information Technology-New Generations (ITNG 2019). Advances in Intelligent Systems and Computing, vol 800. Springer, Cham. https://doi.org/10.1007/978-3-030-14070-0_20

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-14070-0_20

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-14069-4

  • Online ISBN: 978-3-030-14070-0

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics